SSES definition

SSES or “Site” means the Susquehanna steam electric station located in Berwick, Pennsylvania.
SSES means a Sewer System Evaluation Survey, which is a systematic examination of a sanitary sewer system or portion thereof to, at a minimum: (i) assess the condition of sewers, manholes, pump stations and associated appurtenances, (ii) identify I/I sources, locations, and associated extraneous flow rates, (iii) characterize the wastewater flow; and (iv) determine technically feasible and cost-effective approaches of rehabilitation.
SSES means the Sanitary Sewer Evaluation Survey approved by DEQ on December 12, 2003.

Examples of SSES in a sentence

  • Prepare and submit the completed data analysis and SSES worksheet with all sections relevant to the survey method and results to System Agency for the initial draft of the Annual Synar Report (ASR) by the date listed in the Synar Inspection Survey Timeline/Task List each fiscal year.

  • For Services not on ▇▇▇▇▇▇▇▇' network, the SSES standard for local access DS3 Service is established by the Third Party Services provider.

  • No. 8-312-0213151/ EPA Contract No. EP-C-11-036 ID/IQ with FFP or CPFF Task Orders Sub to RTI International/U.S. Environmental Protection Agency (EPA), Cincinnati, OH Scientific, Technical, Research, Engineering, and Monitoring Support II (STREAMS II) Ms. ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇enior Manager, Subcontracts RTI International Global Supply Chain SSES Subcontracts P.▇.

  • The fourth phase (Fiscal Year 2019-20) primarily included flow monitoring, SSES and rehabilitation design for the Bode Road Lift Station (LS) area and construction services for North Braintree.

  • The Clean Water Trust will also continue to solicit and finance projects that include SSES and Infiltration and Inflow (I/I) studies and subsequent sewer system improvements.

  • The second phase (Fiscal Year 2017-18) primarily included ▇▇▇▇▇▇ Basin SSES, rehabilitation design for the Walnut and ▇▇▇▇▇▇ Basins and construction services for the Walnut Basin.

  • Utilize the CSAP Synar Survey Estimation System (SSES) worksheet to calculate final violation rate.

  • The GIS/MMS shall be used for both SSES work as well as operations and maintenance.

  • The third phase (Fiscal Year 2018-19) primarily included flow monitoring for the full Braintree Basin, North Braintree SSES, rehabilitation design for North Braintree and construction services for the Walnut and ▇▇▇▇▇▇ Basins.

  • A SONET Severely Errored Second ("SSES") is any one-second interval in which 2400 or more STS Path BIP errors were detected, AIS-P, LOP-P, or lower level, traffic related near end defect is detected in accordance with Telecordia Technologies Generic Criteria GR-253-CORE, Section 6.2.2.5.1. The number of Severely Errored Seconds shall not exceed eight (8) in a twenty-four hour period averaged over one month (720 hours).