Power Characteristic Curve Test definition

Power Characteristic Curve Test means that the Buyer independently specifies the test time bucket for power curve within warranty period in accordance with wind regime and production status of the site to test the power curve of each fan recorded by the central monitoring system of wind turbine generator system or the power curve tested on site according to IEC61400-12 during the test time bucket.

Related to Power Characteristic Curve Test

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Maximum Concentration Level Assessment means the Maximum Concentration Level Assessment for the purposes of a Basic Comprehensive Certificate of Approval, described in the Basic Comprehensive User Guide, prepared by a Toxicologist using currently available toxicological information, that demonstrates that the concentration at any Point of Impingement for a Compound of Concern that does not have a Ministry Point of Impingement Limit is not likely to cause an adverse effect as defined by the EPA. The concentration at Point of Impingement for a Compound of Concern must be calculated in accordance with O. Reg. 419/05.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Subprojects means more than one such Subproject.

  • Cannabis testing facility means an entity registered by

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Obligation Characteristics means any one or more of Not Subordinated, Specified Currency, Not Sovereign Lender, Not Domestic Currency, Not Domestic Law, Listed and Not Domestic Issuance, and:

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Subproject means a specific water and/or sanitation Subproject financed or to be financed by a Subproject Grant (as hereinafter defined) provided from the proceeds of the Credit under Part C.1 of the Project;

  • Completion Rate means the percentage of an apprenticeship cohort who receives a certificate of apprenticeship completion within 1 year of the projected completion date. An apprenticeship cohort is the group of individual apprentices registered to a specific program during a 1 year time frame, except that a cohort does not include the apprentices whose apprenticeship agreement has been cancelled during the probationary period or who have transferred.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Case characteristics means demographic or other objective characteristics of a small

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Turbidity means the cloudy condition of water due to the presence of extremely fine particulate materials in suspension that interfere with the passage of light.

  • Treatability study means a study in which a hazardous waste is subjected to a treatment process to determine: (1) Whether the waste is amenable to the treatment process, (2) what pretreatment (if any) is required, (3) the optimal process conditions needed to achieve the desired treatment, (4) the efficiency of a treatment process for a specific waste or wastes, or (5) the characteristics and volumes of residuals from a particular treatment process. Also included in this definition for the purpose of the § 261.4 (e) and (f) exemptions are liner compatibility, corrosion, and other material compatibility studies and toxicological and health effects studies. A “treatability study” is not a means to commercially treat or dispose of hazardous waste.

  • Phase II Trial means a clinical trial of a Licensed Product on patients, including possibly pharmacokinetic and dose ranging studies, the principal purposes of which are to make a preliminary determination that such Licensed Product is safe for its intended use and to obtain sufficient information about such Licensed Product’s efficacy to permit the design of further clinical trials, and generally consistent with 21 CFR §312.21(b), or its successor regulation, or the equivalent in any foreign country.

  • Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.

  • Quantitative fit test or "QNFT" means an assessment of the adequacy of respirator fit by numerically measuring the amount of leakage into the respirator.

  • Critical Test Concentration or "(CTC)" means the specified effluent dilution at which the Permittee is to conduct a single-concentration Aquatic Toxicity Test.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Instantaneous flow measurement means the flow measured during the minimum time required for the flow-measuring device or method to produce a result in that instance. To the extent practical, instantaneous flow measurements coincide with the collection of any grab samples required for the same sampling period so that together the samples and flow are representative of the discharge during that sampling period.

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Delinquency Test means, for any Payment Date, a test that will be satisfied if