Busy Line Verification (BLV means a service whereby an End User requests an operator to confirm the busy status of a line.
Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.
Certified cabinet x-ray system means an x-ray system that has been certified in accordance with 21 CFR 1010.2 as being manufactured and assembled pursuant to the provisions of 21 CFR 1020.40.
Data Universal Number System (DUNS) Number means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
Open type traction battery means a type of battery requiring liquid and generating hydrogen gas released to the atmosphere.
Healing arts screening means the testing of human beings using x-ray machines for the detection or evaluation of health indications when such tests are not specifically and individually ordered by a licensed practitioner of the healing arts legally authorized to prescribe such x-ray tests for the purpose of diagnosis or treatment.
Subsidized Xxxxxxxx Loan means a Loan for which the interest rate is governed by Section 427A(a) or 427A(d) of the Higher Education Act.
Area Agency on Aging (AAA means the Department of Human Services designated agency charged with the responsibility to provide a comprehensive and coordinated system of services to seniors and individuals with disabilities in a planning and service area. For the purpose of these rules, the term Area Agency on Aging is inclusive of both Type A and Type B Area Agencies on Aging as defined in ORS 410.040 and described in ORS 410.210 to 410.300.
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Location Routing Number (LRN means the ten (10) digit number that is assigned to the network switching elements (Central Office–Host and Remotes as required) for the routing of calls in the network. The first six (6) digits of the LRN will be one of the assigned NPA NXX of the switching element. The purpose and functionality of the last four (4) digits of the LRN have not yet been defined but are passed across the network to the terminating switch.
Lot Line, Front means, in the case of an interior lot, the line dividing the lot from the street. In the case of a corner lot, the shorter lot line abutting a street shall be deemed the front lot line. In the case of a corner lot where the length of the lot lines abutting a street are equivalent or there are three abutting streets the front lot line shall be deemed to be the lot line where the face of the building intended to be the front is located. In the case of a through lot, only one of the lot lines abutting a street shall be deemed to be the front lot line.
Diagnostic x-ray system means an x-ray system designed for irradiation of any part of the human or animal body for the purpose of diagnosis or visualization.
CAFRA Centers, Cores or Nodes means those areas with boundaries incorporated by reference or revised by the Department in accordance with N.J.A.C. 7:7-13.16.
Certified Remanufacture System or Verified Engine Upgrade means engine upgrades certified or verified by EPA or CARB to achieve a reduction in emissions.
Development Location Point means a single point selected by the Applicant on the proposed Development site that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development. For a Development which consists of Scattered Sites, this means a single point on the site with the most units that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development.
Closing of the Books Method means the apportionment of items between portions of a taxable period based on a closing of the books and records on the Distribution Date (as if the Distribution Date was the end of the taxable period), provided that any items not susceptible to such apportionment (such as real or personal property taxes imposed on a periodic basis) shall be apportioned on the basis of elapsed days during the relevant portion of the taxable period.
Project Number means a unique number assigned to the project by the department or the city, village, town or county that is undertaking the project.
Simplified and/or aggregate billing arrangement means a billing arrangement providing additional medical gap benefits.
District and high school graduation report means a report of the number of pupils, excluding adult education participants, in the district for the immediately preceding school year, adjusted for those pupils who have transferred into or out of the district or high school, who leave high school with a diploma or other credential of equal status.
Switched Access Detail Usage Data means a category 1101xx record as defined in the EMI iconectiv Practice BR 010-200-010.
Service Availability The total number of minutes in a calendar quarter that the Tyler Software is capable of receiving, processing, and responding to requests, excluding maintenance windows, Client Error Incidents and Force Majeure.
IntraLATA LEC Toll means IntraLATA Toll traffic carried solely by a Local Exchange Carrier and not by an IXC. "IntraLATA Toll Traffic" describes IntraLATA Traffic outside the Local Calling Area.
District and high school graduation rate means the annual completion and pupil dropout rate that is calculated by the center pursuant to nationally recognized standards.
Emergency Service Number or "ESN" is a three to five digit number representing a unique combination of Emergency Response Agencies (law enforcement, fire and emergency medical service) designed to serve a specific range of addresses within a particular geographical area. The ESN facilitates Selective Routing and transfer, if required, to the appropriate PSAP and the dispatch of proper Emergency Response Agency(ies).
Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.
Health screening means the use of one or more diagnostic tools to test a person for the presence or precursors of a particular disease.