Examples of Office of Engineering in a sentence
The requirements for these bearings are listed in the NYS DOT Standard Specifications, Construction and Materials, English Units, Office of Engineering, May 1, 2008, as amended, (to be referred to as NYS Spec Book).
The design and construction shall be in conformance with the latest edition of the New York State Department of Transportation, Standard Specifications, with addenda, issued by the Office of Engineering, current as of the date of Proposal submission, excluding Section 100, which is superseded by Part 2, Section DB 100 of the Contract Documents, and except as otherwise noted in these Contract Documents.
Baltimore, MD Responsible school or office: Office of Engineering and Construction Contact person: Richard H.
This calculation was based on methodology prescribed by the FCC Office of Engineering and Technology Bulletin No. 65E, Edition 97-01 (August 1997) that assumes all antennas in a sector would be pointed at the base of the tower and all channels would be operating simultaneously, which creates the highest possible power density levels.
Prior to the commencement of operation, the Certificate Holder shall provide the Council worst-case modeling of the electromagnetic radio frequency power density of all proposed entities’ antennas at the closest point of uncontrolled access to the tower base, consistent with Federal Communications Commission, Office of Engineering and Technology, Bulletin No. 65, August 1997.
Each user of this certificate, other than the original petitioner, shall register his identity in writing to the Office of Engineering and Research, (PHH-23), Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, Washington D.C. 20590-0001.
See FCC’s Office of Engineering and Technology and Consumer & Governmental Affairs Bureau, Measuring Broadband America Policy on Openness and Transparency, http://www.fcc.gov/measuring-broadband-america/openness-transparency-policy (last visited Feb.
The Design shall be in conformance with the latest edition of the New York State Department of Transportation, Standard Specifications, with addenda, issued by the Office of Engineering, current as of the date of Proposal submission, except as noted in these Contract Documents.
This calculation was based on methodology prescribed by the FCC Office of Engineering and Technology Bulletin No. 65E, Edition 97-01 (August 1997) that assumes all antennas would be pointed at the base of the tower and all channels would be operating simultaneously, which creates the highest possible power density levels.
As a further condition, the grant- ee shall provide information on the lo- cations where the devices are installed to the FCC Office of Engineering and Technology, which shall provide this information to the Federal Govern- ment through the National Tele- communications and Information Ad- ministration.