R19 definition

R19. Having read the instrument aloud, and after explaining the scope and legal consequences of the same, and the right the persons appearing before me have to read the instrument directly, they did acknowledge their conformity with the terms stated herein and signed in witnesseth thereof….
R19 means reaction 19 in our mechanism (see appendix A) and “k19” refers to its rate coefficient expression. Also, –R19 and k–19 refer to the reverse direction. Where other, or no, nomenclature is used where a number after R or k would be expected, the reaction is not included in the current mechanism.

Examples of R19 in a sentence

  • Any vacancy on the Review Board prior to or after the commencement of the hearing of evidence and argument (the “Arbitration Hearing”) shall be handled in accordance with Commercial Arbitration Rule R-19, except that if a vacancy arises after the Arbitration Hearing has commenced, a substitute Member shall be selected in accordance with the rules under which the original Member was selected.

  • Terminating Party Reason Procedure Amount due The Client R22, R23, R24,R25 P1, P2 and P5 A1 (excluding principal bullet point 3) and A2 Clause 90.2 Delete “and A4” from the amount due to the Contractor on termination for reasons R1-R10, R16 and R19.

  • Material: (Fiberglass) 6” batt insulation (R-19) in walls, foam and caulk package at exterior protrutions, blown-in insulation (R-30) in attic.

  • At exterior walls, the value of insulation will be a minimum of R-19.

  • EOP-005-3 R1.9 Operating Processes for transferring authority back to the Balancing Authority in accordance with its Reliability Coordinator’s criteria.

  • The properties are identified as follows: MONTANA ADDITION, S22, T13 N, R19 W, ▇▇▇▇▇ ▇▇, ▇▇▇ ▇, & W16' OF 7 and MONTANA ADDITION, S22, T13 N, R19 W, BLOCK 12, Lot 1 - 6, & E14' OF 7 (hereinafter referred to as “South 4th East and ▇▇▇▇▇▇ Ave”).

  • Specifically, the Operator shall obtain and provide documentation to the DEA of validation of the measurement system for CO2 storage reporting from an Accredited Third Party as part of completing Programme Milestone 2.1 as per R-19, Appendix 3, Requirements specification.

  • Where multiple types of insulation are listed for a single location, Seller anticipates that one or both types of insulation will be used in the Home: Exterior walls Batt Insulation R-20 Demising walls Mineral Wool Insulation n/a Floors Batt Insulation R-30 Crawl space walls Batt Insulation Rigid Insulation R-19 R-15 Ceiling/roof Batt Insulation Blown-In Insulation R-49 R-49 “R-Value” indicates the resistance of insulation to heat flow.

  • The unit has batt insulation to a thickness of 3/4 Inches in the exterior walls which has an R-value of 19 [R-19].

  • Seller and Purchaser hereby acknowledge pursuant to 16 CFR § 460.16 of the Federal Trade Commission Regulations regarding labeling and advertising of home insulation, that the types, thicknesses and R-Values of insulation installed in the Unit is set forth below: Exterior Walls Glass Fiber Batt Mineral Fiberboard 6” 2.5” R-19 R-7.5 Continuous Insulation The “R-value” indicates the resistance of insulation to heat flow.