Unsatisfactory Performance means any of the following:
Basket Performance means a decimal number calculated by applying the following formula: X ⎛ Underlyingi,FINAL ⎞⎜⎟BP = ∑⎜ Wi × Underlying ⎟i=1 ⎝i,INITIAL ⎠ where: BP = Basket Performance X = 2 Wi = Weighting of the relevant Underlying Underlying i,FINAL Underlying i,INITIAL= Reference Price of the relevant Underlying with respect to the Valuation Date = Initial Price of the relevant Underlying
Underlying Performance means in relation to the Valuation Date a decimal number calculated by applying the following formula: UP =Underlying FINAL Underlying INITIAL where: UP = Underlying Performance with respect to the Valuation Date UnderlyingFINAL UnderlyingINITIAL= Reference Price of the Underlying with respect to the Valuation Date = Initial Price of the Underlying
Total Performance means the date of the City’s acceptance of the Work in writing as fully performed according to the Contract Documents; and
Index Performance means, in relation to an Index and an Auto-Call Valuation Date or the Valuation Date, as the case may be, a percentage calculated by the Calculation Agent in respect of such date in accordance with the following formula: Index Performance =Final Index Level × 100% Initial Index Level
Substantial Performance means the stage of completion when:(a) all Work, as certified by the Contract Administrator, is capable of completion or correction at a cost of not more than:
human performance means human capabilities and limitations which have an impact on the safety and efficiency of aeronautical operations;
Environmental Performance means all or any of the following: the consumption of energy and associated generation of greenhouse gas emissions; the consumption of water; waste generation and management; and any other environmental impact arising from the use or operation of the Premises or the Estate;
Sexually explicit performance means a live or public act or show intended to arouse or satisfy the sexual desires or appeal to the prurient interest of patrons.
Control Performance Standard or “CPS” shall mean the reliability standard that sets the limits of a Balancing Authority’s Area Control Error over a specified time period.
Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).
Key Performance Indicators or “KPIs” means the performance measurements and targets set out in Part 3 of Schedule 1 (Services) of this Framework Agreement;
Key Performance Indicator means a measure that captures the performance of a critical variable to expand and improve community-based corrections programs to promote offender success, ensure accountability, enhance public safety, and reduce recidivism.
Extreme performance coating means coatings designed for harsh exposure or extreme environmental conditions.
Energy Performance Score means the numeric rating generated by Portfolio Manager that compares the Energy usage of the building to that of similar buildings.
Performance has the meaning ascribed to it in the Copyright Act 98 of 1978, as amended from time to time, and the words “Perform” and “Performed” and “Performing” will have the same meaning
Standard of performance means a standard for emission of air pollutants which reflects the degree of emission limitation achievable through the application of the best system of emission reduction which (taking into account the cost of achieving such reduction) the Director determines has been adequately demonstrated.
Worst Performing Index means the Index for which the performance is the lowest in accordance with the definition of WOfinal
Subprojects means more than one such Subproject.
Project Milestones means the project milestones set forth in Schedule-G;
Project Milestone means the project milestone set forth in Schedule-J;
Annual performance report means a written appraisal of the teaching staff member's performance prepared by the teaching staff member’s designated supervisor based on the evaluation rubric for his or her position.
Development Project means a project for the development of land within a
Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);
Energy savings performance contract means a contract under which the rate of payments is based upon energy and operational cost savings and a stipulated maximum energy consumption level over the life of the contract.
Financial Performance Covenants means the covenants of the Borrower set forth in Section 10.11.