Maximum Run Time means the maximum number of hours a generating unit can run over the course of an Operating Day, as measured by PJM’s State Estimator.
Maximum Run Time means the maximum time that the Flexible MW can be delivered continuously from a Flexible Unit per Service Window as specified in Schedule Two;
Maximum Run Time means the maximum number of hours a generating unit can run over

Examples of Maximum Run Time in a sentence

  • DSO Contracted Service Maximum Run Time [XXXX] minutes duration, being the maximum time between the Requested Start Time and Requested End Time, within the Service Window.

  • Minimum Charge Time, Maximum Charge Time, Minimum Run Time, and Maximum Run Time 217.

  • An Offer shall include a Maximum Run Time, expressed for each Day in Hours.

  • Those physical and operating characteristics are as follows: (1) State of Charge, (2) Maximum State of Charge, (3) Minimum State of Charge, (4) Maximum Charge Limit, (5) Maximum Discharge Limit, (6) Minimum Charge Time, (7) Maximum Charge Time, (8) Minimum Run Time, (9) Maximum Run Time, (10) Minimum Discharge Limit, (11) Minimum Charge Limit, (12) Discharge Ramp Rate, and(13) Charge Ramp Rate.

  • As ISO-NE explains, its software does not contain a Maximum Run Time parameter.

  • Maximum Run Time Parameter for DRPlease provide your organization’s feedback on the ISO’s presentation on the maximum run time parameter for DR topic.

  • Please explain how PJM’s proposed participation model accounts for Minimum State of Charge, Maximum State of Charge, Minimum Charge Time, Maximum Charge Time, Minimum Run Time, and Maximum Run Time.

  • Maximum Run Time (hour) - The maximum number of hours a unit can run over the course of an operating day as measured by PJM’s state estimator.

  • The Maximum Run Time of the FU can be less than the Service Window.

  • The Flexible MW shall be sustainable for at least 30 minutes, and up to the tendered Maximum Run Time.

Related to Maximum Run Time

  • Minimum Run Time For all generating units that are not combined cycle units, “Minimum Run Time” shall mean the minimum number of hours a unit must run, in real-time operations, from the time after generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, to the time of generator breaker opening, as measured by PJM's State Estimator. For combined cycle units, “Minimum Run Time” shall mean the time period after the first combustion turbine generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, and the last generator breaker opening as measured by PJM’s State Estimator.

  • Maximum Weekly Starts means the maximum number of times that a generating unit can be started in one week, defined as the 168 hour period starting Monday 0001 hour, under normal operating conditions. Member:

  • Maximum Daily Starts means the maximum number of times that a generating unit can be started in an Operating Day under normal operating conditions.