On-site stormwater management definition

On-site stormwater management means the design and construction of systems necessary to control stormwater within an immediate development.
On-site stormwater management means the design and construction of stormwater management practices that are required for a specific land disturbing activity.
On-site stormwater management means a BMP or stormwater system designed and constructed to control stormwater within the project site.

More Definitions of On-site stormwater management

On-site stormwater management means the design and construction of a facility necessary to control stormwater runoff within and for a single development.
On-site stormwater management means the design and construction of systems necessary to control stormwater within an immediate project facility.
On-site stormwater management means the design and construction of stormwater manage- ment practices that are required for a specific land disturbing activity.
On-site stormwater management means the design and construction of systems necessary to control stormwater within the limits of the project.

Related to On-site stormwater management

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management system means any equipment, plants,

  • Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Construction Management Agreement means the Construction Management Agreement, dated as of the date of the Common Agreement, between Construction Manager and the Project Company.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Load Management means a Demand Resource (“DR”) as defined in the Reliability Assurance Agreement.

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • disaster management means a continuous and integrated process of planning, organising, coordinating and implementing measures which are necessary or expedient for—

  • Stormwater means water resulting from precipitation (including rain and snow) that runs off the land’s surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Property Management Agreement means any Property Management Agreement between the Company and the Property Manager.

  • Project Management Agreement means the agreement dated the 20th February 1985 made between the Trustee and the Manager providing for the Manager to manage and co‑ordinate the development and construction of the Resort and includes, if that agreement is terminated, any other agreement in like and similar terms made with the prior consent of the Minister;

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Project Management The individuals appointed by each Party cf. clause 4.1 in the Agreement.

  • Construction management contract means a contract in which a party is retained by the owner to

  • Remediation waste management site means a facility where an owner or operator is or will be treating, storing or disposing of hazardous remediation wastes. A remediation waste management site is not a facility that is subject to corrective action under § 264.101 of this regulation, but is subject to corrective action requirements if the site is located in such a facility.

  • Property management system means the Contractor’s system or systems for managing and controlling Government property.

  • PJM Management means the officers, executives, supervisors and employee managers of PJM. PJM Manuals: