Planned System Acceptance Date definition

Planned System Acceptance Date means the date on which Acceptance is scheduled to be achieved, being 28 February 2027.
Planned System Acceptance Date means the date on which System Acceptance is scheduled to be achieved being 28 February 2027;

Related to Planned System Acceptance Date

  • Final Acceptance Date means the date on which Final Acceptance occurs.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Scheduled Project Completion Date shall have the meaning specified in Section 6.3 (c);

  • Scheduled Completion Date shall be the date set forth in Clause 10.3;

  • Project Start Date means the first Milestone Start Date specified in Schedule B;

  • Billing Commencement Date means the earlier of:

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Scheduled Downtime has the meaning set forth in Section 5.2.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Acceptance Date has the meaning set forth in Section 2.05(a)(v)(D)(2).

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Final Completion Date means the date on which Final Completion occurs.

  • Scheduled Commissioning Date or “SCD” of the Project shall mean [Insert Date];

  • Scheduled Commercial Operation Date shall have the meaning ascribed to it in Clause 5.4.1;

  • In-Service Date means the date on which the Facility and System Modifications (if applicable) are complete and ready for service, even if the Facility is not placed in service on or by that date.

  • Service Drop means the overhead service conductors from the service point to the connection to the service-entrance conductors at the building or other structure.

  • Contract Start Date means the date specified in your Contract for Signature asthe date this Contract starts;

  • Final Acceptance means final written acceptance of all the Work by the Commissioner, a copy of which shall be sent to the Contractor.

  • Planned Downtime means any period of time during which the Service is unavailable due to Conga’s planned maintenance and support of the Service or Conga System. Planned Downtime shall not exceed 5 hours per month. Conga will endeavor to give at least 24 hours’ notice before Planned Downtime except for urgent circumstances (e.g., a system failure or security threat). Planned Downtime occurs from 10:00 p.m. Friday through 1:00 p.m. Sunday, Mountain Time.

  • Final completion and acceptance means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.

  • Service Commencement Date means the date the Transmission Provider begins to provide service pursuant to the terms of an executed Service Agreement, or the date the Transmission Provider begins to provide service in accordance with Tariff, Part II, section 15.3 or Tariff, Part III, section 29.1.

  • Commencement Date or Handover Date means the date on which the Licensed Space of first lot of stations as per Annexure 1 is handed over by DMRC to the Selected Bidder, in accordance with the terms of this agreement.

  • Project Commencement Date means the commencement date notified to the Minister pursuant to clause 4(1);