{"component": "definition", "props": {"groups": [{"samples": [{"hash": "g2j1Occ1cdL", "uri": "https://www.dot.ny.gov/main/business-center/designbuildproject59/repository/D900059%20-%20RFQ%20-%2020230217.pdf", "label": "Contract", "score": 13.562628746, "published": false}, {"hash": "erBgCPEC0M7", "uri": "https://www.dot.ny.gov/main/business-center/designbuildproject58/repository/D900058%20-%20RFQ%20-%2020230120.pdf", "label": "Contract", "score": 13.5242986679, "published": false}, {"hash": "d6z4flYmk5f", "uri": "https://www.dot.ny.gov/main/business-center/designbuildproject57/repository/D900057%20-%20RFQ%20%2020221007.pdf", "label": "Contract", "score": 13.3805608749, "published": false}], "snippet_links": [{"key": "the-total", "type": "clause", "offset": [6, 15]}, {"key": "performed-by", "type": "clause", "offset": [34, 46]}, {"key": "the-design", "type": "clause", "offset": [47, 57]}, {"key": "construction-inspection-professional-engineering-firm", "type": "definition", "offset": [77, 130]}, {"key": "materials-testing-firm-or-laboratory", "type": "definition", "offset": [139, 175]}, {"key": "to-ensure", "type": "clause", "offset": [220, 229]}, {"key": "work-performed", "type": "definition", "offset": [239, 253]}, {"key": "contract-requirements", "type": "definition", "offset": [292, 313]}, {"key": "quality-control-activities", "type": "definition", "offset": [327, 353]}, {"key": "design-review", "type": "clause", "offset": [433, 446]}, {"key": "approval-of", "type": "definition", "offset": [502, 513]}, {"key": "working-plans", "type": "definition", "offset": [514, 527]}, {"key": "for-construction", "type": "definition", "offset": [529, 545]}, {"key": "materials-handling", "type": "definition", "offset": [627, 645]}, {"key": "construction-quality", "type": "clause", "offset": [650, 670]}, {"key": "testing-of-materials", "type": "clause", "offset": [697, 717]}, {"key": "field-testing", "type": "clause", "offset": [752, 765]}, {"key": "materials-certifications", "type": "clause", "offset": [804, 828]}, {"key": "record-keeping", "type": "definition", "offset": [830, 844]}, {"key": "equipment-monitoring", "type": "clause", "offset": [850, 870]}, {"key": "process-control", "type": "clause", "offset": [899, 914]}, {"key": "and-monitoring", "type": "clause", "offset": [916, 930]}, {"key": "environmental-compliance", "type": "clause", "offset": [934, 958]}, {"key": "design-and-construction", "type": "clause", "offset": [1014, 1037]}, {"key": "scope-of-work-to-be-performed", "type": "clause", "offset": [1051, 1080]}, {"key": "the-rfq", "type": "clause", "offset": [1138, 1145]}], "size": 70, "snippet": "means the total of all activities performed by the Design-Builder, Designer, Construction Inspection Professional Engineering Firm and the Materials Testing Firm or Laboratory, subcontractors, producers or manufacturers to ensure that the Work performed by the Design-Builder conforms to the Contract requirements. For design, Quality Control activities shall include, but not be limited to, procedures for design quality, checking, design review including reviews for constructability, and review and approval of Working Plans. For construction, Quality Control activities shall include, but not be limited to, procedures for materials handling and construction quality, inspection, sampling and testing of materials both on site and at the plant(s), field testing of materials, obtaining and verifying Materials Certifications, record keeping, and equipment monitoring and calibration, production process control, and monitoring of environmental compliance. Quality Control also includes documentation of all QC design and construction efforts. The Scope of Work to be performed as part of the Quality Control task may be changed after the RFQ Phase.", "hash": "a75ff4be79b9e46e5460eca8e61e5ae4", "id": 1}, {"samples": [{"hash": "1wh3UlOrfnr", "uri": "https://www.contexte.com/medias/pdf/medias-documents/2017/09/Compromis_Estonie_gouvernance.pdf?token=%22Az5rtTGUYm8VF", "label": "www.contexte.com", "score": 19.9666919708, "published": false}, {"hash": "2Ao4GBpZoaS", "uri": "https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CONSIL:ST_7204_2017_REV_4", "label": "eur-lex.europa.eu", "score": 12.854393959, "published": false}, {"hash": "8SyGZLbPmtX", "uri": "https://www.energy-community.org/dam/jcr:e24c911e-f0f6-4f26-a152-ec79d85ee1a4/REGULATION_EU20181999.pdf", "label": "www.energy-community.org", "score": 11.8186178207, "published": false}], "snippet_links": [{"key": "technical-activities", "type": "clause", "offset": [26, 46]}, {"key": "quality-of-the-information", "type": "clause", "offset": [74, 100]}, {"key": "purpose-of", "type": "clause", "offset": [133, 143]}, {"key": "data-integrity", "type": "clause", "offset": [153, 167]}, {"key": "errors-and-omissions", "type": "definition", "offset": [226, 246]}, {"key": "other-material", "type": "definition", "offset": [283, 297]}, {"key": "quality-assurance-activities", "type": "clause", "offset": [322, 350]}], "size": 48, "snippet": "means a system of routine technical activities to measure and control the quality of the information and estimates compiled with the purpose of ensuring data integrity, correctness and completeness, identifying and addressing errors and omissions, documenting and archiving data and other material used, and recording all quality assurance activities;", "hash": "5b09483de1c18dfde919c3d1879db0ce", "id": 2}, {"samples": [{"hash": "7xLxf93z3Ci", "uri": "https://www.legis.iowa.gov/docs/aco/arc/7360C.pdf", "label": "Notice", "score": 22.9189014435, "published": false}, {"hash": "gyPJtU8L36B", "uri": "https://www.legis.iowa.gov/docs/aco/arc/8124C.pdf", "label": "www.legis.iowa.gov", "score": 19.0679225922, "published": false}, {"hash": "4Xdba8WTHkk", "uri": "https://www.legis.iowa.gov/docs/iac/chapter/03-05-2025.641.154.pdf", "label": "www.legis.iowa.gov", "score": 17.0113620758, "published": false}], "snippet_links": [{"key": "analytical-procedure", "type": "definition", "offset": [46, 66]}, {"key": "to-ensure", "type": "clause", "offset": [67, 76]}, {"key": "measurement-system", "type": "clause", "offset": [86, 104]}, {"key": "state-of", "type": "definition", "offset": [123, 131]}], "size": 38, "snippet": "means a set of measures implemented within an analytical procedure to ensure that the measurement system is operating in a state of statistical control in which errors have been reduced to acceptable levels.", "hash": "7c952c9ab282488bc94a86833e2d10e1", "id": 3}, {"samples": [{"hash": "6rsyGnF8GgB", "uri": "https://www.legis.iowa.gov/docs/ACO/GNAC/iacpdf(5-10-06)/iac/641iac/64141/64141pp1.pdf", "label": "www.legis.iowa.gov", "score": 18.475730896, "published": false}, {"hash": "axexfxldU1Y", "uri": "https://www.legis.iowa.gov/DOCS/ACO/GNAC/iacpdf(8-4-04)/iac/641iac/64141/64141pp1.pdf", "label": "www.legis.iowa.gov", "score": 17.612865448, "published": false}, {"hash": "5jO4DCnbZIx", "uri": "https://www.legis.iowa.gov/docs/ACO/GNAC/iacpdf(3-1-06)/iac/641iac/64141/64141pp1.pdf", "label": "www.legis.iowa.gov", "score": 17.5888767242, "published": false}], "snippet_links": [{"key": "standards-of-quality", "type": "definition", "offset": [73, 93]}, {"key": "equipment-performance", "type": "clause", "offset": [97, 118]}, {"key": "the-acquisition", "type": "clause", "offset": [123, 138]}, {"key": "interpretation-of", "type": "clause", "offset": [143, 160]}, {"key": "radiographic-images", "type": "definition", "offset": [161, 180]}], "size": 35, "snippet": "means the actual process of testing and maintaining the highest possible standards of quality in equipment performance and the acquisition and interpretation of radiographic images.", "hash": "1a04c4317dae8f0b17df6636ccb1b227", "id": 4}, {"samples": [{"hash": "hJmn9HhE0LQ", "uri": "https://integratecal.net/wp-content/uploads/2018/05/CA-DoPH-Manufactured-Cannabis-Safety-Branch-Final-Text-of-Emergency-Regulations-as-of-12-08-17.pdf", "label": "integratecal.net", "score": 10.8631076813, "published": false}, {"hash": "7URZZjM5bl1", "uri": "https://www.cdph.ca.gov/Programs/OLS/CDPH%20Document%20Library/DPH-17-010E%20TEXT_Readopt%2020180515%20FINAL%20-%20ADA.pdf", "label": "www.cdph.ca.gov", "score": 10.1704311371, "published": false}, {"hash": "gnJ6nBJdLKW", "uri": "https://www.cdph.ca.gov/Programs/CEH/DFDCS/MCSB/CDPH%20Document%20Library/DPH17010_FiledDraftText.pdf", "label": "www.cdph.ca.gov", "score": 10.1704311371, "published": false}], "snippet_links": [{"key": "procedure-for", "type": "clause", "offset": [44, 57]}, {"key": "cannabis-product", "type": "definition", "offset": [84, 100]}], "size": 31, "snippet": "means a planned and systematic operation or procedure for ensuring the quality of a cannabis product.", "hash": "8ce548638691994dee78fb3c619fba16", "id": 5}, {"samples": [{"hash": "e2gy5pff92C", "uri": "https://docs.legis.wisconsin.gov/code/register/2021/782b/remove/nr149.pdf", "label": "docs.legis.wisconsin.gov", "score": 16.0348873138, "published": false}, {"hash": "ar7XHZcMubs", "uri": "https://docs.legis.wisconsin.gov/code/register/2021/782b/insert/nr149.pdf", "label": "docs.legis.wisconsin.gov", "score": 15.9680204391, "published": false}, {"hash": "b6WSOohrLY9", "uri": "https://docs.legis.wisconsin.gov/code/register/2010/660b/remove/nr149.pdf", "label": "docs.legis.wisconsin.gov", "score": 15.377327919, "published": false}], "snippet_links": [{"key": "overall-system", "type": "clause", "offset": [10, 24]}, {"key": "technical-activities", "type": "clause", "offset": [28, 48]}, {"key": "product-or-service", "type": "definition", "offset": [98, 116]}], "size": 19, "snippet": "means the overall system of technical activities designed to measure and control the quality of a product or service that meets the stated needs of users.", "hash": "86c31a1edd63022b9d331211ea393296", "id": 6}, {"samples": [{"hash": "3J09ISTpm2l", "uri": "https://www.legislation.gov.uk/eudr/2013/59/2014-01-17/data.pdf", "label": "www.legislation.gov.uk", "score": 11.0533876419, "published": false}, {"hash": "bXhNDNIwo7r", "uri": "https://www.dcu.ie/sites/default/files/2020-09/radiological_protection_act_1991_regulations_2019_s.i._no._30_of_2019_1.pdf", "label": "www.dcu.ie", "score": 10.3566055298, "published": false}, {"hash": "e4xCesJTzFt", "uri": "https://consultations.dh.gov.uk/health-protection/medical-exposures-to-ionising-radiation/supporting_documents/Annex%20I%20Draft%20Ionising%20Radiation%20Medical%20Exposure%20Regulations%202018.doc", "label": "consultations.dh.gov.uk", "score": 10.1704311371, "published": false}], "snippet_links": [{"key": "of-operations", "type": "clause", "offset": [14, 27]}, {"key": "to-maintain", "type": "clause", "offset": [79, 90]}, {"key": "and-maintenance", "type": "clause", "offset": [149, 164]}, {"key": "required-levels", "type": "definition", "offset": [168, 183]}, {"key": "characteristics-of", "type": "definition", "offset": [191, 209]}, {"key": "performance-of-equipment", "type": "clause", "offset": [210, 234]}], "size": 19, "snippet": "means the set of operations (programming, coordinating, implementing) intended to maintain or to improve quality. It includes monitoring, evaluation and maintenance at required levels of all characteristics of performance of equipment that can be defined, measured, and controlled;", "hash": "bfc8bc725c5292cdd7f46084466ca920", "id": 7}, {"samples": [{"hash": "gne63yeAdSU", "uri": "https://ikewebstorage.blob.core.windows.net/projects/files/EastKellogg_PDB_RFQ_Addendum_1.pdf", "label": "ikewebstorage.blob.core.windows.net", "score": 9.2094459534, "published": false}, {"hash": "1YVjw6Px0mp", "uri": "https://ikewebstorage.blob.core.windows.net/eastkellogg/files/EastKellogg_PDB_RFQ_Addendum_1_redline_to_original.pdf", "label": "ikewebstorage.blob.core.windows.net", "score": 9.2094459534, "published": false}, {"hash": "eUZm9eeBoa4", "uri": "https://ikewebstorage.blob.core.windows.net/eastkellogg/files/Kellogg_RFQ.pdf", "label": "ikewebstorage.blob.core.windows.net", "score": 9.1587953568, "published": false}], "snippet_links": [{"key": "the-total", "type": "clause", "offset": [6, 15]}, {"key": "performed-by", "type": "clause", "offset": [34, 46]}, {"key": "the-design", "type": "clause", "offset": [47, 57]}, {"key": "lead-contractor", "type": "clause", "offset": [67, 82]}, {"key": "lead-designer", "type": "definition", "offset": [84, 97]}, {"key": "key-personnel", "type": "definition", "offset": [99, 112]}, {"key": "to-ensure", "type": "clause", "offset": [147, 156]}, {"key": "all-work", "type": "clause", "offset": [162, 170]}, {"key": "contract-requirements", "type": "definition", "offset": [177, 198]}, {"key": "design-reviews", "type": "definition", "offset": [225, 239]}, {"key": "material-handling", "type": "definition", "offset": [266, 283]}, {"key": "maintenance-of", "type": "clause", "offset": [318, 332]}, {"key": "testing-equipment", "type": "clause", "offset": [346, 363]}, {"key": "plan-review", "type": "definition", "offset": [373, 384]}, {"key": "document-control", "type": "clause", "offset": [386, 402]}, {"key": "process-control", "type": "clause", "offset": [415, 430]}], "size": 19, "snippet": "means the total of all activities performed by the Design-Builder, Lead Contractor, Lead Designer, Key Personnel Firm, producers, or manufacturers to ensure that all Work meets Contract requirements. Quality Control includes design reviews and checks, inspection of material handling and construction, calibration and maintenance of sampling and testing equipment, working plan review, document control, production process control, and any inspection, sampling, and testing done for these purposes. Quality Control also includes documentation of Quality Control efforts.", "hash": "b5cd0abbc7bcc2b8e97e919778a9d4d5", "id": 8}, {"samples": [{"hash": "16uoW9uBtRY", "uri": "https://caa.go.ug/wp-content/uploads/2023/06/Civil-Aviation-Aeronautical-Information-Services-Regulations-2022.pdf", "label": "caa.go.ug", "score": 9.7145786285, "published": false}, {"hash": "88WgTboy5XL", "uri": "https://www.kcaa.or.ke/sites/default/files/regulation/Legal_Notice_No_119_120_121_Civil_Aviation.pdf", "label": "www.kcaa.or.ke", "score": 9.3655033112, "published": false}, {"hash": "e67VKi87N6n", "uri": "https://businesslicences.go.ug/uploads/documents/Civil%20aviation%20air%20navigation%20services%20regulations%202014.pdf", "label": "businesslicences.go.ug", "score": 8.8466806412, "published": false}], "snippet_links": [{"key": "quality-management", "type": "definition", "offset": [14, 32]}, {"key": "quality-requirements", "type": "clause", "offset": [55, 75]}], "size": 14, "snippet": "means part of quality management focused on fulfilling quality requirements;", "hash": "5e3671b804618d018d3cd1dd7fa3d7d7", "id": 9}, {"samples": [{"hash": "RIapZXCxkQ", "uri": "https://docs.legis.wisconsin.gov/code/register/2023/810b/insert/dhs157.pdf", "label": "docs.legis.wisconsin.gov", "score": 18.2396774292, "published": false}, {"hash": "bOtnCv0yJ3T", "uri": "https://docs.legis.wisconsin.gov/code/admin_code/dhs/110/157.pdf", "label": "docs.legis.wisconsin.gov", "score": 18.2352581024, "published": false}, {"hash": "90ItiMoLpou", "uri": "https://docs.legis.wisconsin.gov/code/register/2010/652b/insert/dhs157.pdf", "label": "docs.legis.wisconsin.gov", "score": 15.2600374222, "published": false}], "snippet_links": [{"key": "to-ensure", "type": "clause", "offset": [25, 34]}, {"key": "the-equipment", "type": "definition", "offset": [69, 82]}, {"key": "image-quality", "type": "clause", "offset": [172, 185]}, {"key": "significant-increase", "type": "definition", "offset": [191, 211]}], "size": 13, "snippet": "means an ongoing program to ensure continued reliable performance of the equipment designed to detect changes which may result in a clinically significant degra- dation in image quality or a significant increase in radiation expo- sure.", "hash": "958fcf0653bc4e739065655bd40bf8cb", "id": 10}], "next_curs": "ClwSVmoVc35sYXdpbnNpZGVyY29udHJhY3RzcjgLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIYcXVhbGl0eS1jb250cm9sIzAwMDAwMDBhDKIBAmVuGAAgAA==", "definition": {"title": "Quality control", "size": 707, "snippet": "means the total of all activities performed by the Design-Builder, Designer, Construction Inspection Professional Engineering Firm and the Materials Testing Firm or Laboratory, subcontractors, producers or manufacturers to ensure that the Work performed by the Design-Builder conforms to the Contract requirements. For design, Quality Control activities shall include, but not be limited to, procedures for design quality, checking, design review including reviews for constructability, and review and approval of Working Plans. For construction, Quality Control activities shall include, but not be limited to, procedures for materials handling and construction quality, inspection, sampling and testing of materials both on site and at the plant(s), field testing of materials, obtaining and verifying Materials Certifications, record keeping, and equipment monitoring and calibration, production process control, and monitoring of environmental compliance. Quality Control also includes documentation of all QC design and construction efforts. The Scope of Work to be performed as part of the Quality Control task may be changed after the RFQ Phase.", "id": "quality-control", "examples": ["Each Contractor and Subcontractor ITP shall include the following information: \u2022 Inspection activities; \u2022 <strong>Quality Control</strong> requirements; \u2022 Responsibility for inspections or tests; \u2022 Applicable procedures and numbering; \u2022 Acceptance criteria; \u2022 Verifying documents; \u2022 Inspection parties and responsibilities; and \u2022 Inspection points (hold, witness, and review)."], "related": [["quality-system", "Quality System", "Quality System"], ["quality-management-system", "Quality Management System", "Quality Management System"], ["radiopharmaceutical-quality-assurance", "Radiopharmaceutical quality assurance", "Radiopharmaceutical quality assurance"], ["quality-management-plan", "Quality Management Plan", "Quality Management Plan"], ["air-traffic-control-service", "air traffic control service", "air traffic control service"]], "related_snippets": [], "updated": "2025-08-03T04:21:13+00:00"}, "json": true, "cursor": ""}}