PUWER definition
Examples of PUWER in a sentence
Standards or Legislation requirement (declare relevant legislation minimum compliance requirements, i.e BS EN, meet NOMS Spec, Etc) British Standards, Fire Regulations, NOMS Standards, Electrical Regulations, LOLER, PUWER All work must comply with all Health & Safety Legislation.
Where LOLER or PUWER applies, the equivalent merchant shipping legislation is disapplied.
Standards or Legislation requirement (declare relevant legislation minimum compliance requirements, i.e. BS EN, meet NOMS Spec, Etc) British Standards, Fire Regulations, NOMS Standards, Electrical Regulations, LOLER, PUWER All work must comply with all Health & Safety Legislation.
HSE’s legislation (including the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) and Provision and Use of Work Equipment Regulations 1998 (PUWER)) will be disapplied for ship’s work equipment and lifting equipment, except where the ship’s work equipment is used in a specified operation.
The Harbour Operator shall ensure that all equipment, including any plant and machinery, vehicle, aircraft and clothing, is selected carefully and inspected through its life in accordance with PUWER.
Those duties and responsibilities are laid down in PUWER 98, LOLER 98 and highlighted in BS 6037; ignoring these documents leaves the duty holder in peril of prosecution under health and safety legislation.
All accidents causing injury and dangerous occurrences will be notified in accordance with RIDDOR, COSHH, LOLER and PUWER regulations to be followed at all times.
The UK Government Connect Secure Extranet (GCSX) compliance Provision and Use of Work Equipment Regulations (PUWER 1998) or equivalent The Supply of Machinery (Safety) Regulations 2008 and the Supply of Machinery (Safety) (Amendment) Regulations 2011 implement Directives 2006/42/EC and 2009/127/EC on Machinery ‘CE marking’ is mandatory for certain product groups within the European Economic Area.
Plus: to monitor use of the fixed lighting system and commission a re-evaluation of the safe working load if changes are made / planned Stage Lighting Weight Assessment (Rise and Fall) Statutory PUWER LOLER Local Schedule(s) Initial inspection to establish safe working load, label and provide certification.
Y √ E07 - Kitchen Equipment, dishwashers, microwaves, fan cleaning The E07 contract will inspect electrical equipment within commercial kitchens for electrical safety to comply with PUWER.