Provisional Acceptance Test definition

Provisional Acceptance Test means a test as measured by Owner’s monitoring equipment, including Owner’s Continuous Emission Monitoring System, to determine the applicable Unit’s ability to meet the Provisional Acceptance requirements stated in Exhibit E.
Provisional Acceptance Test or "PAT" xxans the test undertaken by ORBIMAGE or its Subcontractor(s) to certify that a separate identified part(s) of the Work meets the requirements of this Contract.
Provisional Acceptance Test means the inspection and test for new Cloud Platform whether it is perfectly configured to provide AOS Cloud Service as described in Annex 8, at the end of Commissioning period.

Examples of Provisional Acceptance Test in a sentence

  • One is Provisional Acceptance Test (PAT) and another is Final Acceptance Test (FAT).

  • Provisional Acceptance Test (PAT) team shall conduct one “Successful Bill Run Test (SBT)” as a part of the PAT.

  • The implementation of the subject of the order should be understood as meeting all the conditions contained in the contract and successfully conducting the Provisional Acceptance Test (PAT).

  • Factory Premises Acceptance Test (FPAT), Provisional Acceptance Test (PAT) and Final Acceptance Test (FAT).

  • Provisional Acceptance Test (PAT): Before acceptance of the installed OFC network system, BTCL PAT team shall carry out, on site, detail tests of the finished works and related supplied goods such as DWC duct, Man-Hole, Hand-Hole etc.

  • Such tests shall be termed as “ Provisional Acceptance Test (PAT)”.

  • Im Falle einer Gasübergabe findet vorstehende Regelung entsprechen- de Anwendung.

  • Individuals who are not State employees may follow the notification and redress procedures stated in System of Record Notices STATE-31, STATE-24, STATE-05, and STATE-36.

  • A report on the successful completion of the Provisional Acceptance Test (PAT) will be signed by both parties.

  • Below provided speeds concern minimum required by this specification which will be a subject for Provisional Acceptance Test.

Related to Provisional Acceptance Test

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Final Acceptance Date means the date on which Final Acceptance occurs.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Final Acceptance means final written acceptance of all the Work by the Commissioner, a copy of which shall be sent to the Contractor.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Conditional Acceptance means a conditional acceptance by the Liquidity Provider of an extension of the Scheduled Termination Date.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Backflow prevention device means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Backflow Prevention Assembly means any mechanical assembly installed at a water service line or at a plumbing fixture to prevent a backflow contamination event, provided that the mechanical assembly is appropriate for the identified contaminant at the cross connection and is an in-line field-testable assembly.

  • Genetic test means an analysis of human DNA, RNA, chromosomes, proteins, or metabolites, that detect genotypes, mutations, or chromosomal changes. The term “genetic test” does not mean an analysis of proteins or metabolites that does not detect genotypes, mutations, or chromosomal changes; or an analysis of proteins or metabolites that is directly related to a manifested disease, disorder, or pathological condition that could reasonably be detected by a health care professional with appropriate training and expertise in the field of medicine involved.

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Project Milestone means the project milestone set forth in Schedule-J;

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.