Phase 1 GP Lanes definition

Phase 1 GP Lanes means: For the purpose of the work being carried out under the Phase 1 Design-Build Contract the general purpose lanes to be constructed under the Phase 1 Design-Build Contract; For the purpose of the performance of the Services, the general purpose lanes on US 36 described at Section 1.2.12 of the HPTE Services Requirements; For the purpose of the performance of the Snow and Ice Control Services means the general purpose lanes and the BOS Corridors on US 36 described at Section 2 of the HPTE Snow and Ice Control Services Requirements.

Examples of Phase 1 GP Lanes in a sentence

  • Upon the occurrence of the satisfaction (or waiver by HPTE) of the requirements of 2.4(a), the Concessionaire will commence the delivery of the Services and the Snow and Ice Control Services in relation to the Phase 1 Managed Lanes and the Phase 1 GP Lanes and shall start to receive Toll Revenues in relation to the Phase 1 Managed Lanes.

  • The Concessionaire is obligated to provide the Snow and Ice Control Services in the US 36 GP Lanes starting with the Phase 1 GP Lanes from the Phase 1 Services Commencement Date and extending to the whole of the US 36 GP Lanes on the Full Services Commencement Date.

  • Approximately 77% of such fee is payable for the Phase 1 GP Lanes prior to the Full Services Commencement Date.

  • In Hulme, concerns for the safety of families with young children raised by tenant campaigning saw a gradual policy shift from the mid-1970s, leading to the cessation of new allocations to these groups of tenants to flats above the ground in most blocks.

  • The Concessionaire is obligated to provide GP Routine Maintenance Services in the US 36 GP Lanes starting with the Phase 1 GP Lanes from the Phase 1 Services Commencement Date and extending to the whole of the US 36 GP Lanes on the Full Services Commencement Date.

  • Upon the occurrence of the Phase 1 Services Commencement Date, the Concessionaire will commence the delivery of the Services and the Snow and Ice Control Services in relation to the Xxxxx 0 Xxxxxxx Xxxxx and the Phase 1 GP Lanes.

  • Upon the occurrence of the Phase 1 Services Commencement Date, the Concessionaire will commence the delivery of the Services and the Snow and Ice Control Services in relation to the Phase 1 Managed Lanes and the Phase 1 GP Lanes and can start to receive Toll Revenues from the Phase 1 Managed Lanes as well as from the I-25 Managed Lanes.

Related to Phase 1 GP Lanes

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Ground water means water below the land surface in a zone of saturation.

  • Permeable pavement means paving material that absorbs water or allows water to infiltrate through the paving material. "Permeable pavement" materials include porous concrete, permeable interlocking concrete pavers, concrete grid pavers, porous asphalt, and any other material with similar characteristics.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • Phase 2 means the second implementation phase of this section, beginning June 1, 2022 and continuing thereafter.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Interconnection Study means any of the studies defined in the CAISO’s Tariff or any Transmission/Distribution Owner’s tariff that reflect methodology and costs to interconnect the Facility to the Transmission/Distribution Owner’s electric grid.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Project Start Date means the first Milestone Start Date specified in Schedule B;

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.

  • Modular building means, but shall not be limited to, single and multifamily houses, apartment

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Phase II means the second part of the tuition incentive assistance program which provides assistance in the third and fourth year of 4-year degree programs.

  • Cluster development means a contiguous cluster or

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.