Maverik Center Project definition

Maverik Center Project means the refinancing of that certain sports and events arena currently known as the Maverik Center and the Authority’s interest in the Maverik Center Ground Lease Site for lease to the City.

Related to Maverik Center Project

  • Infrastructure project means any construction or acquisition of treatment works,

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Major project means a project comprising of a series of works, activities or services which is intended, in itself, to accomplish a definite and indivisible task of a precise economic or technical nature, which has clearly identified goals and whose total cost exceeds that which is specified in the Framework Agreement;

  • Power Project or “Project” shall mean the Solar power generation facility of Contracted Capacity of ………..[Insert capacity] MW, located at [Insert name of the place] in …. [Insert name of the District and State] having a separate control system, metering and separate points of injection into the grid at Delivery/Interconnection/Metering point at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • The Works/Project means the works to be executed or done under this contract.

  • Project site, where applicable, means the place indicated in bidding documents.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Mixed-use project means a project comprising both a qualified

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • apartment building means a residential use building, or the residential use portion of a mixed-use building, other than a townhouse or stacked townhouse containing four or more dwelling units each of which shall have access to above grade common halls, stairs, elevators, and yards;

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • New Project means (a) each facility or operating location which is either a new facility, location or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, location or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • The Project means supply, installation, testing and commissioning, integration of computer hardware and services with support under Warranty and annual maintenance contract, if required for the contract period.

  • Project Equipment means the items of machinery, equipment or other personal property used in connection with the construction and development of the Project pursuant to the provisions hereof, and all replacements thereof and substitutions therefor made pursuant to this Agreement.

  • Existing Project is a Project that has achieved Commercial Operation on or prior to the Execution Date.