{"component": "definition", "props": {"groups": [{"snippet": "means the portion of electricity that supplies energy to the Load.**", "samples": [{"hash": "5t8hHKyB9wO", "uri": "https://www.nerc.com/AboutNERC/RulesOfProcedure/Appendix%202%20eff%2020240627_signed.pdf", "label": "www.nerc.com", "score": 17.0680580139, "published": false}, {"hash": "h4nMOVoVrLH", "uri": "https://www.nerc.com/AboutNERC/RulesOfProcedure/ROP_App-2_IBR_Redline.pdf", "label": "www.nerc.com", "score": 11.8473644257, "published": false}, {"hash": "5Lhpw56z1xB", "uri": "https://www.nerc.com/AboutNERC/RulesOfProcedure/ROP_App-2_IBR_Clean.pdf", "label": "www.nerc.com", "score": 11.8473644257, "published": false}], "size": 27, "snippet_links": [], "hash": "fc6b8c40daa3f8cecdc7bbbc31a3883b", "id": 1}, {"snippet": "means the power component required to do real work, which is measured in kilowatts (kW);", "samples": [{"hash": "2TfP6SJNHGG", "uri": "https://www.festivalhydro.com/media/2786/download?attachment", "label": "www.festivalhydro.com", "score": 17.8497600555, "published": false}, {"hash": "2jBOiy9WMVp", "uri": "https://ntpower.ca/sites/nmt/files/2024-06/Conditions%20of%20Service%202024_EV%20Update_20240603_0.pdf", "label": "ntpower.ca", "score": 16.2422580719, "published": false}, {"hash": "7TVsmIMBNqG", "uri": "https://www.elkenergy.com/wp-content/uploads/2021/12/E.L.K.-Energy-Inc_Conditions-of-Service.pdf", "label": "www.elkenergy.com", "score": 10.9794664383, "published": false}], "size": 22, "snippet_links": [], "hash": "bc5201023a2fc148197d5484df684ba3", "id": 2}, {"snippet": "means the rate of producing, transferring, or using electrical energy, expressed in kilowatts (\u201ckW\u201d) or megawatts (\u201cMW\u201d).", "samples": [{"hash": "d5hmpigDdjg", "uri": "https://elenchus.ca/cerise/library/decisions/2002/documents/EUB-2002-087.pdf", "label": "elenchus.ca", "score": 10.386721611, "published": false}, {"hash": "3ACLCQxZDGl", "uri": "https://www.auc.ab.ca/regulatory_documents/ProceedingDocuments/2002/2002-087.pdf", "label": "www.auc.ab.ca", "score": 5.0, "published": false}, {"hash": "iwYjzetca3y", "uri": "https://www.auc.ab.ca/regulatory_documents/ProceedingDocuments/2000/2000-57.pdf", "label": "www.auc.ab.ca", "score": 5.0, "published": false}], "size": 6, "snippet_links": [{"key": "rate-of", "type": "clause", "offset": [10, 17]}, {"key": "electrical-energy", "type": "clause", "offset": [52, 69]}], "hash": "2e272e9b35e9141eb1f65e9730038e59", "id": 3}, {"snippet": "means the power component required to do real work, which is measured in kiloWatts (kW); \u201cRegulations\u201d means the regulations made under the Ontario Energy Board Act or the Electricity Act;", "samples": [{"hash": "kxja9mCr1aJ", "uri": "https://www.torontohydro.com/documents/d/guest/conditions-of-service-main-document-as-of-may-23-2024", "label": "www.torontohydro.com", "score": 12.1937026978, "published": false}, {"hash": "dDTgDqnsmfV", "uri": "https://www.torontohydro.com/documents/d/guest/conditions-of-service-main-document-nov-2023", "label": "www.torontohydro.com", "score": 11.9171800613, "published": false}, {"hash": "38KYGwDfTY6", "uri": "https://www.torontohydro.com/documents/20143/181047281/conditions-of-service.pdf/8b2653bb-50ff-b8a0-57ab-ab9a39e4812f?t=1667248131885", "label": "www.torontohydro.com", "score": 11.4093084335, "published": false}], "size": 5, "snippet_links": [{"key": "the-regulations", "type": "clause", "offset": [109, 124]}, {"key": "ontario-energy-board-act", "type": "definition", "offset": [140, 164]}, {"key": "electricity-act", "type": "clause", "offset": [172, 187]}], "hash": "7acd5673df6515036038f3c4edf50f7c", "id": 4}, {"snippet": "means the power component required to perform real work, and is measured in kilowatts (kW);", "samples": [{"hash": "knBbUkIJxtO", "uri": "/contracts/knBbUkIJxtO#real-power", "label": "Conditions of Service", "score": 21.8213558197, "published": true}, {"hash": "b3b8FfcjhSm", "uri": "/contracts/b3b8FfcjhSm#real-power", "label": "Connection Agreement", "score": 21.8213558197, "published": true}], "size": 2, "snippet_links": [], "hash": "3fbe47c2aaf12fa489aafaa553ddb051", "id": 5}, {"snippet": "means Energy produced at a specified rate and which can be measured in megawatts (\u201cMW\u201d) or kilowatts (\u201ckW\u201d).", "samples": [{"hash": "lS260ApVf0B", "uri": "/contracts/lS260ApVf0B#real-power", "label": "Energy Purchase Agreement", "score": 28.4047336578, "published": true}, {"hash": "7z7yjBactVj", "uri": "https://valleycleanenergy.org/wp-content/uploads/VCE-5-14-2020-Special-Board-Meeting-Packet-1.pdf", "label": "Executive Order", "score": 19.0367412567, "published": false}], "size": 2, "snippet_links": [{"key": "specified-rate", "type": "definition", "offset": [27, 41]}], "hash": "eaaad53431ee2209082d9bb7b126a622", "id": 6}, {"snippet": "means the rate of producing, transferring, or using electrical energy, expressed in megawatts (\u201cMW\u201d).", "samples": [{"hash": "iWoaWCrNcue", "uri": "https://www.bcuc.com/Documents/Proceedings/2009/DOC_21302_B1-11_BCTC_Supplemental-Evidence_TCE-Complaint.pdf", "label": "www.bcuc.com", "score": 5.0, "published": false}, {"hash": "aKVjNUGlkrO", "uri": "https://www.auc.ab.ca/regulatory_documents/ProceedingDocuments/2008/U2008-217.pdf", "label": "www.auc.ab.ca", "score": 3.0, "published": false}], "size": 2, "snippet_links": [{"key": "rate-of", "type": "clause", "offset": [10, 17]}, {"key": "electrical-energy", "type": "clause", "offset": [52, 69]}], "hash": "a0ee937767b107233e161ca8379a0b7c", "id": 7}, {"snippet": "means the power component required to do real work, which is measured in kilo Watts (kW);", "samples": [{"hash": "cJaWe3zqu4b", "uri": "http://www.chapleau.ca/en/townshipservices/resources/Chapleau-PUC---Condition-of-Service-Revised-Oct-25-2017.pdf", "label": "www.chapleau.ca", "score": 9.42710495, "published": false}], "size": 1, "snippet_links": [], "hash": "f79cfbd2ff7369d9b9463cdaa8b9c8e2", "id": 8}, {"snippet": "means the power component that can be used to perform real work, measured in kiloWatts (kW).", "samples": [{"hash": "fYYv7hbwWC5", "uri": "https://static.hydroottawa.com/documents/specifications/ECG0008.pdf", "label": "static.hydroottawa.com", "score": 8.0951404572, "published": false}], "size": 1, "snippet_links": [], "hash": "13f01286c7a8dee220edaf393bf7bda2", "id": 9}, {"snippet": "means Real Power Holdings Limited, which through (1)", "samples": [{"hash": "2jGH1cA2ole", "uri": "https://www1.hkexnews.hk/listedco/listconews/sehk/2010/1004/ltn201010041768.pdf", "label": "www1.hkexnews.hk", "score": 4.3778233528, "published": false}], "size": 1, "snippet_links": [], "hash": "a78a7af6abaf11ff16be683c326bbd88", "id": 10}], "next_curs": "ClcSUWoVc35sYXdpbnNpZGVyY29udHJhY3RzcjMLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiITcmVhbC1wb3dlciMwMDAwMDAwYQyiAQJlbhgAIAA=", "definition": {"snippet": "means the portion of electricity that supplies energy to the Load.**", "size": 70, "title": "Real Power", "id": "real-power", "examples": ["The NYS Transmission System <strong>Real Power</strong> Losses associated with each additional MWh of consumption by Load, or each additional MWh transmitted under a Bilateral Transaction as measured at the Points of Withdrawal.", "Distribution Company shall not be responsible for any <strong>Real Power</strong> Losses associated with Firm Transmission Service.", "Owner and HQUS shall be responsible for the delivery of the scheduled amounts of energy associated up to the Contract Capacity to the Delivery Point without reduction for <strong>Real Power</strong> Losses.", "The Transmission Provider is not obligated to provide <strong>Real Power</strong> Losses.", "Bonneville shall create a new Schedule 11, as reflected in the Settlement Tariff, Attachment 2, to document the <strong>Real Power</strong> Loss Factor.", "The Transmission Provider is not obligated to replace <strong>Real Power</strong> Losses.", "The applicable <strong>Real Power</strong> Loss factors for the Transmission Provider are set forth in Schedule 9-A of this Tariff.", "The applicable <strong>Real Power</strong> Loss factors are specified in the Service Agreements.", "<strong>Real Power</strong> and Reactive Power flows to and from the Generating Facility shall be measured at or, at IPA\u2019s option, compensated to, the Point of Interconnection.", "This analysis is provided in the DEF\u2019s Procedures For Changing The <strong>Real Power</strong> Loss Factor (currently Attachment Q) in its Open Access Transmission Tariff and DEF\u2019s fuel cost recovery filing with the FPSC."], "related": [["station-power", "Station Power", "Station Power"], ["net-power", "net power", "net power"], ["federal-power-act", "Federal Power Act", "Federal Power Act"], ["electric-power-train", "Electric power train", "Electric power train"], ["repower", "Repower", "Repower"]], "related_snippets": [], "updated": "2025-07-10T04:27:38+00:00"}, "json": true, "cursor": ""}}