Project Safety Management Plan definition

Project Safety Management Plan means the plan containing the requirements set forth in Section 2.3.

Examples of Project Safety Management Plan in a sentence

  • CONSTRUCTION WORK 3.1 Project Safety Management Plan 3.1.1 The Principal Contractor must ensure that where construction work carried out under the requirements of the Construction Regulations, a Project Safety Management Plan (PSMP) is prepared.

  • All safety-critical Work, in conformance with the Project Safety Management Plan as further described in the Standard Specifications has been reviewed and sealed by the Professional Engineer of responsible charge before construction begins.

  • Objective criteria and thresholds for unbiased, accurate forecasts shall be used to certify Participating Intermittent Resources in accordance with Section 2.2.4 of this EIRP.

  • The Contractor’s Project Safety Management Plan (PSMP), per CDOT Standard Specifications, Section 107.06, shall be submitted for Acceptance prior to NTP2 or any work element requiring implementation of the Project Safety Management Plan.

  • In conformance with the Project Safety Management Plan (PSMP) as further described in the CDOT Standard Specifications, all safety-critical Work, has been reviewed and sealed by the Professional Engineer of responsible charge before construction begins.

  • Review Contractors Project Safety Management Plan and assure company policy compliances.

  • The INCW Part Project Safety Management Plan has been developed describing how OPG through the OR will fulfill its role as “Constructor” in the execution of the contract from a safety perspective.

  • Non-conformance is referenced with respect to Project commitments as included in the ESMP and associated Management Plans, the LESR, the Milestones Schedule, the Project Safety Management Plan, the Project Health Management Plan, the Project Regulatory Compliance Plan, and the Project Security Management Plan (collectively referred to as “Project documents” in the definitions below) and with respect to on-going compliance with Applicable Lender Environmental and Social Standards.

  • Environmental2.1.4.2 Safety MeetingsThe Contractor shall conduct regularly scheduled Project Safety Meetings, tool box talks, etc., as specified in their Project Safety Management Plan and as per the Standard Specifications.2.1.5 Photographs2.1.5.1 Progress PhotographsThe Contractor shall take Project photographs of the Work Site every month as a minimum.

  • The decision shall be documented as well as the alternative model stipulated in the PHAC and PSSP documents and the Project Safety Management Plan (in the PMP).On a Brownfield site (where Projects are adjacent to or within active operating areas), the Safe Work Permitting process is co-managed with the local Company Operation based on arrangements reached between the Company Operations and Projects representatives.

Related to Project Safety Management Plan

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Safety Management System means a systematic approach to managing safety, including the necessary organizational structures, accountabilities, policies and procedures;

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Security Management Plan means the Supplier's security management plan prepared pursuant to paragraph 3 of schedule 2 an outline of which is set out in paragraph 2.7 of the Order Form as updated from time to time;

  • Pest Management Plan and “PMP” means the Recipient’s plan dated December 13, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Health and Safety Plan means a documented plan which addresses hazards identified and includes safe work procedures to mitigate, reduce or control the hazards identified;

  • Forest management plan means a written plan prepared and signed by a qualified forester that prescribes measures to optimize production, utilization, regeneration, and harvest of timber. The forest management plan shall include a schedule and timetables for the various silvicultural practices used on forestlands, which shall be a maximum of 20 years in length. A forest management plan shall include all of the following:

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Quality Assurance Plan or “QAP” shall have the meaning set forth in Clause 11.2;

  • Asset Management Plan means a plan created by the department and approved by the state transportation commission or a plan created by a local road agency and approved by the local road agency's governing body that includes provisions for asset inventory, performance goals, risk of failure analysis, anticipated revenues and expenses, performance outcomes, and coordination with other infrastructure owners.

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Safety Plan means a written document that has procedures, requirements, or standards related to safety which the pool staff shall follow. The safety plan shall include training and emergency response procedures.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Waste Framework Directive or “WFD” means Waste Framework Directive 2008/98/EC of the European Parliament and of the Council on waste

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);

  • Quality Assurance Program means the overall quality program and associated activities including the Department’s Quality Assurance, Design-Builder Quality Control, the Contract’s quality requirements for design and construction to assure compliance with Department Specifications and procedures.

  • risk management plan ’ means a risk management plan submitted to the Ad- ministrator by an owner or operator of a stationary source under subparagraph (B)(iii).

  • Biological safety cabinet means a containment unit suitable for the preparation of low to moderate risk agents where there is a need for protection of the product, personnel, and environment, according to National Sanitation Foundation (NSF) Standard 49.

  • Procurement Management means the Director of Lee County’s Procurement Management Department or designee.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.