Marmaton River Project definition

Marmaton River Project means the existing land and production facility (including gathering system, water source well, and water disposal well) owned and operated by MegaWest in the Marmaton area of Missouri, capable of producing roughly 500 barrels per day and currently comprised of an initial phase, made up of 13 steam injection wxxxx and 40 production wxxxx, all of which are fully equipped and tied in, and a secondary phase, made up of 10 steam injection wxxxx and 24 production wxxxx, all of which have been drilled but which are not yet completed or tied in;
Marmaton River Project means the existing land and production project (including gathering system, water source well, and water disposal well, injection xxxxx, steam injection equipment, tanks and associated equipment and materials) in the Marmaton area of Missouri, currently comprised of an Initial Phase, made up of 13 steam injection xxxxx and 40 production xxxxx, all of which are fully equipped and tied in, and a Subsequent Phase, made up of 10 steam injection xxxxx and 24 production xxxxx, all of which have been drilled but which are not yet completed or tied in. The Project Area for the Marmaton River Project is that portion of the NE1/4 Section 7 south of Highway 54 (containing 121 acres, more or less); the N1/2 SE Section 7 (containing 80 acres, more or less) the easternmost 30 acres in the SESE Section 7; and that portion of the NWNW Section 8 south of Highway 54 (containing 25 acres, more or less), all in Xxxxxxxx 00X, Xxxxx 00X, Xxxxxx Xxxxxx, Missouri. OPERATING AGREEMENT

Related to Marmaton River Project

  • Power Project or “Project” shall mean the Solar power generation facility of Contracted Capacity of ………..[Insert capacity] MW, located at [Insert name of the place] in …. [Insert name of the District and State] having a separate control system, metering and separate points of injection into the grid at Delivery/Interconnection/Metering point at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;

  • Infrastructure project means any construction or acquisition of treatment works,

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • apartment building means a residential use building, or the residential use portion of a mixed-use building, other than a townhouse or stacked townhouse containing four or more dwelling units each of which shall have access to above grade common halls, stairs, elevators, and yards;

  • Green infrastructure means a stormwater management measure that manages stormwater close to its source by:

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Redevelopment project means a specific construction project

  • Greywater means all liquid wastes from showers, baths, sinks, kitchens and domestic washing facilities, but does not include toilet wastes;

  • Property Owners association" or "association" means an incorporated or unincorporated entity upon which responsibilities are imposed and to which authority is granted in the declaration.

  • The Works/Project means the works to be executed or done under this contract.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Historic building means a building, including its structural components, that is located in this state and that is either individually listed on the national register of historic places under 16 U.S.C. 470a, located in a registered historic district, and certified by the state historic preservation officer as being of historic significance to the district, or is individually listed as an historic landmark designated by a local government certified under 16 U.S.C. 470a(c).

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Environmental Infrastructure Facilities means Wastewater Treatment Facilities, Stormwater Management Facilities or Water Supply Facilities (as such terms are defined in the Regulations).

  • Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Project Companies means all Group Project Companies and Non-Group Project Companies together, each being a “Project Company”.

  • Urban renewal project means undertakings and activities of a municipality in an urban renewal area for the elimination and for the prevention of the development or spread of slums and blight, and may involve slum clearance and redevelopment in an urban renewal area, or rehabilitation or conservation in an urban renewal area, or any combination or part of them in accordance with an urban renewal plan. These undertakings and activities may include:

  • Airside means, generally, those areas of an Airport which requires a person to pass through a security checkpoint to access. References to "sterile areas" generally mean Airside areas within terminal buildings. References to "Airfield", "Aircraft Operations Area", "AOA", or "Secured areas" generally mean outdoor Airside areas or areas not accessible to passengers.

  • Generating Facilities means Interconnection Customer’s device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities. Generation Interconnection Customer:

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.