Examples of NCLL in a sentence
A course may have up to two perspectives designations; however, no one course can be used by a student to satisfy more than one perspectives requirement.
SPP will utilize Table 1 from the NERC Standard TPL-001 as the basis for the contingencies to be assessed during the study.Contingencies that do not allow for non-consequential load loss (NCLL) or the interruption of firm transmission service (IFTS) will be analyzed during the reliability needs assessment.
NCLL participants and the team manager need to notify the NCLL Safety Officer if they become sick with symptoms of COVID-19.
Some planning events allow/disallow NCLL or IFTS based upon the voltage level of the contingent element.be utilized during the needs assessment to identify potential Order 890 needs.
It will be good for the whole academic year 2022 - 2023 I, the undersigned, know that programs/events offered by Northern Center for Lifelong Learning (NCLL) carry possible risk of personal injury and/or other illness.
Table 3: NERC Standard TPL-001 Planning Events as Monitored and Contingent Elements The base reliability models will be analyzed with the remaining contingencies from Table 1 in the NERC Standard TPL-001 that do not allow for NCLL or IFTS as detailed in Table 4.
P0, P1, P2.1Monitored ElementContingent ElementTable 5: NERC Standard TPL-001 Planning Events as Monitored and Contingent Elements The remaining contingencies in Table 1 of the NERC Standard TPL-001 that do not allow for NCLL or IFTS will be analyzed if a violation was observed in the same year/season of the base reliability model as detailed in Table 6.
Table 2: NERC Standard TPL-001 Planning Events as Monitored and Contingent Elements The base reliability models will be analyzed with the remaining contingencies from Table 1 in the NERC Standard TPL-001 that do not allow for NCLL or IFTS as detailed in Table 3.
I understand it is my responsibility to come prepared for the type of event(s) for which I am participating, which I understand may involve strenuous activity.I also give permission for any photos taken of me during this activity to be used by NCLL for promotion purposes.
P0, P1, P2.1Monitored ElementContingent ElementTable 4: NERC Standard TPL-001 Planning Events as Monitored and Contingent Elements The remaining contingencies in Table 1 of the NERC Standard TPL-001 that do not allow for NCLL or IFTS will be analyzed if a violation was observed in the same year/season of the base reliability model as detailed in Table 5.