Net irrigation requirement definition

Net irrigation requirement means the net irrigation requirement for 50% chance rainfall of the county that corresponds with the location of the authorized place of use of the base water right as provided in K.A.R. 5-5-12, on the effective date of this act.
Net irrigation requirement means the net irrigation

Examples of Net irrigation requirement in a sentence

  • Net irrigation requirement of major cropping patterns in northwest and southwest region of Bangladesh (as computed through CROPWAT with normal weather data) Cropping patterns Figure 6.

  • Net irrigation requirement is the amount of irrigation water needed to bring the soil moisture level in the effective root zone to field capacity.

  • Net irrigation requirement of the crop was calculated using the CROPWAT computer program based on Allen et al.

  • Soil physical characteristicsof study areaWhereGIR = Gross irrigation requirement (mm) NIR = Net irrigation requirement (mm) LR = Leaching requirement (fraction) Ea = Application efficiency (%)E.

  • Net irrigation requirement of major cropping patterns was calculated and shown in Table 7.

  • CWUE is the quantity of crop yield (Kg/ha) produced per unit depth (mm) of water used, as in [7].NIR = dnet – Pe – GW–∆SW (1)CWUE= Y(8)WhereWhereETcNIR = Net irrigation requirement, mm dnet = Net depth of water required, mm Pe = Effective precipitation, mmGW = Ground water recharge, mm∆SW = Change in soil water content, mmWater table of the experiment site is deep enough and vertical towards the crop root zone was assumed as negligible.

  • Table2.2 Experimental treatmentWhereNIR = Net irrigation requirement, mm dnet = Net depth of water required, mm Pe = Effective precipitation, mmGW = Ground water recharge, mmΔSW = Change in soil water content, mm Inflow time (T)In order to irrigate each furrow, the time of application was determined by using [7].

  • The following parameters were used to run CropWat software (Allen et al., 1998):ETc = Kc. ETOWhere: Kc = Crop coefficient, ETo = reference evapotranspiration Net irrigation requirement = ETc – effective rainfallGross irrigation requirement = Net irrigation req/application efficiencyEq(1)Irrigation water was conveyed into the plant directly using plastic pipe hence the application efficiency was 90%.

  • The gross irrigation requirement was obtained from the following equation: GIR= NIREa(3.14) where GIR= gross irrigation requirement (mm), NIR = Net irrigation requirement (mm), Ea = application efficiency (%).

  • The experimental site has the average field capacity (FC) of 29.3%and permanent wilting point (PWP) 21.6% in weight base.In= Net irrigation requirement Ea= Application efficiencyThe field water application efficiency for surface furrow irrigation is normally taken as (60%).The time required to deliver the desired depth of water in to each furrow was calculated using equationDap× w ×lThe average total available water (TAW) by volume percentage is also estimated as 106.26 mm/m.

Related to Net irrigation requirement

  • Storage Injection Requirements means all volumes required by the Seller for injection into underground storage, including cushion gas, and for liquification, including fuel used for injection and in liquification plants, or for such other storage projects that may be developed expressly for the protection of supply to high priority users.

  • Bid Submission Requirement means a task a Prospective Contractor must complete when submitting a bid response. These requirements will be distinguished by using the term “shall” or “must” in the requirement.

  • Certification Requirements means those requirements specified or referenced in this Agreement that you must meet in order to use and maintain the Certification Designation and use the Logo in accordance with the terms of this Agreement.

  • Risk Retention Requirements means the credit risk retention requirements of Section 15G of the Exchange Act (15 U.S.C. §78o-11), as added by Section 941 of the Xxxx-Xxxxx Xxxx Street Reform and Consumer Protection Act.

  • Design requirements means the written description of the infrastructure facility to be procured pursuant to this article, including:

  • Qualification Requirements means the qualification requirements as set forth in Section-2, Clause 2.1 of RFQ;

  • Minimum Participation Requirements means a set of minimum training, risk management, communication and capital or collateral requirements required for Participants in the PJM Markets, as set forth herein and in the Form of Annual Certification set forth as Tariff, Attachment Q, Appendix 1. Participants transacting in FTRs in certain circumstances will be required to demonstrate additional risk management procedures and controls as further set forth in the Annual Certification found in Tariff, Attachment Q, Appendix 1.

  • Day-ahead Scheduling Reserves Requirement means the sum of Base Day-ahead Scheduling Reserves Requirement and Additional Day-ahead Scheduling Reserves Requirement.

  • Margin Requirement means the amount of money that you are required to deposit with us as consideration for entering into a Trade and maintaining an Open Position.

  • Base Day-ahead Scheduling Reserves Requirement means the thirty-minute reserve requirement for the PJM Region established consistent with the Applicable Standards, plus any additional thirty-minute reserves scheduled in response to an RTO-wide Hot or Cold Weather Alert or other reasons for conservative operations. Base Load Generation Resource

  • Perfection Requirements means the making or procuring of filings, stampings, registrations, notarisations, endorsements, translations and/or notifications of any Finance Document (and/or any Security created under it) necessary for the validity, enforceability (as against the relevant Obligor or any relevant third party) and/or perfection of that Finance Document.

  • Data Protection Requirements means all applicable (i) Data Protection Laws, (ii) Privacy Policies and (iii) those terms of any Contracts imposing obligations on the Company or its Subsidiaries with respect to the Company’s collection, use, storage, disclosure, or cross-border transfer of Personal Data.

  • Additional Day-ahead Scheduling Reserves Requirement means the portion of the Day- ahead Scheduling Reserves Requirement that is required in addition to the Base Day-ahead Scheduling Reserves Requirement to ensure adequate resources are procured to meet real-time load and operational needs, as specified in the PJM Manuals.

  • PJM Region Reliability Requirement means, for purposes of the Base Residual Auction, the Forecast Pool Requirement multiplied by the Preliminary PJM Region Peak Load Forecast, less the sum of all Preliminary Unforced Capacity Obligations of FRR Entities in the PJM Region; and, for purposes of the Incremental Auctions, the Forecast Pool Requirement multiplied by the updated PJM Region Peak Load Forecast, less the sum of all updated Unforced Capacity Obligations of FRR Entities in the PJM Region.

  • MREL Requirement means the minimum requirement for own funds and eligible liabilities which is or, as the case may be, will be applicable to the Issuer;

  • Generation Interconnection Request means a request by a Generation Interconnection Customer pursuant to Tariff, Part IV, subpart A, to interconnect a generating unit with the Transmission System or to increase the capacity of a generating unit interconnected with the Transmission System in the PJM Region.

  • Medicaid Notification of Termination Requirements Any Contractor accessing payments for services under the Global Commitment to Health Waiver and Medicaid programs who terminates their practice will follow the Department of Vermont Health Access, Managed Care Organization enrollee notification requirements.

  • FILOT Act Minimum Investment Requirement means, with respect to the Project, an investment of at least $2,500,000 by the Company, or of at least $5,000,000 by the Company and any Sponsor Affiliates in the aggregate, in Economic Development Property.

  • Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.

  • Interconnection Request means a Generation Interconnection Request, a Transmission Interconnection Request and/or an IDR Transfer Agreement.

  • Mandatory City Requirements means those City laws set forth in the San Francisco Municipal Code, including the duly authorized rules, regulations, and guidelines implementing such laws that impose specific duties and obligations upon Contractor.

  • Reporting Requirement By January 31, 2017, the District will provide for OCR’s review and approval the Web Accessibility Policy drafted consistent with Item 1.

  • Minimum Balance Requirements You must maintain a minimum daily balance of $2,000.00 in your Money Market Savings account to obtain the disclosed annual percentage yield. We impose a monthly maintenance fee if the balance falls below $500 any day of the month. Basic Checking Account Rate Information: This account does not pay interest.

  • Surplus Interconnection Request means a request submitted by a Surplus Interconnection Customer, pursuant to Tariff, Attachment RR, to utilize Surplus Interconnection Service within the Transmission System in the PJM Region. A Surplus Interconnection Request is not a New Service Request.

  • Contract Minimum Investment Requirement means, with respect to the Project, investment by the Company and any Sponsor Affiliates of at least $10,000,000 in Economic Development Property subject (non-exempt) to ad valorem taxation (in the absence of this Fee Agreement).

  • Minimum Capital Requirement means the Minimum Capital Requirement, the minimum group Solvency Capital Requirement or other minimum capital requirements (as applicable) referred to in the Relevant Rules;