{"component": "definition", "props": {"groups": [{"size": 49, "snippet": "means the average rate of electric energy delivery during one Metering Interval, converted to an hourly rate of electric energy delivery, in kWh per hour, that is equal to the product of Metered Energy for one Metering Interval, in kWh per Metering Interval, times the number of Metering Intervals in a one-hour period.", "snippet_links": [{"key": "rate-of", "type": "clause", "offset": [18, 25]}, {"key": "energy-delivery", "type": "clause", "offset": [35, 50]}, {"key": "metering-interval", "type": "definition", "offset": [62, 79]}, {"key": "hourly-rate", "type": "clause", "offset": [97, 108]}, {"key": "equal-to", "type": "definition", "offset": [163, 171]}, {"key": "the-product", "type": "clause", "offset": [172, 183]}, {"key": "metered-energy", "type": "definition", "offset": [187, 201]}, {"key": "number-of", "type": "definition", "offset": [269, 278]}], "samples": [{"hash": "gvI3vUEhM3", "uri": "/contracts/gvI3vUEhM3#power-output", "label": "Power Purchase and Sale Agreement", "score": 33.0717926025, "published": true}, {"hash": "iehd4cgiteN", "uri": "/contracts/iehd4cgiteN#power-output", "label": "Power Purchase and Sale Agreement", "score": 32.3053283691, "published": true}, {"hash": "iQPRlNujVmW", "uri": "/contracts/iQPRlNujVmW#power-output", "label": "Power Purchase and Sale Agreement", "score": 32.3053283691, "published": true}], "hash": "d7b07c231d9d43e90637ecccd1466380", "id": 1}, {"size": 16, "snippet": "means the theoretical maximum power, expressed in kW, that can be provided by a recharging point, station, or pool or a shore-side electricity supply installation to a vehicle or vessel connected to that recharging point, station, pool or installation;", "snippet_links": [{"key": "maximum-power", "type": "definition", "offset": [22, 35]}, {"key": "electricity-supply", "type": "definition", "offset": [131, 149]}], "samples": [{"hash": "ky1nTAc9kTc", "uri": "https://secure.ipex.eu/IPEXL-WEB/download/file/082d29087c0cba3e017c0dd6516e3cd1", "label": "secure.ipex.eu", "score": 14.1994543076, "published": false}, {"hash": "fmziSBVdrKY", "uri": "https://www.parlament.gv.at/dokument/XXVII/EU/69234/imfname_11083138.pdf", "label": "www.parlament.gv.at", "score": 10.7686519623, "published": false}, {"hash": "e0d416rbz7T", "uri": "https://www.parlament.gv.at/PAKT/EU/XXVII/EU/06/92/EU_69255/imfname_11083163.pdf", "label": "www.parlament.gv.at", "score": 10.7686519623, "published": false}], "hash": "75d05d1042be3f60ce8ba23f6701eaab", "id": 2}, {"size": 6, "snippet": "means the electricity and shaft power production of the combustion turbine, expressed in megawatts.", "snippet_links": [{"key": "power-production", "type": "definition", "offset": [32, 48]}, {"key": "combustion-turbine", "type": "definition", "offset": [56, 74]}], "samples": [{"hash": "3tlOXlZC50W", "uri": "https://www.accessenvironment.ene.gov.on.ca/instruments/6926-A44M39-14.pdf", "label": "www.accessenvironment.ene.gov.on.ca", "score": 10.1704311371, "published": false}, {"hash": "jogvkCXVXU8", "uri": "https://www.accessenvironment.ene.gov.on.ca/instruments/0459-7DRQ7Y-14.pdf", "label": "www.accessenvironment.ene.gov.on.ca", "score": 10.1704311371, "published": false}], "hash": "37d28ee351f01a0c7936f6b52e8461a7", "id": 3}, {"size": 4, "snippet": "means the theoretical maximum power, expressed in kW, that a recharging point, station or pool, or a shore-side electricity supply installation can provide to vehicles or vessels connected to that recharging point, station, pool or installation;", "snippet_links": [{"key": "maximum-power", "type": "definition", "offset": [22, 35]}, {"key": "electricity-supply", "type": "definition", "offset": [112, 130]}], "samples": [{"hash": "7MID8lwAUCc", "uri": "https://s3.tamtam.pro/production/storage/media/PDF/44775/81e8c06a6dce545094a0152652b982640903b997.pdf", "label": "s3.tamtam.pro", "score": 19.6624736786, "published": false}, {"hash": "47ic4ayxYBN", "uri": "https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=OJ:L:2023:234:FULL", "label": "eur-lex.europa.eu", "score": 11.8596849442, "published": false}, {"hash": "2OghWN2dpPC", "uri": "https://data.consilium.europa.eu/doc/document/PE-25-2023-INIT/en/pdf", "label": "data.consilium.europa.eu", "score": 10.7638607025, "published": false}], "hash": "23390a5d829250e64efb279f0271af57", "id": 4}, {"size": 3, "snippet": "means the theoretical maximum power, expressed in kW, that can be provided by a recharging point to a vehicle;", "snippet_links": [{"key": "maximum-power", "type": "definition", "offset": [22, 35]}], "samples": [{"hash": "izuUrD13Bxj", "uri": "https://s3-nextmove.s3.eu-west-3.amazonaws.com/call_fiche_cef_t_2021_afifgen_en_1ddeb284b5.pdf", "label": "s3-nextmove.s3.eu-west-3.amazonaws.com", "score": 17.9097557068, "published": false}, {"hash": "l0xYMtOqCiS", "uri": "https://www.trafikverket.se/contentassets/44c037a44fa44033881b8d22d88a7451/alternative-fuels-infrastructure-facility---general-envelope_cef-t-2021-afifgen_en.pdf", "label": "www.trafikverket.se", "score": 10.8507871628, "published": false}, {"hash": "8vNMpIaTQpo", "uri": "https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/cef/wp-call/2021/call-fiche_cef-t-2021-afifcoen_en.pdf", "label": "ec.europa.eu", "score": 10.8507871628, "published": false}], "hash": "ed807e1046a99c0fe9ff912db92d4f94", "id": 5}, {"size": 2, "snippet": "has the meaning set forth in Exhibit G.", "snippet_links": [], "samples": [{"hash": "bZ0vXOXcvna", "uri": "/contracts/bZ0vXOXcvna#power-output", "label": "Build Own Transfer Agreement", "score": 30.3053283691, "published": true}, {"hash": "8MQWofnGAVh", "uri": "/contracts/8MQWofnGAVh#power-output", "label": "Operation and Maintenance Agreement", "score": 24.261220932, "published": true}], "hash": "8757fbe24c9bfe1d6fbaaee9d4b09840", "id": 6}, {"size": 2, "snippet": "means the theoretical maximum power, expressed in kW, that can be provided by a", "snippet_links": [{"key": "maximum-power", "type": "definition", "offset": [22, 35]}], "samples": [{"hash": "2jP7PWiAsk8", "uri": "https://cef-hellas.gr/wp-content/uploads/2023/10/call-fiche_cef-t-2021-afifcoen_en.pdf", "label": "cef-hellas.gr", "score": 17.541765213, "published": false}, {"hash": "5AsXdecDqip", "uri": "https://cef-hellas.gr/wp-content/uploads/2023/10/call-fiche_cef-t-2021-afifgen_en.pdf", "label": "cef-hellas.gr", "score": 17.3588905334, "published": false}], "hash": "7b9c0d9e14525564a3380c390f835407", "id": 7}, {"size": 2, "snippet": "means the sum in watts of each transmitter power at a site, i.e. twelve (12) channels at twenty (2) watts per channel is two hundred-forty (240) watts.", "snippet_links": [{"key": "a-site", "type": "definition", "offset": [52, 58]}], "samples": [{"hash": "FEl2VZMT16", "uri": "https://www.torringtonct.org/sites/g/files/vyhlif12226/f/uploads/wireless_addendum_rev_11-21.pdf", "label": "Amendment", "score": 20.8357543945, "published": false}, {"hash": "6ILPN7kmYvN", "uri": "https://www.torringtonct.org/sites/g/files/vyhlif5091/f/mai/files/wireless_addendum_draft_7-21_1.pdf", "label": "Amendment", "score": 14.8042440414, "published": false}], "hash": "38fff41b1aaa045212763fb4e1b02fdc", "id": 8}, {"size": 1, "snippet": "means the average rate of electric energy delivery during one (1) Metering Interval, converted to an hourly rate of electric energy delivery, in kWh per hour, that is equal to the product of Metered Energy for one (1) Metering Interval, in kWh per Metering Interval, times the number of Metering Intervals in a one (1) hour period", "snippet_links": [{"key": "rate-of", "type": "clause", "offset": [18, 25]}, {"key": "energy-delivery", "type": "clause", "offset": [35, 50]}, {"key": "metering-interval", "type": "definition", "offset": [66, 83]}, {"key": "hourly-rate", "type": "clause", "offset": [101, 112]}, {"key": "equal-to", "type": "definition", "offset": [167, 175]}, {"key": "the-product", "type": "clause", "offset": [176, 187]}, {"key": "metered-energy", "type": "definition", "offset": [191, 205]}, {"key": "number-of", "type": "definition", "offset": [277, 286]}], "samples": [{"hash": "fsBgg8qHG8T", "uri": "/contracts/fsBgg8qHG8T#power-output", "label": "Power Purchase and Sale Agreement", "score": 21.0, "published": true}], "hash": "032bd259bcc2b26700dba9b6aae45d19", "id": 9}, {"size": 1, "snippet": "means the electricity production of the micro-turbines, expressed in megawatts.", "snippet_links": [], "samples": [{"hash": "j0zTBOLfNJs", "uri": "https://www.accessenvironment.ene.gov.on.ca/instruments/2866-7W5S7K-14.pdf", "label": "www.accessenvironment.ene.gov.on.ca", "score": 10.1704311371, "published": false}], "hash": "702bee6584a43cfccede42d9e676407a", "id": 10}], "next_curs": "ClkSU2oVc35sYXdpbnNpZGVyY29udHJhY3RzcjULEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIVcG93ZXItb3V0cHV0IzAwMDAwMDBhDKIBAmVuGAAgAA==", "definition": {"size": 90, "snippet": "means the average rate of electric energy delivery during one Metering Interval, converted to an hourly rate of electric energy delivery, in kWh per hour, that is equal to the product of Metered Energy for one Metering Interval, in kWh per Metering Interval, times the number of Metering Intervals in a one-hour period.", "title": "Power Output", "id": "power-output", "examples": ["The Generating Facility shall be deemed to have satisfied the Six-Hour Demonstration if the <strong>Power Output</strong> in each and every Metering Interval during the six-hour period equals or exceeds the Firm Contract Capacity set forth in Section 1.02(d).", "In all measurements of Actual <strong>Power Output</strong>, the effect of test uncertainty needs to be considered as per IEC 61215.", "This exclusive remedy shall not be deemed to have failed its essential purpose so long as First Solar is willing and able to replace or repair the breaching products, or to supplement with additional Product as described under \u201cTwenty-Five Year <strong>Power Output</strong> Warranty\u201d above.", "Seller may elect to apply corrections to the Demonstrated Rate of Metered Energy or <strong>Power Output</strong> to adjust for Ambient Factors.", "In the special case of a less-than-one-day Maintenance Outage that directly follows another less-than-one-day Maintenance Outage, Benchmark Capacity of the outage that follows is defined as the highest Hourly <strong>Power Output</strong>, not to exceed Firm Contract Capacity, between these two outage time periods.", "Actual <strong>Power Output</strong> (Year=1) \u2265 Nominal Power * (1 - 2%) Actual <strong>Power Output</strong>(Year=N, 2\u2264N\u226425\uff09\u2265 Nominal Power *( 1 \u2013(2% + 0.55% *(N-1)) The actual <strong>power output</strong> is to be measured under standard testing condition (\u201cSTC\u201d or \u201cStandard Test Conditions\u201d) in an independent testing lab accepted by the Supplier or previously designated by the Supplier, and when measuring the actual <strong>power output</strong>, measurement equipment tolerance is to be taken into consideration, as per IEC60904.", "For purposes of this Exhibit D-1, \u201cBenchmark Capacity\u201d is defined as the highest Hourly <strong>Power Output</strong>, not to exceed Firm Contract Capacity, during the first 24-hour period which precedes the Force Majeure event and does not overlap another Curtailment Period, Maintenance Outage, or Major Overhaul.", "For purposes of this Exhibit D-2, \u201cBenchmark Capacity\u201d is defined as the highest Hourly <strong>Power Output</strong>, not to exceed Firm Contract Capacity, during the first 24-hour period which precedes the curtailment notification and does not overlap another Curtailment Period, Maintenance Outage, or Major Overhaul.", "For purposes of this Exhibit E, \u201cBenchmark Capacity\u201d is defined as the highest Hourly <strong>Power Output</strong>, not to exceed Firm Contract Capacity, at or after the time of outage notification, and before the start of the outage.", "In addition, \u2587\u2587\u2587\u2587\u2587 Solar warrants that for a period of twenty-five years commencing on the Warranty Start Date, the loss of <strong>power output</strong> relating to the initial guaranteed power which is defined as Peak Power \u2587\u2587\u2587\u2587\u2587 Pmax(Wp) plus Peak Power \u2587\u2587\u2587\u2587\u2587 Pmax(Wp) multiplied by the lower limit of the <strong>Power Output</strong> Tolerance Pmax(%)\u2013as specified in the relevant Product Data Sheet and measured at Standard Test Conditions (STC) for the Product(s) shall not exceed \uf0b7 For Polycrystalline Products (as defined in Sec."], "related": [["output", "Output", "Output"], ["combined-sewer-overflow", "Combined sewer overflow", "Combined sewer overflow"], ["high-voltage", "high voltage", "high voltage"], ["low-voltage", "low voltage", "low voltage"], ["net-output", "Net Output", "Net Output"]], "related_snippets": [], "updated": "2025-09-26T05:34:23+00:00"}, "json": true, "cursor": ""}}