Examples of ONTARIO LAND SURVEYOR in a sentence
THE PRECISE LOCATION OF THE CURRENT PROPERTY BOUNDARIES AND EASEMENTS CAN ONLY BE DETERMINED BY AN UP-TO-DATE LAND TITLES SEARCH AND A SUBSEQUENT CADASTRAL SURVEY PERFORMED AND CERTIFIED BY AN ONTARIO LAND SURVEYOR.
Hartwick ONTARIO LAND SURVEYOR OWNER'S CERTIFICATE This is to certify that I am the owner / agent of the lands to be subdivided and that this plan was prepared in accordance with my instructions.
Lancaster ONTARIO LAND SURVEYOR OWNER'S CERTIFICATE This is to certify that I am the owner of the lands to be subdivided and that this plan was prepared in accordance with my instructions.
Since he didn’t giveTHE ONTARIO LAND SURVEYOR, SPRING 1979 39notice to the cottagers that he proposed to close the road, it should be left open for the weekend.
PLAN OF BLOCK 284REGISTERED PLAN 50M-308 CITY OF CLARENCE-ROCKLAND COUNTY OF RUSSELLScale 1:500 10 0 10 20 30 METRES S C H E D U L E O F L A N D U S E AREA OF BLOCKS = 2.417 Hectares 5.97(Acres)AREA OF ROADS = 0.485 Hectares 1.2 (Acres) TOTAL AREA OF SUBDIVISION = 2.902 Hectares 7.17 (Acres) July 22, 2021DATE FRANCIS LAU ONTARIO LAND SURVEYOR NOTE:THE PLAN DATA IS COMPILED FROM OFFICE RECORDS OF STANTEC GEOMATICS LTD.
Lancaster ONTARIO LAND SURVEYOR NOTES: Minimum - Exterior side yards 3.0 - Front yard to garage 5.2 - Rear yard 6.0 - Building separation 3.0 * Includes 3 partial units on adjacent development by others.
ONTARIO LAND SURVEYOR NAME:NAME: TITLE: MAILING ADDRESS: POSTAL CODE: TELEPHONE NUMBER: FAX NUMBER: EMAIL: 4.
Handouts:• Crafton Hills College Chart of Accounts Definitions• Object Code Guidelines• EDU Reports Reporting Charlie Ng will be back on November 6th to do a presentation on EDU Reports.
Data is collected by literature studies, FGDs and informal discussions with respondents.
The following block shall appear on the face of a plan of survey:METRICMEASUREMENTS SHOWN ON THIS PLAN ARE IN METRESAND MAY BE CONVERTED TO FEET BY DIVIDING BY THEFACTOR 0.3048THE ONTARIO LAND SURVEYOR, FALL 1976 9 METRIC TASK FORCE— cont’d.The above note on the face of the plan will automatically eliminate the symbol ‘m ’ after the linear measurements.No dual dimensioning (Imperial and metric) shall appear on the plan.