Phase I Construction definition

Phase I Construction. Section 2.2 "Phase II Construction" Section 2.2 "Phase I Construction Commitment Amount" Section 2.2 "Phase II Construction Commitment Amount" Section 2.2 "Phase I Construction Commitment Amount Section 6.1.4 Certification" "Phase II Construction Commitment Amount Section 6.2.4 Certification" "Potential Default" Section 6.1.2 "Premises Section 7.15.1 "Regulatory Change" Section 8.15 "Required Lenders" Section 11.8 "Revolving Loan" Section 2.1 "SEC" Section 8.2.12 "Syndication Interest" Section 11.1 "Syndication Party LC Payment Date" Section 11.3.3 "Syndication Party Loan Payment Date" Section 11.3.2 "Syndication Party Payment Date" Section 11.3.3 "Termination Date" Section 2.1 "Three Month Anniversary Date" Section 5.2 "Transfer" Section 11.26 "Unused Commitment Fee Reset Date" Section 4.9 "Unused Line Fee" Section 4.9 "Variable Rate" Section 4.1 "Wire Instructions" Section 11.27
Phase I Construction means all work to be completed using the Start Up Period including Licensee's initial demolition or preparation of predetermined sites that will be used for the installation of solar panels and/or associated equipment as more fully described in Exhibit 2.

Examples of Phase I Construction in a sentence

  • The company believes that it will take approximately 24 months after land purchase to complete Phase I Construction.

  • Upon completion of Phase I Construction the relevant facility will be operational.

  • Corkscrew Road Widening Project – Phase I Construction Project: The project widens Corkscrew Road to six lanes from Ben Hill Griffin Parkway to Fire House Lane, and to four lanes from Fire House Lane to Bella Terra Boulevard.

  • Puddingstone Heights Road Improvement Project, Phase I Construction on the Puddingstone Heights Improvement project is continuing.

  • Redwood City, CA 94063 *The bids did not include the Direct Costs of Phase I Construction Trade Packages, which are to be determined, up to an estimated total amount of $500,000,000.

  • The bids did not include the Direct Costs of Phase I Construction Trade Packages, which are to be determined, up to an estimated total amount of $500,000,000.

  • Phase I Construction means all the physical improvements constructed by other parties under contracts 1 through 4 as described in more detail in Section 1 of Division II.

  • Approach• Phase I: Construction and final assembly of Sandia/Caterpillar alternative fuels optical engine laboratory.• Phase II: Initial shakedown/evaluation of engine performance, hardware infrastructure, and data acquisition systems.• Phase III: Preliminary imaging study of glow plug assisted ignition and combustion of a low-cetane, highly-oxygenated alternative fuel.

  • The Construction Phasing/Sequencing Plan shall include a specific description of the Proposer’s planned coordination with Phase I Construction, strategy to alleviate traffic congestion on the Presidio Parkway, and will address limitations contained in the right of entry agreement with the Presidio Trust.

  • Ms. Kinnear reported the Committee forwarded to the Board consent agenda an Award of Contract for the Fare Collection System and Final Acceptance for Division Street Stops Phase II, Moran Station Park and Ride Construction, and Monroe-Regal Phase I Construction.

Related to Phase I Construction

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Original construction ’ shall mean the first or initial construction

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Construction and demolition debris means and includes:

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Constructional Plant means all equipments, materials, appliances or things of whatsoever nature required for execution, completion or maintenance of the works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Foreign construction material means a construction material other than a domestic construction material.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • construction site means a workplace where construction work is being performed;

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.