Sewer System Management Plans or “SSMPs” shall mean those plans required

Examples of Sewer System Management Plans in a sentence

  • City of Chino and IEUA Sewer System Management Plans (SSMPs) The SSMPs were developed for the purposes of complying with the SWRCB adopted Order No. 2006-0003, Statewide General Waste Discharge Require- ments for Sanitary Sewer Systems (WDR).

  • The cost to comply with State and Federal Regulations, (required reporting, development of Sewer System Management Plans [SSMP], on-going television inspection of the sewer system, spot repairs identified through the television inspections, and acquisitions or replacement of equipment used to maintain and repair the sewer systems).

  • The agencies are managing the water and wastewater utilities through the use of a number of plans to ensure that services are delivered in an efficient, cost-effective manner, including master plans, Urban Water Management Plans, Sewer System Management Plans, Capital Improvement Programs, and city and county General Plans.

  • The State requires enrolled wastewater operators to develop and implement Sewer System Management Plans to reduce the incidence of Sanitary Sewer Overflows.

  • A Guide for Developing and Updating of Sewer System Management Plans (SSMPs),” September 2015.

  • Recommendations 3.1 Global Recommendations 3.1.1 The ERC should consult with the IASC Principals and major stakeholders to agree on designating operational accountability for the various sectors and crosscutting areas to respond to the protection and care of IDPs. A similar approach should be followed in order to designate lead organizations in sectors where this is missing and would seem appropriate.

  • The sewer master plans also evaluate risks associated with flooding, sea level rise, and projected trends in I&I and, if warranted, identify proposed facilities improvements to guard against such risks.• Updates to Sewer System Management Plans (SSMPs).

  • Potential Future Employment You are considering working as a nonprofit organization employee or as a consultant in the following manner related to the SS WDR: • Assist an individual sanitation agency to develop system-specific Spill Emergency Response Plans and Sanitary Sewer System Management Plans – and/or • Train or educate consultants and industry association representatives on how to implement the requirements while considering system-specific conditions and considerations.

  • The objective of the SSS WDRs is to reduce the number of SSOs and the volume of sewage spilled across the state by: (1) increasing transparency in terms of making spill data available to the public; and (2) encouraging the proper operation and maintenance of sanitary sewer systems by requiring the development and implementation of Sewer System Management Plans (SSMPs).

  • Purpose and Background This Task Order Solicitation (TOS) has been issued to solicit the services of a qualified consultant to assist Los Angeles Sanitation (LASAN) with a comprehensive and independent review of the City’s Sewer System Management Plans (SSMPs) and the Clean Water Program (CWP).

Related to Sewer System Management Plans

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Stormwater management system means any equipment, plants,

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Wastewater System means a system of wastewater collection, treatment,

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Municipal separate storm sewer system (MS4 means a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains):

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Infrastructure means infrastructure serving the County and improved or unimproved real estate and personal property, including machinery and equipment, used in the operation of the Project, within the meaning of Section 4-29-68 of the Code.

  • public service infrastructure means publicly controlled infrastructure of the following kinds:

  • business vertical means a distinguishable component of an enterprise that is engaged in the supply of individual goods or services or a group of related goods or services which is subject to risks and returns that are different from those of the other business verticals.

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Electric System Upgrades means any Network Upgrades, Distribution Upgrades, or Interconnection Facilities that are determined to be necessary by the CAISO or Participating Transmission Owner, as applicable, to physically and electrically interconnect the Project to the Participating Transmission Owner’s electric system for receipt of Energy at the Point of Interconnection (as defined in the CAISO Tariff) if connecting to the CAISO Grid, or the Interconnection Point, if connecting to a part of the Participating TO’s electric system that is not part of the CAISO Grid.

  • Sewer System means pipelines or conduits, pumping stations, force mains, vehicles, vessels, conveyances, injection wells, and all other constructions, devices, and appliances appurtenant thereto used for conducting sewage or industrial waste or other wastes to a point of ultimate disposal or disposal to any water of the state. To the extent that they are not subject to section 402 of the federal Water Pollution Control Act, ditches, pipes, and drains that serve only to collect, channel, direct, and convey nonpoint runoff from precipitation are not considered as sewer systems for the purposes of this part of this division.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Large municipal separate storm sewer system means all municipal separate storm sewers that are either:

  • Wastewater treatment plant means a facility designed and constructed to receive, treat, or store waterborne or liquid wastes.

  • Small municipal separate storm sewer system or "small MS4" means all separate storm sewers that are (i) owned or operated by the United States, a state, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to state law) having jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes, including special districts under state law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under § 208 of the CWA that discharges to surface waters and (ii) not defined as "large" or "medium" municipal separate storm sewer systems or designated under 4VAC50-60-380 A 1. This term includes systems similar to separate storm sewer systems in municipalities, such as systems at military bases, large hospital or prison complexes, and highway and other thoroughfares. The term does not include separate storm sewers in very discrete areas, such as individual buildings.

  • Safety Management System means a systematic approach to managing safety, including the necessary organizational structures, accountabilities, policies and procedures;

  • Municipal separate storm sewer system means a conveyance or system of conveyances including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Pest Management Plan and “PMP” means the Recipient’s plan dated December 13, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.