Examples of Public Sewer Main in a sentence
PRESSURE TEST shall mean a District approved air or hydrostatic pressure test on the Sewer Lateral from as close as practical to the building foundation (as determined by the General Manager, District Engineer or their delegate) to the sewer lateral’s connection to the Public Sewer Main in order to demonstrate that the Lateral pipe and the connection to the Public Sewer Main are water tight.
COMMON LATERAL shall mean any Sewer Lateral that connects directly to another Sewer Lateral, in lieu of connecting to the Public Sewer Main.
The property Owner remains responsible for the full cost of testing, and repair or replacement of the Sewer Lateral from the Public Sewer Main to the initial Building in question.Where multiple residential connections connect to one Sewer Lateral, it is the property Owner/Owners’ responsibility to determine how costs related to Lateral, inspections and repairs will be shared.
Directing Staff to Place a Demand Upon the Current Owners of 559 Main Street, APN 002-151-009 Requiring Code Enforcement Action Relevant to City Code §8-3-28 and §7-5-25 to Address an Existing Failed Retaining Wall Adjacent to an Active Public Sewer Main Located in Hangtown Creek (CIP #42237); and2.
Show Surface Entry Repair locations on the Plans.) (Designer Note: for Abandoning Private Sewer Pipe at Public Sewer Main; typically used in projects with nonconforming sewers, specifically private lines in the ROW.
For new sewer lateral taps into a Public Sewer Main, the minimum nominal pipe diameter shall not be less than 6-inches.
A-3 Public Sewer Main Extension along East Property Line – 7B Approximately 871 linear feet of 12” and 15” Sewer Main from south end of pod 7E (block 106) to south end of pod 7F (block 110) to serve residential development in Entrada del Pueblo (Region 7A & 7B).
Whenever, in the opinion of the District, there exists the possibility of sewage from the District’s Public Sewer Main flooding through the connection into the connected structure as a result of hydraulic characteristics in the District’s Sanitary Sewer System, a backwater overflow prevention device, approved by the District, shall be installed in the Discharger’s lateral at the Discharger’s expense.
A-12 Public Sewer Main Extension along East Property line – 9A Approximately 1,800 linear feet of 12” Sewer Main from north side of El Toro Road to the south end of pod 9J (block 190).
Under no circumstance will a maintenance agreement or any easement associated with the maintenance agreement change a Private Sewer Main into a Public Sewer Main.