{"component": "definition", "props": {"groups": [{"size": 6, "samples": [{"hash": "gGNk1EpuQzS", "uri": "/contracts/gGNk1EpuQzS#mechanically-complete", "label": "Solar Power Purchase Agreement", "score": 26.8678886712, "published": true}, {"hash": "fX7Zt1V2an4", "uri": "/contracts/fX7Zt1V2an4#mechanically-complete", "label": "Solar Power Purchase Agreement", "score": 26.8678886712, "published": true}, {"hash": "2TJdmIzfffI", "uri": "/contracts/2TJdmIzfffI#mechanically-complete", "label": "Solar Power Purchase Agreement", "score": 26.8678886712, "published": true}], "snippet": "means (i) DC wiring and panel stringing for the System is fully installed; and", "snippet_links": [{"key": "the-system", "type": "clause", "offset": [44, 54]}], "hash": "ffc93c6e9a190637bb21d7b361160aa1", "id": 1}, {"size": 5, "samples": [{"hash": "ldg8AjDAbNS", "uri": "/contracts/ldg8AjDAbNS#mechanically-complete", "label": "Construction Agreement (LSB Industries Inc)", "score": 24.8631074606, "published": true}, {"hash": "60sQPjdcJL5", "uri": "/contracts/60sQPjdcJL5#mechanically-complete", "label": "Construction Agreement (LSB Industries Inc)", "score": 24.8631074606, "published": true}], "snippet": "means the achievement of the following: Acceptance in writing by Owner of a certificate issued by Contractor certifying that i) the physical completion of the Work relating to the Project in accordance with the terms of this Agreement such that the Work is ready to undergo Start-Up, including, setting of the applicable equipment on foundations; connecting such equipment to other applicable equipment with piping, wiring, controls, and safety systems; ensuring that such equipment and such related operating systems are, as applicable, individually cleaned, pressure tested, leak checked, lubricated, and point-to-point checked to verify that such equipment and such related operating systems have been correctly installed so as to respond to simulated test signals equivalent to actual signals received during operation; and ensuring that such equipment and related operating systems are ready for initial operation, adjustment and testing and may be so operated, adjusted and tested without damage thereto or to any other property and without injury to any person; ii) compliance of the Work and the Project with the agreed to standards where applicable; and iii) completion of the Work so that commissioning of the plant or the applicable portion of the facility may commence. Should Owner achieve 72 hours continuous operation of the Facility at full designed capacity, or less if reduction is not caused by Work of Contractor, then the Facility shall be deemed to be Mechanically Complete.", "snippet_links": [{"key": "in-writing", "type": "definition", "offset": [51, 61]}, {"key": "by-owner", "type": "definition", "offset": [62, 70]}, {"key": "by-contractor", "type": "clause", "offset": [95, 108]}, {"key": "completion-of-the-work", "type": "definition", "offset": [141, 163]}, {"key": "relating-to-the-project", "type": "clause", "offset": [164, 187]}, {"key": "in-accordance-with", "type": "definition", "offset": [188, 206]}, {"key": "terms-of-this-agreement", "type": "clause", "offset": [211, 234]}, {"key": "ready-to", "type": "clause", "offset": [257, 265]}, {"key": "the-applicable", "type": "clause", "offset": [306, 320]}, {"key": "other-applicable", "type": "definition", "offset": [376, 392]}, {"key": "safety-systems", "type": "clause", "offset": [438, 452]}, {"key": "operating-systems", "type": "clause", "offset": [500, 517]}, {"key": "to-verify", "type": "definition", "offset": [630, 639]}, {"key": "respond-to", "type": "clause", "offset": [734, 744]}, {"key": "during-operation", "type": "clause", "offset": [806, 822]}, {"key": "initial-operation", "type": "definition", "offset": [901, 918]}, {"key": "other-property", "type": "clause", "offset": [1020, 1034]}, {"key": "injury-to-any-person", "type": "clause", "offset": [1047, 1067]}, {"key": "the-work-and-the-project", "type": "clause", "offset": [1087, 1111]}, {"key": "agreed-to", "type": "definition", "offset": [1121, 1130]}, {"key": "where-applicable", "type": "clause", "offset": [1141, 1157]}, {"key": "the-plant", "type": "clause", "offset": [1216, 1225]}, {"key": "applicable-portion", "type": "definition", "offset": [1233, 1251]}, {"key": "operation-of-the-facility", "type": "clause", "offset": [1323, 1348]}, {"key": "designed-capacity", "type": "definition", "offset": [1357, 1374]}, {"key": "caused-by", "type": "clause", "offset": [1404, 1413]}, {"key": "work-of-contractor", "type": "clause", "offset": [1414, 1432]}, {"key": "facility-shall", "type": "clause", "offset": [1443, 1457]}], "hash": "04ed8579a26bbcca4ac47ac71565efc5", "id": 2}, {"size": 3, "samples": [{"hash": "anwg0jx4nPG", "uri": "/contracts/anwg0jx4nPG#mechanically-complete", "label": "Project Agreement", "score": 19.9335247171, "published": true}, {"hash": "hiq7H8QSE9u", "uri": "/contracts/hiq7H8QSE9u#mechanically-complete", "label": "Project Agreement", "score": 19.0, "published": true}, {"hash": "glylhPzQaV5", "uri": "https://www.durhamyorkwaste.ca/Archive/pdfs/study/ea-study-docs/studydoc-july31/EA_in_Sections/Appendix-B/B3-RFP/4-RFP-Project-Agreement-Revised-Dec5-2008/1-Final-Draft-Project-Agreement.pdf", "label": "Project Agreement", "score": 9.0, "published": false}], "snippet": "means that the Facility or any Area thereof is mechanically complete and ready for Commissioning.", "snippet_links": [{"key": "the-facility", "type": "definition", "offset": [11, 23]}, {"key": "any-area", "type": "definition", "offset": [27, 35]}], "hash": "ab1d0ae17d4a8bb2aaf87165d78b87eb", "id": 3}, {"size": 2, "samples": [{"hash": "c7lQis1LsnA", "uri": "/contracts/c7lQis1LsnA#mechanically-complete", "label": "Standard Terms and Conditions for Supply of Goods and Services", "score": 32.9537801008, "published": true}, {"hash": "gaZoYxGEVx", "uri": "/contracts/gaZoYxGEVx#mechanically-complete", "label": "Bevcorp Standard Terms and Conditions for Supply of Goods and Services", "score": 25.7748117728, "published": true}], "snippet": "means the installation and completion of all items for which Bevcorp is listed as the responsible party in the Responsibilities section of the Bevcorp\u2019s proposal. Completion of these items shall make the Equipment ready for mechanical start up, less any work for which other parties are responsible.", "snippet_links": [{"key": "the-installation", "type": "clause", "offset": [6, 22]}, {"key": "completion-of", "type": "definition", "offset": [27, 40]}, {"key": "all-items", "type": "definition", "offset": [41, 50]}, {"key": "responsible-party", "type": "definition", "offset": [86, 103]}, {"key": "the-responsibilities", "type": "clause", "offset": [107, 127]}, {"key": "the-equipment", "type": "clause", "offset": [200, 213]}, {"key": "work-for", "type": "definition", "offset": [254, 262]}, {"key": "parties-are", "type": "clause", "offset": [275, 286]}], "hash": "98bd21560d69a76fa16d14e5c2564c6f", "id": 4}, {"size": 2, "samples": [{"hash": "9683JHvgH29", "uri": "/contracts/9683JHvgH29#mechanically-complete", "label": "Engineering, Procurement, and Construction Services Agreement (Cheniere Energy Inc)", "score": 21.0, "published": true}, {"hash": "8yCdoQSHj3E", "uri": "/contracts/8yCdoQSHj3E#mechanically-complete", "label": "Engineering, Procurement, and Construction Services Agreement (Cheniere Energy Inc)", "score": 21.0, "published": true}], "snippet": "means that all of the following has occurred: (a) the Work is approved by Cheniere as being ready for pre-commissioning and/or commissioning; (b) Willbros has delivered to Cheniere a set of original test and inspection certificates, including hydrostatic test reports, materials documentation, MAOP establishment records, and internal geometry pig results; (c) Willbros has completed all construction, procurement, fabrication, assembly, erection, installation and testing, including final pipeline hydrostatic tests for the pipeline and all appropriate appurtenances to ensure that such systems were correctly constructed, procured, fabricated, assembled, erected, installed and tested and are capable of being operated safely and reliably within the requirements contained in this Agreement; (d) Willbros has delivered to Cheniere a Mechanical Completion Certificate for the Project in the form of Attachment III, and Cheniere has accepted such certificate by signing such certificate; (e) Willbros has dewatered and dried the pipeline to a dewpoint of negative forty degrees Fahrenheit (-40\u00baF); (f) Willbros has completed all Exception Items in accordance with Paragraph 8.1; and (g) Willbros has performed all other obligations required under this Agreement for Mechanical Completion.", "snippet_links": [{"key": "the-work", "type": "clause", "offset": [50, 58]}, {"key": "approved-by", "type": "definition", "offset": [62, 73]}, {"key": "inspection-certificates", "type": "clause", "offset": [208, 231]}, {"key": "test-reports", "type": "definition", "offset": [255, 267]}, {"key": "all-construction", "type": "definition", "offset": [384, 400]}, {"key": "installation-and-testing", "type": "clause", "offset": [448, 472]}, {"key": "hydrostatic-tests", "type": "clause", "offset": [499, 516]}, {"key": "to-ensure", "type": "clause", "offset": [568, 577]}, {"key": "capable-of", "type": "definition", "offset": [695, 705]}, {"key": "the-requirements", "type": "clause", "offset": [748, 764]}, {"key": "in-this-agreement", "type": "definition", "offset": [775, 792]}, {"key": "completion-certificate-for-the-project", "type": "clause", "offset": [846, 884]}, {"key": "form-of", "type": "definition", "offset": [892, 899]}, {"key": "attachment-iii", "type": "clause", "offset": [900, 914]}, {"key": "by-signing", "type": "clause", "offset": [959, 969]}, {"key": "exception-items", "type": "clause", "offset": [1129, 1144]}, {"key": "in-accordance-with", "type": "definition", "offset": [1145, 1163]}, {"key": "other-obligations", "type": "definition", "offset": [1214, 1231]}, {"key": "agreement-for", "type": "clause", "offset": [1252, 1265]}], "hash": "402a8e9db608c9dfe4dc6fc412d280e7", "id": 5}, {"size": 2, "samples": [{"hash": "l6bbT9snr3K", "uri": "/contracts/l6bbT9snr3K#mechanically-complete", "label": "Contract for Purchase (Tenaska Georgia Partners Lp)", "score": 18.0, "published": true}, {"hash": "9CWDIqeNfZ2", "uri": "/contracts/9CWDIqeNfZ2#mechanically-complete", "label": "Contract for Purchase (Tenaska Georgia Partners Lp)", "score": 18.0, "published": true}], "snippet": "means that installation of a Unit is complete and such Unit and all necessary auxiliary systems (including any balance of plant issues such as gas supply) are ready for first fire.", "snippet_links": [{"key": "installation-of", "type": "clause", "offset": [11, 26]}, {"key": "a-unit", "type": "definition", "offset": [27, 33]}, {"key": "such-unit", "type": "definition", "offset": [50, 59]}, {"key": "balance-of-plant", "type": "clause", "offset": [111, 127]}, {"key": "gas-supply", "type": "clause", "offset": [143, 153]}, {"key": "ready-for-first-fire", "type": "definition", "offset": [159, 179]}], "hash": "9c0da0fdde37ef78dcb863f0fdbfc736", "id": 6}, {"size": 2, "samples": [{"hash": "hf5alolVBq", "uri": "/contracts/hf5alolVBq#mechanically-complete", "label": "Master Memorandum of Understanding", "score": 26.9637049911, "published": true}, {"hash": "8uZ4NS1AIRG", "uri": "https://www.town.buckland.ma.us/sites/g/files/vyhlif356/f/events/tareport_020921.pdf", "label": "www.town.buckland.ma.us", "score": 10.5441478439, "published": false}], "snippet": "means that the System (i) has been installed at the Premises, all the direct current components of the System are mechanically and electrically complete, and the System is ready to commence start-up, testing, commissioning and operations once the Utility work and alternating current components of the System are completed or (ii) satisfies requirements under the SMART Program to be considered mechanically complete.", "snippet_links": [{"key": "the-system", "type": "clause", "offset": [11, 21]}, {"key": "the-premises", "type": "clause", "offset": [48, 60]}, {"key": "direct-current", "type": "definition", "offset": [70, 84]}, {"key": "ready-to", "type": "clause", "offset": [172, 180]}, {"key": "work-and", "type": "clause", "offset": [255, 263]}, {"key": "alternating-current", "type": "definition", "offset": [264, 283]}, {"key": "smart-program", "type": "definition", "offset": [364, 377]}, {"key": "to-be-considered", "type": "clause", "offset": [378, 394]}], "hash": "599b8fbe8b0e17253a95e73974380dba", "id": 7}, {"size": 2, "samples": [{"hash": "4h1IUduCIz0", "uri": "/contracts/4h1IUduCIz0#mechanically-complete", "label": "Procurement and Construction Contract", "score": 27.2992386334, "published": true}, {"hash": "iKH0faXGPCJ", "uri": "/contracts/iKH0faXGPCJ#mechanically-complete", "label": "Procurement and Construction Contract", "score": 24.0718685832, "published": true}], "snippet": "mean, with respect to a SGF, when (i) Contractor has completed the design, engineering, procurement, and construction activities of this Agreement for such SGF, excluding Interconnection Approval, successful completion of performance testing and the successful completion of Punch List Items and the delivery or performance of any documents or any other items of Work or obligations that are not required to be delivered or performed until, as applicable, Substantial Completion or Final Completion, and (ii) has performed the installation checklist and acceptance tests as set out in Attachment IX.", "snippet_links": [{"key": "with-respect-to", "type": "clause", "offset": [6, 21]}, {"key": "the-design", "type": "clause", "offset": [63, 73]}, {"key": "construction-activities", "type": "definition", "offset": [105, 128]}, {"key": "agreement-for", "type": "clause", "offset": [137, 150]}, {"key": "performance-testing", "type": "definition", "offset": [222, 241]}, {"key": "the-successful", "type": "clause", "offset": [246, 260]}, {"key": "completion-of-punch-list-items", "type": "clause", "offset": [261, 291]}, {"key": "delivery-or-performance", "type": "clause", "offset": [300, 323]}, {"key": "other-items", "type": "clause", "offset": [348, 359]}, {"key": "of-work", "type": "clause", "offset": [360, 367]}, {"key": "not-required", "type": "clause", "offset": [392, 404]}, {"key": "substantial-completion", "type": "clause", "offset": [456, 478]}, {"key": "final-completion", "type": "clause", "offset": [482, 498]}, {"key": "the-installation", "type": "clause", "offset": [523, 539]}, {"key": "acceptance-tests", "type": "clause", "offset": [554, 570]}, {"key": "set-out", "type": "definition", "offset": [574, 581]}], "hash": "2d0352acd742cbd75dc82a34528ff33b", "id": 8}, {"size": 2, "samples": [{"hash": "iKYMG5xbSq7", "uri": "/contracts/iKYMG5xbSq7#mechanically-complete", "label": "Credit Agreement (Calpine Corp)", "score": 18.0, "published": true}], "snippet": "substantially complete\" or \"complete\" (however defined therein), in each case without the approval of Administrative Agent acting in consultation with the Independent Engineer, or use the proceeds of any Loan to make any payment under any Construction Contract all or any portion of which payment the Independent Engineer has given the applicable Project Company written notice (prior to the due date thereof) that it disputes is then due, without the written approval of Administrative Agent acting in consultation with the Independent Engineer, which approval, if given, shall not be unreasonably delayed or withheld, taking into account applicable time limitations imposed by the terms of the applicable Project Document.", "snippet_links": [{"key": "substantially-complete", "type": "definition", "offset": [0, 22]}, {"key": "each-case", "type": "definition", "offset": [68, 77]}, {"key": "approval-of", "type": "definition", "offset": [90, 101]}, {"key": "administrative-agent", "type": "definition", "offset": [102, 122]}, {"key": "in-consultation-with", "type": "definition", "offset": [130, 150]}, {"key": "the-independent-engineer", "type": "clause", "offset": [151, 175]}, {"key": "any-loan", "type": "clause", "offset": [200, 208]}, {"key": "construction-contract", "type": "definition", "offset": [239, 260]}, {"key": "project-company", "type": "definition", "offset": [347, 362]}, {"key": "written-notice", "type": "definition", "offset": [363, 377]}, {"key": "prior-to-the", "type": "clause", "offset": [379, 391]}, {"key": "due-date", "type": "definition", "offset": [392, 400]}, {"key": "written-approval", "type": "definition", "offset": [452, 468]}, {"key": "time-limitations", "type": "definition", "offset": [651, 667]}, {"key": "terms-of-the", "type": "clause", "offset": [683, 695]}, {"key": "project-document", "type": "clause", "offset": [707, 723]}], "hash": "4bcc6d71c0b82bea566ef6a130b81fad", "id": 9}, {"size": 1, "samples": [{"hash": "h85VFTOHU2J", "uri": "https://nj.gov/bpu/pdf/rules/solar/Community_Solar_All_Written_Comments_November_2018.pdf", "label": "nj.gov", "score": 6.1389459274, "published": false}], "snippet": "means the physical completion of the developer portion of the project as evidenced by either Certificate of Completion signed by wiring inspection, or an affidavit signed by the Engineer of Record.", "snippet_links": [{"key": "of-the-developer", "type": "clause", "offset": [30, 46]}, {"key": "the-project", "type": "definition", "offset": [58, 69]}, {"key": "certificate-of-completion", "type": "definition", "offset": [93, 118]}, {"key": "an-affidavit", "type": "clause", "offset": [151, 163]}, {"key": "engineer-of-record", "type": "clause", "offset": [178, 196]}], "hash": "d5bcd2f92356aed11e119a9e56e8f9c9", "id": 10}], "next_curs": "CmISXGoVc35sYXdpbnNpZGVyY29udHJhY3Rzcj4LEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIebWVjaGFuaWNhbGx5LWNvbXBsZXRlIzAwMDAwMDBhDKIBAmVuGAAgAA==", "definition": {"title": "Mechanically Complete", "size": 30, "snippet": "means (i) DC wiring and panel stringing for the System is fully installed; and", "id": "mechanically-complete", "examples": ["Owner shall notify Contractor whether it accepts or rejects the Work as being <strong>Mechanically Complete</strong> within seven (7) Days following Owner\u2019s receipt of Contractor\u2019s certification in accordance with this Section.", "Once Owner and Authority Construction Monitor determine that the Work is <strong>Mechanically Complete</strong>, Owner shall deliver a Mechanical Completion Certificate to Contractor, which shall be deemed to have been delivered by Owner on the date that the applicable Application for Mechanical Completion was issued by Contractor.", "You must notify Us not later than 13 months from the date when such Transaction affected Your Available Balance on the Card.", "If Exception Items remain unfinished or uncorrected, the foregoing procedure shall be repeated until the Work is <strong>Mechanically Complete</strong>.", "Within seven (7) days after receipt of such notice, Cheniere shall either accept the Work as being <strong>Mechanically Complete</strong> in the manner set forth above, or notify Willbros in writing of still unfinished or uncorrected Exception Items.", "Within twenty (20) days after receipt of Notice from Owner that the Work is not <strong>Mechanically Complete</strong>, or within a reasonable time if such non-compliance cannot be remedied within twenty (20) days, Contractor will promptly complete any incomplete items and remedy defective items, after which Contractor shall submit a revised Application for Mechanical Completion.", "Contractor shall furnish and deliver to Owner a nitric acid plant, fully constructed, <strong>Mechanically Complete</strong> and ready for operation, with all ISBL associated and ancillary work and connections, and shall also include start-up and commissioning support, all in compliance with Exhibit A.", "EPC Contractor shall furnish and deliver to Owner the 599-OSBL Work, fully constructed, <strong>Mechanically Complete</strong> and ready for operation, and shall also include start-up and commissioning support, maintenance and operations documentation and any and all design documentation in compliance Exhibit A.", "Within seven (7) days after receipt of such notice Cheniere shall inspect the Work and either accept the Work as being <strong>Mechanically Complete</strong> (which acceptance shall be evidenced by Cheniere\u2019s signature on such Mechanical Completion Certificate), or specify the Exception Items which must be completed to achieve Mechanical Completion in a written notice to Willbros.", "With respect to each SGF, when Contractor considers the Work with respect to the SGF to be <strong>Mechanically Complete</strong> in accordance with the Contract Documents, and when Contractor has received the construction permit certificate of acceptance from the construction permitting authority, then Contractor shall issue to Owner and Authority Construction Monitor an Application for Mechanical Completion for such SGF."], "related": [["substantially-complete", "Substantially Complete", "Substantially Complete"], ["substantially-completed", "Substantially Completed", "Substantially Completed"], ["mechanical-completion", "Mechanical Completion", "Mechanical Completion"], ["ready-for-occupancy", "Ready for Occupancy", "Ready for Occupancy"], ["substantial-completion", "Substantial Completion", "Substantial Completion"]], "related_snippets": [], "updated": "2025-07-06T21:58:41+00:00"}, "json": true, "cursor": ""}}