Net Unit Electrical Output Guarantee definition

Net Unit Electrical Output Guarantee has the meaning set forth in Section 11.6(a).
Net Unit Electrical Output Guarantee has the meaning set forth in Section 11.6. “[**]” in this Exhibit 10.01 indicates material that has been omitted pursuant to a request for confidential treatment and filed separately with the Securities and Exchange Commission. Execution Version Confidential Trade Secret InformationSubject to Restricted Procedures
Net Unit Electrical Output Guarantee has the meaning set forth in Section 11.6. Execution Version Confidential Trade Secret InformationSubject to Restricted Procedures

Examples of Net Unit Electrical Output Guarantee in a sentence

  • The Parties agree that it would be extremely difficult and impracticable under presently known and anticipated facts and circumstances to ascertain and fix the actual damages Owner would incur in the event that the Unit fails to meet the Net Unit Electrical Output Guarantee, and, accordingly Owner's remedy for such failure shall be to recover from Contractor as liquidated damages, and not as a penalty, the Performance Liquidated Damages.

  • Meeting the Net Unit Electrical Output Guarantee demonstrates that the Unit shall be capable of producing an average annual Net Unit Electrical Output of 1,117 MWe.

  • If the Unit does not meet the Net Unit Electrical Output Guarantee due to Contractor's fault, Owner's remedy for such failure shall be to recover from Contractor Performance Liquidated Damages of two thousand dollars ($2,000) for each whole KWe that the Net Unit Electrical Output, as demonstrated by a Net Unit Electrical Output Test, is below the Net Unit Electrical Output Guarantee.

  • Contractor shall bear the burden of proving that a failure to meet the Net Unit Electrical Output Guarantee, [***] or Moisture Carryover Guarantee was not due to an act or omission of Contractor or its Personnel.

  • In the event that the Net Unit Electric Output, as determined by the Net Unit Electrical Output Test, exceeds the Net Unit Electrical Output Guarantee, then Contractor shall be entitled to receive as a bonus an amount equal to [***].

  • In accordance with the further requirements of Section 11.6(a), the measurement frequency shall be every sixty (60) minutes throughout the test, and the average value of those data points shall be used to determine compliance with the Net Unit Electrical Output Guarantee.

  • Meeting the Net Unit Electrical Output Guarantee demonstrates that [**].

  • In the event a Unit [***] does not meet the Net Unit Electrical Output Guarantee, Contractor shall engage in an engineering review and analysis of the performance deficiency, in consultation with Owner, to determine possible options to correct the deficiency or improve the output.

  • The Net Unit Electrical Output Guarantee is based upon the Unit operating at the conditions specified in Exhibit L.

  • To determine the Net Unit Electrical Output Liquidated Damages, [***] In the event that, as provided in Section 11.6(a)(i), Contractor is entitled to receive a refund of all or the applicable portion of the Net Unit Electrical Output Liquidated Damages paid, there shall be deducted from the refund the amount of [***] for each Day that the Unit operated below the Net Unit Electrical Output Guarantee.

Related to Net Unit Electrical Output Guarantee

  • Guaranteed Energy Production or “GEP” has the meaning set forth in Section 3.1(e)(ii).

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Day-ahead System Energy Price means the System Energy Price resulting from the Day- ahead Energy Market.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Market Participant Energy Injection means transactions in the Day-ahead Energy Market and Real-time Energy Market, including but not limited to Day-ahead generation schedules, real- time generation output, Increment Offers, internal bilateral transactions and import transactions, as further described in the PJM Manuals.

  • Renewable energy project means (A) a project

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Electrical Distance means, for a Generation Capacity Resource geographically located outside the metered boundaries of the PJM Region, the measure of distance, based on impedance and in accordance with the PJM Manuals, from the Generation Capacity Resource to the PJM Region.

  • Cubic foot of gas means the amount of gas required to fill a cubic foot of space when the gas is at an absolute pressure of fourteen and seventy-three hundredths (14.73) pounds per square inch at a temperature of sixty (60) degrees Fahrenheit.

  • Energy project means the installation or modification of an energy efficiency improvement or the acquisition, installation, or improvement of a renewable energy system.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.

  • Cogeneration unit means a unit that is able to operate in cogeneration mode;

  • Basic generation service or "BGS" means electric generation

  • Generation Unit means a facility that converts a fuel or an energy resource into electrical energy.

  • Net energy metering means the difference between the kilowatt-hours consumed by a customer-generator and the kilowatt-hours generated by the customer- generator's facility over any time period determined as if measured by a single meter capable of registering the flow of electricity in two directions.

  • Electrical work Concealed and fire resistant wiring of “ISI” Copper Wire, Distribution board with “MCB”. “ISI” mark modular electrical accessories, Landline phone conduit, Cable TV wiring conduit, Separate line for inverter connection, Air-conditioner power point. Painting : Long Lasting and weather resistant acrylic paint to all external walls, All internal walls with white cement based putty finish with OBD. Plumbing & Sanitation : Sanitary ware for toilets, plumbing fixtures, CPVC/UPVC pipe and fitting(ISI make), SWR drainage system. Kitchen: Granite platform, ceramic tiles dado upto 2’ height, Stainless Steel sink in Kitchen, Aquaguard point, Connection for washing machine in wash area.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Working voltage means the highest value of an electrical circuit voltage root-mean-square (rms), specified by the manufacturer, which may occur between any conductive parts in open circuit conditions or under normal operating conditions. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively.

  • Heat unit means a unit of energy equal to the product of the peak kilovoltage, milliamperes, and seconds, i.e., kVp x mA x second.

  • Supply Pipe means any part of a service pipe which a water undertaker could not be, or have been required to lay under section 46 of the Water Industry Act 1991; and

  • Operating pressure means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.