Pre-conditioned two speed idle test definition

Pre-conditioned two speed idle test means the exhaust emissions test described in 40 CFR section 85.2220.

Related to Pre-conditioned two speed idle test

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Incremental Available Transfer Capability Revenue Rights means the rights to revenues that are derived from incremental Available Transfer Capability created by the addition of Merchant Transmission Facilities or of one of more Customer-Funded Upgrades.

  • Testing Date means 31 December of each year.

  • Initial compliance period means the first full three-year compliance period which begins at least 18 months after promulgation, except for the following contaminants: Dichloromethane; 1,2,4-Trichlorobenzene; 1,1,2- Trichloroethane; Benzo[a]pyrene; Dalapon; Di(2-ethylhexyl adipate; Di(2-ethylhexyl) phthalate; Dinoseb; Diquat; Endothall; Endrin; Glyphosate; Hexachlorobenzene; Hexachlorocyclopentadiene; Oxamyl (Vydate); Picloram; Simazine; 2,3,7,8-TCDD (Dioxin); Antimony; Beryllium; Cyanide; Nickel; and Thallium, initial compliance period means the first full three-year compliance period after promulgation for systems with 150 or more service connections (January 1993 -December 1995) and first full three-year compliance period after the effective date of regulation (January 1996 - December 1998) for systems having fewer than 150 service connections.

  • Cannabis testing facility means an entity registered by

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Certificate of Continuing Program Compliance means the Certificate to be filed by the Owner with the Administrator, on behalf of the Issuer, and the Trustee pursuant to Section 4(f) hereof, which shall be substantially in the form attached as Exhibit C hereto or in such other comparable form as may be provided by the Issuer to the Owner, or as otherwise approved by the Issuer.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Distribution Compliance Period with respect to any Note, means the period of 40 consecutive days beginning on and including the later of (a) the day on which such Note is first offered to persons other than distributors (as defined in Regulation S) in reliance on Regulation S, notice of which day shall be promptly given by the Company to the Trustee, and (b) the date of issuance with respect to such Note or any predecessor of such Note.

  • Incremental Rights-Eligible Required Transmission Enhancements means Regional Facilities and Necessary Lower Voltage Facilities or Lower Voltage Facilities (as defined in Tariff, Schedule 12) and meet one of the following criteria: (1) cost responsibility is assigned to non-contiguous Zones that are not directly electrically connected; or (2) cost responsibility is assigned to Merchant Transmission Providers that are Responsible Customers.

  • Performance Condition means any performance condition imposed under rule 3;

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • LCA Test Date has the meaning specified in Section 1.03(e).

  • Target Completion Date has the meaning given such term in Section 3.3(b).

  • Condition Satisfaction Date shall have the meaning set forth in Section 7.2.

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • Repeat compliance period means any subsequent compliance period after the initial compliance period.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Final Completion Date means the date on which Final Completion occurs.

  • Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Class D Par Value Test means the test which will be satisfied as of any Measurement Date if, on such Measurement Date, the Class D Par Value Ratio is at least equal to the percentage specified in the definition of "Coverage Test".

  • Class C Par Value Test means the test which will be satisfied as of any Measurement Date if, on such Measurement Date, the Class C Par Value Ratio is at least equal to the percentage specified in the definition of "Coverage Test".

  • Additional Day-ahead Scheduling Reserves Requirement means the portion of the Day- ahead Scheduling Reserves Requirement that is required in addition to the Base Day-ahead Scheduling Reserves Requirement to ensure adequate resources are procured to meet real-time load and operational needs, as specified in the PJM Manuals.