PSSE definition
Examples of PSSE in a sentence
Positive Student ratings, prompt messaging, repeat Bookings and a greater amount of Lessons taught will contribute to Tutors being ranked higher on the Website's search engine results.
Final adjustments and parameters settings related with the control system commissioning process shall be incorporated to the PSSE mathematical model and tested accordingly by the PV facility Contractor and PREPA system study groups.
At a later stage in the process, it is also required that the Contractor submits as-built PSS/E mathematical models of the PV Facility.
The mathematical models shall be fully compatible with the latest and future versions of PSS/E.
In its final form, the mathematical model shall be able to simulate each of the required control and operational modes available for the compensation device and shall be compatible with the latest and future versions of PSSE.
In the case that the Contractor submits user written models, the Contractor shall be required to keep these models current with the future versions of the PSS/E program until such time that PSS/E has implemented a standard model.
The data and PSS/E model shall also be updated and officially certified according to PREPA requirements when final field adjustments and parameters measurements and field tests are performed to the facility by the contractor.
Resource Provider shall submit to PREPA a report from Siemens PTI or another third-party engineering consultant that validates and certifies the PSS/E mathematical model as accurate, including the subsequent revisions performed to keep the mathematical model current with the future version of the PSS/E program.
The mathematical model (either PSS/E standard or user written model) of the PV facility shall be officially certified by Siemens - PTI before a specific and validated PSS/E mathematical model of the complete PV facility be submitted to PREPA.
PV facility Owners that provide user written model(s) shall provide compiled code of the model and are responsible to maintain the user written model compatible with current and new releases of PSS/E until such time a standard model is provided.