Project Emissions definition

Project Emissions means any GHG emissions associated with the implementation of an offset project that must be accounted for in the Offset Project Data Report.
Project Emissions means any emissions attributable to the implementation of an Emission Reduction Project that must be accounted for in the Emission Reduction Project Report.
Project Emissions means the carbon emissions accounted for against using power or fuel in the production activity within the Project Boundary. ‘Registration’ or ‘Registered’ each means the formal acceptance by the CDM Executive Board of a validated project as a CDM project activity in accordance with the requirements set in out the International Rules.

Examples of Project Emissions in a sentence

  • Page 5 of 7 Pages SIGNATURES After reasonable inquiry and to the best of my knowledge and belief, I certify that the information set forth in this statement is true, complete and correct.

  • Emissions related to these waste streams must however be accounted for as project emissions and must be evaluated – see section on Project Emissions.

  • Step 1: Project Emissions Increase For modified existing emissions units, according to 40 CFR 51.165(a)(2)(ii)(C), the project’s emission increase for each pollutant is equal to the sum of the differences between the projected actual emissions (PAE) and the baseline actual emissions (BAE).

  • Project Emissions and Leakages are attributed to the onsite emissions due to the construction and operation of the project.

  • In contrast, placing the same amount of organic waste in a centralized composting facility involves a rapid aerobic decay that generates far fewer emissions within a single year (Project Emissions).

  • Legal Basis Is SoundWe believe the 2009 NSR Aggregation Action is legally supportable and makes sense for sometimes difficult case-by-18 Project Emissions Accounting Memorandum at 9 (emphasis added).19 Letter from Steven C.

  • The EPA's guidance memorandum titled "Project Emissions Accounting under the New Source Review Preconstruction Permitting Program," dated March 13, 2018, directs that emission decreases associated with a project are to be considered as part of the Step 1 evaluation of the project emission increase.

  • This parameter is used for Project Emissions calculation in the case the water purification device consumed fossil fuel.

  • Through the World Bank Project Emissions Reduction Program in DR (P151752; P161182) that looks after reducing deforestation and forest degradation in the country, national level measurements of the forest reference level and reference level of carbon emissions will be gathered during the years 2020-2025 and reported back to the project.

  • Emission Reduction = Emissions Baseline – Emissions Project Emissions Baseline = sum of the emissions under the baseline condition.


More Definitions of Project Emissions

Project Emissions means an estimate of greenhouse gas emissions from all selected sources and reservoirs;
Project Emissions means the carbon emissions accounted for against using power or fuel in the production activity within the Project Boundary.
Project Emissions means any emissions associated with the implementation of an emission reduction project that must be accounted for in the Emission Reductions Project Report.

Related to Project Emissions

  • PM10 emissions means PM10 emitted to the ambient air as measured by an applicable reference method, or an equivalent or alternate method, specified in 40 CFR Part 51, Appendix M as of December 8, 1984, or by a test method specified in these regulations or any supplement thereto.

  • Greenhouse Gas Emissions means emissions in terms of tonnes of CO2 equivalent of carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), nitrogen trifluoride (NF3) and sulphur hexafluoride (SF6) determined pursuant to Regulation (EU) No 525/2013 and falling within the scope of this Regulation;

  • Project Work means the work required to complete the Project.

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Excess emissions - means an emission rate that exceeds any applicable emission limitation or standard allowed by any rule in Sections .0500, .0900, .1200, or .1400 of Subchapter 02D; or by a permit condition; or that exceeds an emission limit established in a permit issued under 15A NCAC 02Q .0700. (Note: Definitions of excess emissions under 02D .1110 and 02D .1111 shall apply where defined by rule.)

  • Secondary emissions means emissions which occur as a result of the construction or operation of a major stationary source or major modification, but do not come from the major stationary source or major modification itself. For the purposes of this chapter, “secondary emissions” must be specific, well-defined, and quantifiable, and must impact the same general areas as the stationary source modification which causes the secondary emissions. “Secondary emissions” includes emissions from any offsite support facility which would not be constructed or increase its emissions except as a result of the construction or operation of the major stationary source or major modification. “Secondary emissions” does not include any emissions which come directly from a mobile source, such as emissions from the tailpipe of a motor vehicle, from a train, or from a vessel.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project Improvements means site improvements and facilities that are:

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Production Environment means a logical group of virtual or physical computers comprised within the Cloud Environment to which the Customer will be provided with access and use the purchased Cloud Application(s) in production and for its generally marketed purpose.

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Particulate matter emissions (PM) means the mass of any particulate material from the vehicle exhaust quantified according to the dilution, sampling and measurement methods as specified in this UN GTR.

  • Evaporative emissions means the hydrocarbon vapours lost from the fuel system of a motor vehicle other than those from exhaust emissions;

  • Fugitive dust emissions means particulate matter from process operations that does not pass through a process stack or vent and that is generated within plant property boundaries from activities such as: unloading and loading areas, process areas, stockpiles, stock pile working, plant parking lots, and plant roads (including access roads and haul roads).

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Project Plans mean the plans for the Project that are attached to this Agreement as Exhibit “B.”

  • Contract Work means everything required to be furnished and done by the Contractor by any one or more of the parts of the Contract referred to in Article 1, except Extra Work as hereinafter defined.

  • Project Engineer means the surveyor or engineer employed by or private

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Predictive emissions monitoring system or "PEMS" means all of the equipment necessary to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and calculate and record the mass emissions rate (for example, pounds per hour) on a continuous basis.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1(b) of Schedule 2 to this Agreement.