Phase II Interconnection Study definition

Phase II Interconnection Study means an engineering and operational study conducted or caused to be performed by the CAISO once per calendar year, in coordination with the applicable Participating TO(s), to determine the Point of Interconnection and a list of facilities (including the Participating TO’s Interconnection Facilities, Network Upgrades, Distribution Upgrades, and Stand Alone Network Upgrades), the cost of those facilities, and the time required to interconnect the Generating Facility(ies) with the Participating TO’s Transmission System.
Phase II Interconnection Study has the meaning set forth in the CAISO Tariff.
Phase II Interconnection Study means an engineering and operational study conducted or caused to be performed by the CAISO once per calendar year, in coordination with the applicable Participating TO(s),by the Distribution Provider to determine the Point of Interconnection and a list of facilities (including the Participating TO’sDistribution Provider’s Interconnection Facilities, Network Upgrades, Distribution Upgrades, and Stand Alone Network Upgrades), the estimated cost of those facilities, and the estimated time required to interconnect the Generating Facility(ies) with the Participating TO’s TransmissionDistribution System. The portion of the study required to evaluate the impacts on the ISO Grid will be coordinated with the ISO and will be completed in a manner consistent with the ISO Tariff GIP. Phased Generating Facility shall mean a Generating Facility that is structured to be completed and to achieve Commercial Operation in two or more successive sequences that are specified in this LGIA, such that each sequence comprises a portion of the total megawatt generation capacity of the entire Generating Facility.

Examples of Phase II Interconnection Study in a sentence

  • Asynchronous Generating Facilities shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Phase II Interconnection Study shows this to be required for system safety or reliability.

  • The Phase II Interconnection Study shall also identify the electrical switching configuration of the connection equipment, including, without limitation: the transformer, switchgear, meters, and other station equipment; the nature and estimated cost of any Participating TO's Interconnection Facilities and Network Upgrades necessary to accomplish the interconnection; and an estimate of the time required to complete the construction and installation of such facilities.

  • An Asynchronous Generating Facility shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Phase II Interconnection Study shows that such a requirement is necessary to ensure safety or reliability.

  • The CAISO will issue a final Phase II Interconnection Study report to the Interconnection Customer.

  • The Interconnection Customer withdraws the Interconnection Request or terminates the GIA based on a material change from the Phase I Interconnection Study in the Point of Interconnection for the Generating Facility mandated by the CAISO and included in the final Phase II Interconnection Study.

  • Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Phase II Interconnection Study shows this to be required for system safety or reliability.

  • Without additional information on the number of vacancies, this measure does not provide sufficient information to be helpful to districts considering whether to adopt an induction program.

  • Within thirty (30) calendar days of providing the final Phase II Interconnection Study report to the Interconnection Customer, the applicable Participating TO(s), the CAISO and the Interconnection Customer shall meet to discuss the results of the Phase II Interconnection Study, including selection of the final Commercial Operation Date.

  • At the request of the Interconnection Customer or at any time the CAISO determines that it will not meet the required time frame for completing the Phase II Interconnection Study, the CAISO shall notify the Interconnection Customer as to the schedule status of the Phase II Interconnection Study and provide an estimated completion date with an explanation of the reasons why additional time is required.

  • Generation projects entering the Phase II Interconnection Study will also be considered in the Unified Planning Assumptions, as appropriate.

Related to Phase II Interconnection Study

  • Interconnection Study means any of the studies defined in the CAISO’s Tariff or any Transmission/Distribution Owner’s tariff that reflect methodology and costs to interconnect the Facility to the Transmission/Distribution Owner’s electric grid.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Optional Interconnection Study means a sensitivity analysis of an Interconnection Request based on assumptions specified by the Interconnection Customer in the Optional Interconnection Study Agreement.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Optional Interconnection Study Agreement means the form of agreement for preparation of an Optional Interconnection Study, as set forth in Tariff, Attachment N-3. Part I:

  • Phase I Study means a study in humans which provides for the first introduction into humans of a product, conducted in healthy volunteers or patients to obtain information on product safety, tolerability, pharmacological activity or pharmacokinetics, as more fully defined in 21 C.F.R. § 312.21(a) (or the non-United States equivalent thereof).

  • Firm Transmission Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part II, section 19.3 and Tariff, Part III, section 32.3.

  • Phase II Study means a study in humans of the safety, dose ranging or efficacy of a product, as further defined in 21 C.F.R. § 312.21(b) (or the equivalent thereof outside the United States).

  • Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.

  • Phase I Clinical Study means a human clinical study of a product, the principal purpose of which is a preliminary determination of safety in healthy individuals or patients, as described in 21 C.F.R. 312.21(a).

  • Phase II Clinical Study means a human clinical study of a product initiated to determine the safety and efficacy in the target patient population, as described 21 C.F.R. 312.21(b).

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Transmission Owner Interconnection Facilities means all Interconnection Facilities that are not Customer Interconnection Facilities and that, after the transfer under Tariff, Attachment P, Appendix 2, section 5.5 to the Interconnected Transmission Owner of title to any Transmission Owner Interconnection Facilities that the Interconnection Customer constructed, are owned, controlled, operated and maintained by the Interconnected Transmission Owner on the Interconnected Transmission Owner’s side of the Point of Interconnection identified in appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System or interconnected distribution facilities. Transmission Provider: The “Transmission Provider” shall be the Office of the Interconnection for all purposes, provided that the Transmission Owners will have the responsibility for the following specified activities:

  • Phase I Clinical Trial means a clinical trial conducted in healthy humans or patients, which clinical trial is designed to establish the safety, drug-drug interactions and/or pharmacokinetics of an investigational drug given its intended use, and to support continued testing of such drug in Phase II Clinical Trials.

  • Phase 2 Clinical Trial means a human clinical trial of a product in any country that would satisfy the requirements of 21 C.F.R. 312.21(b) and is intended to explore a variety of doses, dose response, and duration of effect, and to generate initial evidence of clinical safety and activity in a target patient population, or a similar clinical study prescribed by the relevant Regulatory Authorities in a country other than the United States.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1(b) of Schedule 2 to this Agreement.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Phase II Clinical Trial means a controlled human clinical study that would satisfy the requirements of 21 CFR 312.21(b), conducted to study the effectiveness and establish the dose range of a Product for a particular Indication in patients with the disease or condition under study, including a Phase IIA Clinical Study or Phase IIB Clinical Study.

  • Phase 4 Clinical Trial means a Clinical Trial of a Product conducted after Regulatory Approval of such Product has been obtained from an appropriate Regulatory Authority, which trial is (a) conducted voluntarily by a Party to enhance marketing or scientific knowledge of the Product, or (b) conducted due to a request or requirement of a Regulatory Authority.

  • Phase II Trial means a clinical trial of a Licensed Product on patients, including possibly pharmacokinetic and dose ranging studies, the principal purposes of which are to make a preliminary determination that such Licensed Product is safe for its intended use and to obtain sufficient information about such Licensed Product’s efficacy to permit the design of further clinical trials, and generally consistent with 21 CFR §312.21(b), or its successor regulation, or the equivalent in any foreign country.

  • Interconnection is As Defined in the Act.

  • Phase I Trial means a clinical trial of a Licensed Product in human patients conducted primarily for the purpose of determining the safety, tolerability and preliminary activity of the Licensed Product, including, without limitation, for determining the maximum tolerated dose, or optimal dose. For purposes of this Agreement, a Phase I trial shall specifically exclude a study in healthy volunteers.