{"component": "definition", "props": {"groups": [{"size": 301, "snippet": "means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;", "samples": [{"hash": "ccCnNHqOiUc", "uri": "/contracts/ccCnNHqOiUc#project-completion-schedule", "label": "Contract Agreement", "score": 35.9918899536, "published": true}, {"hash": "bI4BFa2m509", "uri": "/contracts/bI4BFa2m509#project-completion-schedule", "label": "Engineering Procurement and Construction (Epc) Agreement", "score": 35.5506515503, "published": true}, {"hash": "6QxUp5D3VAl", "uri": "/contracts/6QxUp5D3VAl#project-completion-schedule", "label": "Construction Contract", "score": 35.3506622314, "published": true}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "project-highway", "type": "definition", "offset": [87, 102]}, {"key": "scheduled-completion-date", "type": "definition", "offset": [120, 145]}], "hash": "e93b8cb0f8d11bb33b35607ebe33fdf8", "id": 1}, {"size": 67, "snippet": "means the progressive Project Milestones for completion of the Work on or before the Scheduled Completion Date;", "samples": [{"hash": "lnkclDnyrvr", "uri": "/contracts/lnkclDnyrvr#project-completion-schedule", "label": "General Conditions of Contract", "score": 25.2997951508, "published": true}, {"hash": "46qKYQo1NaG", "uri": "/contracts/46qKYQo1NaG#project-completion-schedule", "label": "General Conditions of Contract", "score": 25.2368240356, "published": true}, {"hash": "9zzsigx6QbD", "uri": "https://www.smartcitybsp.com/public/assets/images/tmpphp9iahyc.pdf", "label": "Contract", "score": 14.3607120514, "published": false}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "work-on", "type": "definition", "offset": [63, 70]}, {"key": "scheduled-completion-date", "type": "definition", "offset": [85, 110]}], "hash": "9f54b4b7e8786874eef3aac87a6acdf8", "id": 2}, {"size": 20, "snippet": "means the progressive Project milestones set forth in Schedule \u2018D\u2019 for the implementation of the Project.", "samples": [{"hash": "hCnOm0uRdL6", "uri": "/contracts/hCnOm0uRdL6#project-completion-schedule", "label": "Concession Agreement", "score": 26.6143417358, "published": true}, {"hash": "dxdyAjaj1hT", "uri": "/contracts/dxdyAjaj1hT#project-completion-schedule", "label": "Concession Agreement", "score": 25.7657566071, "published": true}, {"hash": "k14JNfrVyvS", "uri": "https://uttarakhandtourism.gov.in/sites/default/files/2023-01/RFP_HotelAlaknanda_Haridwar_13.01.23.pdf", "label": "uttarakhandtourism.gov.in", "score": 11.516084671, "published": false}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "implementation-of-the-project", "type": "clause", "offset": [75, 104]}], "hash": "0c47c138df57f59cdfb759c0928c4082", "id": 3}, {"size": 17, "snippet": "means the progressive Project Milestones set forth in Schedule-G for completion of Development Activities on or before the respective Scheduled Completion Date;", "samples": [{"hash": "4ueQ4so00k0", "uri": "http://uptourism.gov.in/pdf/vol2_dda_Rahi_Yatri_Niwas_Bithoor.pdf", "label": "Lease", "score": 14.1704311371, "published": false}, {"hash": "dgZbPjXflJz", "uri": "http://uptourism.gov.in/pdf/vol2_dda_Rahi_Gokul_Restaurant.pdf", "label": "Lease", "score": 14.1704311371, "published": false}, {"hash": "T2DoBoN5fb", "uri": "http://uptourism.gov.in/pdf/vol2_dda_RTB_Vrindavan.pdf", "label": "Development Agreement", "score": 14.1704311371, "published": false}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "development-activities", "type": "clause", "offset": [83, 105]}, {"key": "scheduled-completion-date", "type": "definition", "offset": [134, 159]}], "hash": "18584a08eea7be62e74c4f967a0cb897", "id": 4}, {"size": 9, "snippet": "means the progressive project milestones set forth in Schedule O (Project Completion Schedule);", "samples": [{"hash": "hmVzlKxRtIs", "uri": "/contracts/hmVzlKxRtIs#project-completion-schedule", "label": "Concession Agreement", "score": 35.1018867493, "published": true}, {"hash": "hTk6XIry2Af", "uri": "/contracts/hTk6XIry2Af#project-completion-schedule", "label": "Concession Agreement", "score": 35.0967521667, "published": true}, {"hash": "ayztIyVITHH", "uri": "/contracts/ayztIyVITHH#project-completion-schedule", "label": "Concession Agreement", "score": 35.0929031372, "published": true}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "schedule-o", "type": "clause", "offset": [54, 64]}], "hash": "9ba18a738f9fd9e23b18f2128d79ec7c", "id": 5}, {"size": 7, "snippet": "refers to the project completion schedule submitted by Seller to CEB and as set forth in Schedule F;", "samples": [{"hash": "f6QJjZpv5kw", "uri": "/contracts/f6QJjZpv5kw#project-completion-schedule", "label": "Power Purchase Agreement", "score": 35.4368782043, "published": true}, {"hash": "2iMjP6FhDvo", "uri": "/contracts/2iMjP6FhDvo#project-completion-schedule", "label": "Power Purchase Agreement", "score": 35.4368782043, "published": true}, {"hash": "ja29ltBiKi1", "uri": "/contracts/ja29ltBiKi1#project-completion-schedule", "label": "Power Purchase Agreement", "score": 33.2935180664, "published": true}], "snippet_links": [{"key": "the-project", "type": "clause", "offset": [10, 21]}, {"key": "by-seller", "type": "clause", "offset": [52, 61]}, {"key": "schedule-f", "type": "definition", "offset": [89, 99]}], "hash": "325bca0c0de6994c395d6946ce953b37", "id": 6}, {"size": 7, "snippet": "means the progressive Project Milestones set forth in Schedule-G for completion of the Storage Facility on or before the Scheduled Completion Date;", "samples": [{"hash": "5BOodSaBq8K", "uri": "http://fci.gov.in/app2/webroot/upload/tenders/Whitefield_DCA.pdf", "label": "Draft Concession Agreement", "score": 12.1704311371, "published": false}, {"hash": "2Y1vwM3u0PL", "uri": "http://fci.gov.in/app2/webroot/upload/tenders/DCASahnewal.pdf", "label": "Draft Concession Agreement", "score": 12.1704311371, "published": false}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "completion-of-the", "type": "clause", "offset": [69, 86]}, {"key": "storage-facility", "type": "definition", "offset": [87, 103]}, {"key": "scheduled-completion-date", "type": "definition", "offset": [121, 146]}], "hash": "3a81718e72ea31f9b3eb9ced5a2636c9", "id": 7}, {"size": 6, "snippet": "means the progressive Project Milestones set forth in ScheduleG for completion of the Mandatory Project & Project Facilities on or before the Scheduled Completion Date;", "samples": [{"hash": "a63XxxfOHev", "uri": "http://jharkhandtourism.gov.in/Application/uploadDocuments/Tender/Other_20180424_172721.pdf", "label": "Project Development and Management Agreement", "score": 13.1546888351, "published": false}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "completion-of-the", "type": "clause", "offset": [68, 85]}, {"key": "mandatory-project", "type": "definition", "offset": [86, 103]}, {"key": "project-facilities", "type": "definition", "offset": [106, 124]}, {"key": "scheduled-completion-date", "type": "definition", "offset": [142, 167]}], "hash": "ef5f6924e0c4948d36f5722a626c8d28", "id": 8}, {"size": 4, "snippet": "means the progressive Project Milestones set forth in Schedule 5 for completion of the Project on or before the Scheduled Completion Date Project Facilities means all the amenities and facilities, (a) the Site (b) Processing Facilities and (c) Scientific Landfill (d) Waste to Energy Plant", "samples": [{"hash": "13z4TK5XInc", "uri": "/contracts/13z4TK5XInc#project-completion-schedule", "label": "Concession Agreement", "score": 26.5797710419, "published": true}, {"hash": "8pgtzhoXMqu", "uri": "/contracts/8pgtzhoXMqu#project-completion-schedule", "label": "Concession Agreement", "score": 24.5481147766, "published": true}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "schedule-5", "type": "definition", "offset": [54, 64]}, {"key": "completion-of-the-project", "type": "clause", "offset": [69, 94]}, {"key": "scheduled-completion-date", "type": "definition", "offset": [112, 137]}, {"key": "project-facilities", "type": "definition", "offset": [138, 156]}, {"key": "amenities-and-facilities", "type": "definition", "offset": [171, 195]}, {"key": "the-site", "type": "clause", "offset": [201, 209]}, {"key": "processing-facilities", "type": "clause", "offset": [214, 235]}, {"key": "energy-plant", "type": "definition", "offset": [277, 289]}], "hash": "579303a8b7531e9ec81219b03c9ad417", "id": 9}, {"size": 4, "snippet": "means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled CompletionDate; \u201cProject Facilities\u201d means all the amenities and facilities situated on the Site, as described in Schedule-C; \u201cProject Highway\u201d means the Site comprising \u201cConstruction of Service Road and RCC Drain on both sides of NH 37A from Kaliabor \u2013Tiniali- (Km 0.000) to Kolong Bridge (Km 0.600) in Nagaon district in the state of Assam under EPC Mode\u201d and all Project Assets, and its subsequent development and augmentation in accordance with thisAgreement; \u201cProject Milestone\u201d means the project milestone set forth in Schedule-J; \u201cProof Consultant\u201d shall have the meaning set forth in Clause 10.2; \u201cQuality Assurance Plan\u201d or \u201cQAP\u201d shall have the meaning set forth in Clause 11.2; \u201cRe.\u201d, \u201cRs.\u201d or \u201cRupees\u201d or \u201cIndian Rupees\u201d or \u201cINR\u201d means the lawful currency of the Republic of India; \u201cRequest for Proposals\u201d or \u201cRFP\u201d shall have the meaning set forth in Recital \u2018C\u2019; \u201cRetention Money\u201d shall have the meaning set forth in Clause 7.5; \u201cRight of Way\u201d means and refers to the total land required and acquired for the project, both in its width and length, together with all way leaves, easements, unrestricted access and other rights of way, howsoever described, necessary for construction and maintenance of the Project Highway in accordance with this Agreement; Contract AgreementPage 23 of 251 Construction of Service Road and RCC Drain on both sides of NH 37A from Kaliabor \u2013Tiniali- (Km 0.000) to Kolong Bridge (Km 0.600) in Nagaon district in the state of Assam under EPC Mode Nov 2023 \u201cSafety Consultant\u201d shall have the meaning set forth in Clause 10.1; \u201cScheduled Completion Date\u201d shall be the date set forth in Clause 10.3; \u201cScheduled Construction Period\u201d means the period commencing from the Appointed Date and ending on Scheduled Completion Date; \u201cScope of the Project\u201d shall have the meaning set forth in Clause 2.1; \u201cSection\u201d means a part of the Project Highway; \u201cSite\u201d shall have the meaning set forth in Clause 8.1; \u201cSpecifications and Standards\u201d means the specifications and standards relating to the quality, quantity, capacity and other requirements for the Project Highway, as set forth in Schedule-D, and any modifications thereof, or additions thereto, as included in the design and engineering for the Project Highway submitted by the Contractor to, and expressly approved by, theAuthority; \"Stage Payment Statement\" shall have the meaning set forth in Clause 19.4; \u201cStructures\u201d means an elevated road or a flyover, as the case maybe; \u201cSub-contractor\u201d means any person or persons to whom a part of the Works or the Maintenance has been subcontracted by the Contractor and the permitted legal successors in title to such person, but not an assignee to suchperson; \u201cSuspension\u201d shall have the meaning set forth in Article 22; \u201cSpecialised Work\u201d means the work which requires expertise or particular skill/technique or an advanced level of knowledge in the specific field for undertaking the work as required in the Project. \u201cTaking Over Certificate\u201d shall have the meaning set forth in Clause 14.10; \u201cTaxes\u201d means any Indian taxes including GST, excise duties, customs duties, value added tax, sales tax, local taxes, cess and any impost or surcharge of like nature (whether Central, State or local) on the goods, Materials, equipment and services incorporatedinandformingpartoftheProjectHighwaycharged,levied or imposed by any Government Instrumentality, but excluding any interest, penalties and other sums in relation thereto imposed on any account whatsoever. For the avoidance of doubt, Taxes shall not include taxes on corporateincome; \u201cTermination\u201d means the expiry or termination of this Agreement; \u201cTermination Notice\u201d means the communication issued in accordance with this Contract AgreementPage 24 of 251 Construction of Service Road and RCC Drain on both sides of NH 37A from Kaliabor \u2013Tiniali- (Km 0.000) to Kolong Bridge (Km 0.600) in Nagaon district in the state of Assam under EPC Mode Nov 2023", "samples": [{"hash": "hgmjScRHpAL", "uri": "/contracts/hgmjScRHpAL#project-completion-schedule", "label": "Construction Contract", "score": 27.96235466, "published": true}], "snippet_links": [{"key": "project-milestones", "type": "definition", "offset": [22, 40]}, {"key": "project-highway", "type": "definition", "offset": [87, 102]}, {"key": "project-facilities", "type": "definition", "offset": [147, 165]}, {"key": "amenities-and-facilities", "type": "definition", "offset": [181, 205]}, {"key": "the-site", "type": "clause", "offset": [218, 226]}, {"key": "service-road", "type": "definition", "offset": [317, 329]}, {"key": "both-sides", "type": "definition", "offset": [347, 357]}, {"key": "state-of", "type": "definition", "offset": [457, 465]}, {"key": "project-assets", "type": "definition", "offset": [496, 510]}, {"key": "subsequent-development", "type": "definition", "offset": [520, 542]}, {"key": "in-accordance-with", "type": "clause", "offset": [560, 578]}, {"key": "proof-consultant", "type": "definition", "offset": [668, 684]}, {"key": "in-clause", "type": "clause", "offset": [719, 728]}, {"key": "quality-assurance-plan", "type": "definition", "offset": [736, 758]}, {"key": "indian-rupees", "type": "definition", "offset": [847, 860]}, {"key": "currency-of", "type": "definition", "offset": [888, 899]}, {"key": "request-for-proposals", "type": "definition", "offset": [924, 945]}, {"key": "retention-money", "type": "clause", "offset": [1006, 1021]}, {"key": "right-of-way", "type": "clause", "offset": [1072, 1084]}, {"key": "total-land", "type": "definition", "offset": [1110, 1120]}, {"key": "unrestricted-access", "type": "definition", "offset": [1231, 1250]}, {"key": "rights-of", "type": "clause", "offset": [1261, 1270]}, {"key": "maintenance-of-the-project", "type": "clause", "offset": [1328, 1354]}, {"key": "safety-consultant", "type": "definition", "offset": [1627, 1644]}, {"key": "scheduled-completion-date", "type": "definition", "offset": [1696, 1721]}, {"key": "scheduled-construction-period", "type": "definition", "offset": [1768, 1797]}, {"key": "the-period", "type": "clause", "offset": [1805, 1815]}, {"key": "commencing-from", "type": "clause", "offset": [1816, 1831]}, {"key": "the-appointed-date", "type": "definition", "offset": [1832, 1850]}, {"key": "scope-of-the-project", "type": "definition", "offset": [1893, 1913]}, {"key": "specifications-and-standards", "type": "definition", "offset": [2066, 2094]}, {"key": "the-specifications", "type": "definition", "offset": [2102, 2120]}, {"key": "relating-to", "type": "definition", "offset": [2135, 2146]}, {"key": "requirements-for-the-project", "type": "clause", "offset": [2189, 2217]}, {"key": "design-and-engineering", "type": "clause", "offset": [2327, 2349]}, {"key": "contractor-to", "type": "clause", "offset": [2391, 2404]}, {"key": "approved-by", "type": "clause", "offset": [2420, 2431]}, {"key": "stage-payment-statement", "type": "definition", "offset": [2448, 2471]}, {"key": "the-case", "type": "definition", "offset": [2575, 2583]}, {"key": "persons-to-whom", "type": "clause", "offset": [2628, 2643]}, {"key": "the-works", "type": "clause", "offset": [2654, 2663]}, {"key": "the-maintenance", "type": "clause", "offset": [2667, 2682]}, {"key": "the-contractor-and-the", "type": "clause", "offset": [2709, 2731]}, {"key": "title-to", "type": "clause", "offset": [2762, 2770]}, {"key": "article-22", "type": "definition", "offset": [2868, 2878]}, {"key": "specialised-work", "type": "definition", "offset": [2881, 2897]}, {"key": "advanced-level", "type": "clause", "offset": [2975, 2989]}, {"key": "specific-field", "type": "definition", "offset": [3010, 3024]}, {"key": "as-required", "type": "clause", "offset": [3050, 3061]}, {"key": "taking-over-certificate", "type": "clause", "offset": [3079, 3102]}, {"key": "excise-duties", "type": "clause", "offset": [3200, 3213]}, {"key": "customs-duties", "type": "definition", "offset": [3215, 3229]}, {"key": "value-added-tax", "type": "clause", "offset": [3231, 3246]}, {"key": "sales-tax", "type": "definition", "offset": [3248, 3257]}, {"key": "local-taxes", "type": "definition", "offset": [3259, 3270]}, {"key": "the-goods", "type": "clause", "offset": [3357, 3366]}, {"key": "equipment-and-services", "type": "definition", "offset": [3379, 3401]}, {"key": "government-instrumentality", "type": "definition", "offset": [3482, 3508]}, {"key": "but-excluding", "type": "clause", "offset": [3510, 3523]}, {"key": "other-sums", "type": "clause", "offset": [3552, 3562]}, {"key": "for-the-avoidance-of-doubt", "type": "clause", "offset": [3618, 3644]}, {"key": "expiry-or-termination-of-this-agreement", "type": "clause", "offset": [3720, 3759]}, {"key": "termination-notice", "type": "definition", "offset": [3762, 3780]}, {"key": "issued-in", "type": "definition", "offset": [3806, 3815]}, {"key": "this-contract", "type": "clause", "offset": [3832, 3845]}], "hash": "7fe69c85c0d2a006824d9a6fb0d60507", "id": 10}], "next_curs": "CmgSYmoVc35sYXdpbnNpZGVyY29udHJhY3RzckQLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIkcHJvamVjdC1jb21wbGV0aW9uLXNjaGVkdWxlIzAwMDAwMDBhDKIBAmVuGAAgAA==", "definition": {"size": 481, "snippet": "means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;", "title": "Project Completion Schedule", "id": "project-completion-schedule", "examples": ["The Concessionaire shall prepare and submit, with reasonable promptness and in such sequence as is consistent with the <strong>Project Completion Schedule</strong>, 2 (two) copies each of all Drawings to the Authority and Independent Engineer.", "During the Construction Period, the Independent Engineer shall inspect the Project at least once a month and make a report of such inspection (the \u201cInspection Report\u201d) stating in reasonable detail the defects or deficiencies, if any, with particular reference to the Drawings, <strong>Project Completion Schedule</strong>, Scope of the Project, and Specifications and Standards.", "The construction works shall commence from the Appointed Date and shall be completed in accordance with the <strong>Project Completion Schedule</strong> as set forth in Schedule F."], "related": [["completion-schedule", "Completion Schedule", "Completion Schedule"], ["construction-schedule", "Construction Schedule", "Construction Schedule"], ["project-completion", "Project Completion", "Project Completion"], ["project-completion-date", "Project Completion Date", "Project Completion Date"], ["project-schedule", "Project Schedule", "Project Schedule"]], "related_snippets": [], "updated": "2025-07-17T04:25:46+00:00"}, "json": true, "cursor": ""}}