{"component": "definition", "props": {"groups": [{"snippet": "means the costs incurred by an Attacher associated with the transfer of the facilities, antenna, lines or equipment of a Pre-Existing Third Party User, undertaken by an Attacher to enable attachment to the utility pole or similar structure. Make-Ready Costs that are to be paid by an Attacher include, without limitation, all costs and expenses to relocate or alter the attachments or facilities of any Pre-Existing Third Party User as may be necessary to accommodate an Attacher\u2019s attachment.", "samples": [{"hash": "aWpiwJum8II", "uri": "http://www.legis.state.wv.us/Bulletin_Board/2021/rs/h_journal/hdj2021-03-02-21.pdf", "label": "www.legis.state.wv.us", "score": 15.8555295585, "published": false}, {"hash": "1jXluugLGhY", "uri": "http://www.legis.state.wv.us/Bill_Text_HTML/2021_SESSIONS/RS/bills/HB2002%20SUB%20ENG.docx", "label": "www.legis.state.wv.us", "score": 15.8525732596, "published": false}, {"hash": "PEo6FnDTFd", "uri": "http://www.wvlegislature.gov/Bill_Text_HTML/2021_SESSIONS/RS/bills/HB2002%20SUB%20ENG2.docx", "label": "www.wvlegislature.gov", "score": 10.5838466804, "published": false}], "size": 8, "snippet_links": [{"key": "costs-incurred", "type": "definition", "offset": [10, 24]}, {"key": "associated-with", "type": "definition", "offset": [40, 55]}, {"key": "the-facilities", "type": "clause", "offset": [72, 86]}, {"key": "third-party-user", "type": "definition", "offset": [134, 150]}, {"key": "utility-pole", "type": "definition", "offset": [206, 218]}, {"key": "without-limitation", "type": "clause", "offset": [302, 320]}, {"key": "costs-and-expenses", "type": "definition", "offset": [326, 344]}], "hash": "85e2ff302ea8722a61b14112a9207b2c", "id": 1}, {"snippet": "means the costs incurred by an Attacher associated with the", "samples": [{"hash": "eJ9b7PgbM2k", "uri": "https://www.wvlegislature.gov/Bill_Text_HTML/2022_SESSIONS/RS/bills/SB231%20INTR.pdf", "label": "www.wvlegislature.gov", "score": 9.0342231348, "published": false}, {"hash": "51gxnPkJPwe", "uri": "https://www.wvlegislature.gov/Bill_Text_HTML/2021_SESSIONS/RS/bills/HB2002%20SUB%20ENG2.pdf", "label": "www.wvlegislature.gov", "score": 8.5838466804, "published": false}, {"hash": "ienV7CGd8kY", "uri": "http://www.legis.state.wv.us/Bill_Text_HTML/2021_SESSIONS/RS/bills/HB2002%20INTR.pdf", "label": "www.legis.state.wv.us", "score": 8.5550992471, "published": false}], "size": 7, "snippet_links": [{"key": "costs-incurred", "type": "definition", "offset": [10, 24]}, {"key": "associated-with", "type": "definition", "offset": [40, 55]}], "hash": "0847e0f4e04592a6db7c99fe9b8758e2", "id": 2}, {"snippet": "means the costs incurred by the Company or joint users for the accommodation of the Telecom Operator\u2019s facilities. Such costs include, but are not limited to, replacing particular poles with taller or stronger poles where required, the cost of rearranging the Company\u2019s or joint users\u2019 existing plant on the pole; also the costs of engineering, necessary tree trimming, inspection, and the cost of bonding and grounding the Telecom Operators\u2019 facilities to plant of the Company or of joint users.", "samples": [{"hash": "2NB2VOuECai", "uri": "https://www.eversource.com/content/docs/default-source/rates-tariffs/telecom-pole-attach-wired.pdf", "label": "www.eversource.com", "score": 9.0020533881, "published": false}, {"hash": "epTcArYlsNz", "uri": "https://www.eversource.com/content/docs/default-source/rates-tariffs/municipal-pole-attach.pdf", "label": "www.eversource.com", "score": 9.0020533881, "published": false}, {"hash": "6f2MX3Ph2Cj", "uri": "https://www.eversource.com/content/docs/default-source/rates-tariffs/ct-electric/telecom-pole-attach-wired.pdf?sfvrsn=399afe62_12", "label": "www.eversource.com", "score": 9.0020533881, "published": false}], "size": 6, "snippet_links": [{"key": "costs-incurred", "type": "definition", "offset": [10, 24]}, {"key": "by-the-company", "type": "clause", "offset": [25, 39]}, {"key": "the-accommodation", "type": "definition", "offset": [59, 76]}, {"key": "telecom-operator", "type": "definition", "offset": [84, 100]}, {"key": "not-limited", "type": "clause", "offset": [143, 154]}, {"key": "where-required", "type": "clause", "offset": [216, 230]}, {"key": "cost-of", "type": "definition", "offset": [236, 243]}, {"key": "existing-plant", "type": "clause", "offset": [286, 300]}, {"key": "costs-of", "type": "definition", "offset": [323, 331]}, {"key": "tree-trimming", "type": "clause", "offset": [355, 368]}, {"key": "bonding-and-grounding", "type": "clause", "offset": [398, 419]}, {"key": "of-the-company", "type": "clause", "offset": [463, 477]}], "hash": "461674c1fd0838d2ea33d7e6414a0a58", "id": 3}, {"snippet": "means materials, labor, engineering, supervision, site work, and tree trimming costs required in connection with LICENSEE's installation or modification of Equipment on a Light Pole. Make- Ready Costs shall include the costs of changing out poles (to the extent LICENSOR will be required to change out poles under this Agreement), including the cost of installation and removal of guys, anchors and equipment, temporary construction, and all other necessary construction in accordance with applicable industry and safety standards. In addition, Make- Ready Costs include reimbursement to LICENSOR for its removal of lights and lighting equipment and LICENSOR owned communications and/or security equipment, if any, from existing Light Poles not being used jointly by LICENSOR and LICENSEE and reinstalling them on replacement Light Poles installed by LICENSEE for joint use by LICENSOR and LICENSEE. Make-Ready Costs shall also include negotiated costs for review or installation in Other Areas. Make-Ready Costs shall also include reimbursement for costs paid by the LICENSOR to third-party consultants, for plan review, installation, or other costs associated with LICENSEE's proposed use of Light Poles, including reimbursement to engineers, and others, for the first two (2) installations of each of the following types of attachments: (i) up to $2,000 in the aggregate for Light Poles in the Right of Way (other than Non-Standard Light Poles); (ii) up to $2,000 in the aggregate for Non-Standard Light Poles in the Right of Way; and", "samples": [{"hash": "6GeBYxrhJGr", "uri": "/contracts/6GeBYxrhJGr#make-ready-costs", "label": "Master License Agreement", "score": 31.8409321983, "published": true}, {"hash": "8lhIkSbuGc1", "uri": "/contracts/8lhIkSbuGc1#make-ready-costs", "label": "Master License Agreement", "score": 29.9601947185, "published": true}], "size": 2, "snippet_links": [{"key": "site-work", "type": "definition", "offset": [50, 59]}, {"key": "tree-trimming", "type": "clause", "offset": [65, 78]}, {"key": "in-connection-with", "type": "clause", "offset": [94, 112]}, {"key": "modification-of-equipment", "type": "definition", "offset": [140, 165]}, {"key": "light-pole", "type": "definition", "offset": [171, 181]}, {"key": "costs-of", "type": "definition", "offset": [219, 227]}, {"key": "to-the-extent", "type": "clause", "offset": [248, 261]}, {"key": "licensor-will", "type": "clause", "offset": [262, 275]}, {"key": "this-agreement", "type": "clause", "offset": [314, 328]}, {"key": "removal-of", "type": "definition", "offset": [370, 380]}, {"key": "and-equipment", "type": "clause", "offset": [395, 408]}, {"key": "temporary-construction", "type": "clause", "offset": [410, 432]}, {"key": "in-accordance-with", "type": "definition", "offset": [471, 489]}, {"key": "safety-standards", "type": "clause", "offset": [514, 530]}, {"key": "in-addition", "type": "clause", "offset": [532, 543]}, {"key": "to-licensor", "type": "definition", "offset": [585, 596]}, {"key": "lighting-equipment", "type": "definition", "offset": [627, 645]}, {"key": "security-equipment", "type": "clause", "offset": [687, 705]}, {"key": "licensor-and-licensee", "type": "clause", "offset": [767, 788]}, {"key": "by-licensee", "type": "clause", "offset": [848, 859]}, {"key": "use-by-licensor", "type": "clause", "offset": [870, 885]}, {"key": "for-review", "type": "clause", "offset": [953, 963]}, {"key": "other-areas", "type": "clause", "offset": [983, 994]}, {"key": "reimbursement-for-costs", "type": "clause", "offset": [1032, 1055]}, {"key": "by-the-licensor", "type": "clause", "offset": [1061, 1076]}, {"key": "plan-review", "type": "definition", "offset": [1109, 1120]}, {"key": "other-costs", "type": "definition", "offset": [1139, 1150]}, {"key": "associated-with", "type": "definition", "offset": [1151, 1166]}, {"key": "proposed-use", "type": "definition", "offset": [1178, 1190]}, {"key": "types-of", "type": "clause", "offset": [1318, 1326]}, {"key": "in-the-aggregate", "type": "definition", "offset": [1357, 1373]}, {"key": "right-of-way", "type": "clause", "offset": [1397, 1409]}, {"key": "for-non", "type": "clause", "offset": [1484, 1491]}], "hash": "3919021bb12a18e938486bc367e0c62b", "id": 4}, {"snippet": "means all costs necessary for the City, and other existing parties on the applicable Pole, to prepare the Poles for a provider\u2019s new, additional or modified Attachments, including, but not limited to, the costs of materials, labor, engineering, supervision, overheads, and tree trimming costs. Engineering includes design, proper conductor spacing and bonding, calculations to determine proper ground clearances and pole down guy and anchor strength requirements for horizontal and transverse loading, and compliance with all applicable requirements. Also included among Make Ready Costs are the costs of installing or changing out primary Poles, secondary Poles and drop and lift poles, including the cost of installation and/or removal of guys, anchors, stub poles, materials and equipment, temporary construction and all other construction in accordance with the technical requirements and specifications as required by the City. City Make Ready Costs shall be verifiably comparable to the cost the City pays for similar Make Ready Work to its own facilities.", "samples": [{"hash": "alBSIrW3KGk", "uri": "https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/12757/1085600/pdf", "label": "mcclibraryfunctions.azurewebsites.us", "score": 13.3555427886, "published": false}, {"hash": "7ToN29CNfmT", "uri": "https://meetings.municode.com/d/f?u=https://mccmeetings.blob.core.usgovcloudapi.net/lawrvlga-pubu/MEET-Packet-e7f3ec4623044e5cb4a02d3cf7740b0e.pdf&n=AgendaPacket-City%20Council%20Special%20Call-September%2018,%202019%204.00%20PM.pdf", "label": "meetings.municode.com", "score": 7.8473648186, "published": false}], "size": 2, "snippet_links": [{"key": "all-costs", "type": "definition", "offset": [6, 15]}, {"key": "for-the-city", "type": "clause", "offset": [26, 38]}, {"key": "existing-parties", "type": "definition", "offset": [50, 66]}, {"key": "the-applicable", "type": "clause", "offset": [70, 84]}, {"key": "not-limited", "type": "clause", "offset": [185, 196]}, {"key": "costs-of", "type": "definition", "offset": [205, 213]}, {"key": "tree-trimming", "type": "clause", "offset": [273, 286]}, {"key": "to-determine", "type": "clause", "offset": [374, 386]}, {"key": "requirements-for", "type": "clause", "offset": [450, 466]}, {"key": "compliance-with", "type": "definition", "offset": [506, 521]}, {"key": "applicable-requirements", "type": "clause", "offset": [526, 549]}, {"key": "also-included", "type": "clause", "offset": [551, 564]}, {"key": "cost-of-installation", "type": "clause", "offset": [702, 722]}, {"key": "removal-of", "type": "definition", "offset": [730, 740]}, {"key": "materials-and-equipment", "type": "definition", "offset": [768, 791]}, {"key": "temporary-construction", "type": "clause", "offset": [793, 815]}, {"key": "other-construction", "type": "clause", "offset": [824, 842]}, {"key": "in-accordance-with", "type": "definition", "offset": [843, 861]}, {"key": "technical-requirements-and-specifications", "type": "definition", "offset": [866, 907]}, {"key": "by-the-city", "type": "clause", "offset": [920, 931]}], "hash": "6c911591217ff2ba0cc971bbf2776860", "id": 5}, {"snippet": "means all costs necessary for Licensor, and other existing parties on the applicable Pole, to prepare the Poles for Licensee\u2019s new, additional or modified Attachments, including, but not limited to, the costs of materials, labor, engineering, supervision, overheads, and tree trimming costs. Engineering includes design, proper conductor spacing and bonding, calculations to determine proper ground clearances and pole down guy and anchor strength requirements for horizontal and transverse loading, and compliance with all applicable requirements. Also included among Make Ready Costs are the costs of installing or changing out primary Poles, secondary Poles and drop and lift poles, including the cost of installation and/or removal of guys, anchors, stub poles, materials and equipment, temporary construction and all other construction in accordance with the technical requirements and specifications as outlined in this Agreement. Licensor Make Ready Costs will be verifiably comparable to the cost Licensor pays for similar Make Ready Work to its own facilities.", "samples": [{"hash": "6NqwJlNZQak", "uri": "/contracts/6NqwJlNZQak#make-ready-costs", "label": "Pole Attachment License Agreement", "score": 25.733744011, "published": true}], "size": 2, "snippet_links": [{"key": "all-costs", "type": "definition", "offset": [6, 15]}, {"key": "for-licensor", "type": "clause", "offset": [26, 38]}, {"key": "existing-parties", "type": "definition", "offset": [50, 66]}, {"key": "the-applicable", "type": "clause", "offset": [70, 84]}, {"key": "for-licensee", "type": "clause", "offset": [112, 124]}, {"key": "not-limited", "type": "clause", "offset": [183, 194]}, {"key": "costs-of", "type": "definition", "offset": [203, 211]}, {"key": "tree-trimming", "type": "clause", "offset": [271, 284]}, {"key": "to-determine", "type": "clause", "offset": [372, 384]}, {"key": "requirements-for", "type": "clause", "offset": [448, 464]}, {"key": "compliance-with", "type": "definition", "offset": [504, 519]}, {"key": "applicable-requirements", "type": "clause", "offset": [524, 547]}, {"key": "also-included", "type": "clause", "offset": [549, 562]}, {"key": "cost-of-installation", "type": "clause", "offset": [700, 720]}, {"key": "removal-of", "type": "definition", "offset": [728, 738]}, {"key": "materials-and-equipment", "type": "definition", "offset": [766, 789]}, {"key": "temporary-construction", "type": "clause", "offset": [791, 813]}, {"key": "other-construction", "type": "clause", "offset": [822, 840]}, {"key": "in-accordance-with", "type": "definition", "offset": [841, 859]}, {"key": "technical-requirements-and-specifications", "type": "definition", "offset": [864, 905]}, {"key": "in-this-agreement", "type": "definition", "offset": [918, 935]}], "hash": "8f797901baf0bdbefbc9d77673584a33", "id": 6}, {"snippet": "means all costs necessary for COOPERATIVE, and other existing parties on the pole, solely to prepare its Poles for Licensee\u2019s new, additional or modified Attachments, including, but not limited to, the costs of materials, labor, engineering, supervision, overheads, and tree trimming costs. Engineering includes design, proper conductor spacing and bonding, calculations to determine proper ground clearances and pole down guy and anchor strength requirements for horizontal and transverse loading, and compliance with all applicable requirements. Also included among Make Ready Costs are the costs of installing or changing out primary Poles, secondary Poles and Drop/Lift Poles, including the cost of installation and/or removal of guys, anchors, stub poles, materials and equipment, temporary construction and all other construction in accordance with the technical requirements and specifications as outlined in this Agreement. COOPERATIVE Make Ready Costs shall be verifiably comparable to the cost COOPERATIVE pays for similar Make-ready work to its own facilities. Make Ready Costs do not include any costs associated with correcting existing violations of the COOPERATIVE, or others attached to COOPERATIVE\u2019s Pole, at the time Licensee submits an Application.", "samples": [{"hash": "b2KqRikHxbT", "uri": "http://www.apscservices.info/pdf/11/11-173-c_68_1.pdf", "label": "www.apscservices.info", "score": 4.2114989733, "published": false}], "size": 2, "snippet_links": [{"key": "all-costs", "type": "definition", "offset": [6, 15]}, {"key": "necessary-for", "type": "definition", "offset": [16, 29]}, {"key": "existing-parties", "type": "definition", "offset": [53, 69]}, {"key": "for-licensee", "type": "clause", "offset": [111, 123]}, {"key": "not-limited", "type": "clause", "offset": [182, 193]}, {"key": "costs-of", "type": "definition", "offset": [202, 210]}, {"key": "tree-trimming", "type": "clause", "offset": [270, 283]}, {"key": "to-determine", "type": "clause", "offset": [371, 383]}, {"key": "requirements-for", "type": "clause", "offset": [447, 463]}, {"key": "compliance-with", "type": "definition", "offset": [503, 518]}, {"key": "applicable-requirements", "type": "clause", "offset": [523, 546]}, {"key": "also-included", "type": "clause", "offset": [548, 561]}, {"key": "cost-of-installation", "type": "clause", "offset": [695, 715]}, {"key": "removal-of", "type": "definition", "offset": [723, 733]}, {"key": "materials-and-equipment", "type": "definition", "offset": [761, 784]}, {"key": "temporary-construction", "type": "clause", "offset": [786, 808]}, {"key": "other-construction", "type": "clause", "offset": [817, 835]}, {"key": "in-accordance-with", "type": "definition", "offset": [836, 854]}, {"key": "technical-requirements-and-specifications", "type": "definition", "offset": [859, 900]}, {"key": "in-this-agreement", "type": "definition", "offset": [913, 930]}, {"key": "associated-with", "type": "definition", "offset": [1114, 1129]}, {"key": "existing-violations", "type": "clause", "offset": [1141, 1160]}, {"key": "at-the-time", "type": "clause", "offset": [1223, 1234]}], "hash": "7dc6d9cf98b6a5b4404167f917c6b21b", "id": 7}, {"snippet": "means all costs necessary for SLECA, and other existing parties on the pole, to prepare its Poles for Licensee\u2019s new, additional or modified Attachments, including, but not limited to, the costs of materials, labor, engineering, supervision, overheads, and tree trimming costs. Engineering includes design, proper conductor spacing and bonding, calculations to determine proper ground clearances and pole down guy and anchor strength requirements for horizontal and transverse loading, and compliance with all applicable requirements. Also included among Make Ready Costs are the costs of installing or changing out primary Poles, secondary Poles and Drop/Lift Poles, including the cost of installation and/or removal of guys, anchors, stub poles, materials and equipment, temporary construction and all other construction in accordance with the technical requirements and specifications as outlined in this Agreement. SLECA Make Ready Costs shall be verifiably comparable to the cost SLECA pays for similar Make-ready work to its own facilities. Make Ready Costs do not include any costs associated with correcting existing violations of SLECA, or others attached to SLECA\u2019s Pole, at the time Licensee submits an Application.", "samples": [{"hash": "gl2UWJqckNM", "uri": "/contracts/gl2UWJqckNM#make-ready-costs", "label": "Pole Attachment License Agreement", "score": 24.7837097878, "published": true}], "size": 1, "snippet_links": [{"key": "all-costs", "type": "definition", "offset": [6, 15]}, {"key": "necessary-for", "type": "definition", "offset": [16, 29]}, {"key": "existing-parties", "type": "definition", "offset": [47, 63]}, {"key": "for-licensee", "type": "clause", "offset": [98, 110]}, {"key": "not-limited", "type": "clause", "offset": [169, 180]}, {"key": "costs-of", "type": "definition", "offset": [189, 197]}, {"key": "tree-trimming", "type": "clause", "offset": [257, 270]}, {"key": "to-determine", "type": "clause", "offset": [358, 370]}, {"key": "requirements-for", "type": "clause", "offset": [434, 450]}, {"key": "compliance-with", "type": "definition", "offset": [490, 505]}, {"key": "applicable-requirements", "type": "clause", "offset": [510, 533]}, {"key": "also-included", "type": "clause", "offset": [535, 548]}, {"key": "cost-of-installation", "type": "clause", "offset": [682, 702]}, {"key": "removal-of", "type": "definition", "offset": [710, 720]}, {"key": "materials-and-equipment", "type": "definition", "offset": [748, 771]}, {"key": "temporary-construction", "type": "clause", "offset": [773, 795]}, {"key": "other-construction", "type": "clause", "offset": [804, 822]}, {"key": "in-accordance-with", "type": "definition", "offset": [823, 841]}, {"key": "technical-requirements-and-specifications", "type": "definition", "offset": [846, 887]}, {"key": "in-this-agreement", "type": "definition", "offset": [900, 917]}, {"key": "associated-with", "type": "definition", "offset": [1089, 1104]}, {"key": "existing-violations", "type": "clause", "offset": [1116, 1135]}, {"key": "at-the-time", "type": "clause", "offset": [1182, 1193]}], "hash": "bcd89921e1a9e3828646633d5e6d1ba2", "id": 8}, {"snippet": "means all actual costs necessary for IPL to prepare its facilities to accommodate the City\u2019s Attachments including the reasonable costs of materials, labor, engineering, and supervision and other associated costs.", "samples": [{"hash": "i5jezARubU8", "uri": "https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/447341a9-2d8c-e711-812a-1458d04ecfb0/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=44981%20IPL_Submission%20of%20Direct%20Testimony_082817.pdf", "label": "iurc.portal.in.gov", "score": 6.8275154004, "published": false}], "size": 1, "snippet_links": [{"key": "actual-costs", "type": "clause", "offset": [10, 22]}, {"key": "necessary-for", "type": "definition", "offset": [23, 36]}, {"key": "the-city", "type": "clause", "offset": [82, 90]}, {"key": "costs-of", "type": "definition", "offset": [130, 138]}, {"key": "associated-costs", "type": "definition", "offset": [196, 212]}], "hash": "52533157f75feab7da397f2af2f1dabb", "id": 9}, {"snippet": "means materials, labor, engineering, supervision, site work, and tree trimming costs required, where LICENSOR has elected to perform all or any portion of such work pursuant to Paragraph IV.a, below, in connection with LICENSEE's installation or modification of Equipment on an existing LICENSOR Pole. Make-Ready Costs shall include the costs of replacing existing poles (to the extent LICENSOR is undertaking the work required to replace existing poles under this Agreement), including the cost of installation and removal of guys, anchors and equipment, temporary construction, and all other necessary construction in accordance with applicable industry and safety standards (collectively sometimes referred to herein as \"Make-Ready Work\"). Except as otherwise mutually approved by the Parties, LICENSOR's Make-Ready Costs shall be paid by LICENSEE to LICENSOR as provided under Paragraph IV.a, below. Notwithstanding, Make-Ready Costs shall not include fees which may be separately charged to LICENSEE pursuant to LICENSOR's Ordinance or Resolution for plan review, permits, and inspections required in connection with any work to be performed by LICENSEE in LICENSOR's Right of Way or Other Areas. OTHER AREAS. Property owned and managed by the LICENSOR other than Right of Way. Other Areas includes \"City Parks\", defined for purposes of this Agreement as public parks, recreational facilities, and community centers administered by LICENSOR.", "samples": [{"hash": "2BNJW4eiO5a", "uri": "/contracts/2BNJW4eiO5a#make-ready-costs", "label": "Master License Agreement", "score": 26.3716632444, "published": true}], "size": 1, "snippet_links": [{"key": "site-work", "type": "definition", "offset": [50, 59]}, {"key": "tree-trimming", "type": "clause", "offset": [65, 78]}, {"key": "pursuant-to-paragraph", "type": "clause", "offset": [165, 186]}, {"key": "in-connection-with", "type": "clause", "offset": [200, 218]}, {"key": "modification-of-equipment", "type": "definition", "offset": [246, 271]}, {"key": "existing-licensor", "type": "definition", "offset": [278, 295]}, {"key": "costs-of", "type": "definition", "offset": [337, 345]}, {"key": "to-the-extent", "type": "clause", "offset": [372, 385]}, {"key": "work-required", "type": "clause", "offset": [414, 427]}, {"key": "removal-of", "type": "definition", "offset": [516, 526]}, {"key": "and-equipment", "type": "clause", "offset": [541, 554]}, {"key": "temporary-construction", "type": "clause", "offset": [556, 578]}, {"key": "in-accordance-with", "type": "definition", "offset": [617, 635]}, {"key": "safety-standards", "type": "clause", "offset": [660, 676]}, {"key": "approved-by-the-parties", "type": "definition", "offset": [772, 795]}, {"key": "by-licensee", "type": "clause", "offset": [839, 850]}, {"key": "to-licensor", "type": "definition", "offset": [851, 862]}, {"key": "to-licensee", "type": "definition", "offset": [993, 1004]}, {"key": "plan-review", "type": "definition", "offset": [1056, 1067]}, {"key": "performed-by", "type": "clause", "offset": [1137, 1149]}, {"key": "right-of-way", "type": "clause", "offset": [1173, 1185]}, {"key": "other-areas", "type": "clause", "offset": [1189, 1200]}, {"key": "by-the-licensor", "type": "clause", "offset": [1242, 1257]}, {"key": "city-parks", "type": "definition", "offset": [1305, 1315]}, {"key": "for-purposes-of-this-agreement", "type": "definition", "offset": [1326, 1356]}, {"key": "public-parks", "type": "definition", "offset": [1360, 1372]}, {"key": "recreational-facilities", "type": "definition", "offset": [1374, 1397]}, {"key": "community-centers", "type": "clause", "offset": [1403, 1420]}, {"key": "by-licensor", "type": "clause", "offset": [1434, 1445]}], "hash": "84316fe3f3e66da029af4ff10b46d489", "id": 10}], "next_curs": "Cl0SV2oVc35sYXdpbnNpZGVyY29udHJhY3RzcjkLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIZbWFrZS1yZWFkeS1jb3N0cyMwMDAwMDAwYQyiAQJlbhgAIAA=", "definition": {"snippet": "means the costs incurred by an Attacher associated with the transfer of the facilities, antenna, lines or equipment of a Pre-Existing Third Party User, undertaken by an Attacher to enable attachment to the utility pole or similar structure. Make-Ready Costs that are to be paid by an Attacher include, without limitation, all costs and expenses to relocate or alter the attachments or facilities of any Pre-Existing Third Party User as may be necessary to accommodate an Attacher\u2019s attachment.", "title": "Make Ready Costs", "size": 34, "id": "make-ready-costs", "examples": ["Upon receipt by Electric Provider of Licensee\u2019s notice of estimate approval of <strong>Make Ready Costs</strong>, the Electric Provider will proceed with Make Ready Work.", "In the event Attacher does not exercise its rights granted pursuant to this Agreement or an applicable Permit within six (6) months of the effective date of such right and any extension thereof granted by Pole Owner in its exclusive discretion, Attacher shall forfeit the Engineering Charge and <strong>Make Ready Costs</strong>, and Pole Owner may use the space scheduled for Attacher\u2019s Attachments for its own needs or the needs of other Attaching Utilities.", "Licensee shall reimburse EMC the Actual Costs, except in the case of Transfers for road improvement projects and EMC\u2019s installation of new Poles where none currently exist, including all labor, materials, transportation, normal overheads, and appropriate and reasonable other costs incurred by EMC in performing necessary field inspections and preparation of an estimate of the <strong>Make Ready Costs</strong> of each Pole covered in the Appendix A.", "Upon receipt by EMC of Licensee\u2019s notice of estimate approval of <strong>Make Ready Costs</strong>, the EMC will proceed with Make-ready work.", "Inspection Fee \u2013 Except for any work required by Licensor, including, but not limited to, Transfers and rearrangements done at the request of Licensor or a third party, road improvement projects, and the installation of new Poles where none currently exist, Licensee will reimburse Licensor for the Actual Costs incurred by Licensor in performing necessary field inspections and preparation of an estimate of the <strong>Make Ready Costs</strong> of each Pole covered in the Appendix A.", "Licensee shall reimburse SLECA the Actual Costs, except in the case of Transfers for road improvement projects and SLECA\u2019s installation of new Poles where none currently exist, including all labor, materials, transportation, normal overheads, and appropriate and reasonable other costs incurred by SLECA in performing necessary field inspections and preparation of an estimate of the <strong>Make Ready Costs</strong> of each Pole covered in the Appendix A.", "If the actual Make-Ready Costs are ninety percent (90%) or less of the Make Ready Estimate, Pole Owner shall promptly refund to Attacher a credit for the difference between the Make Ready Estimate and the actual <strong>Make Ready Costs</strong>.", "The Attacher will be given the options of (1) paying <strong>Make Ready Costs</strong> initially to accommodate future required reserve capacity or space; (2) paying Make Ready Cost in the future when such reserved capacity or space or required by the Pole Owner; or (3) electing to remove its Attachments at the time the reserve capacity or space is required by the Pole Owner.", "Upon receipt by SLECA of Licensee\u2019s notice of estimate approval of <strong>Make Ready Costs</strong>, SLECA will proceed with Make Ready Work.", "Should the Licensee fail to submit an Appendix A within fifteen (15) business days, and subsequently wishes to attach to new Pole facilities, Licensee must submit an Appendix A in accordance with Article 4, Establishing Attachments to Poles, including the payment of all applicable Application fees, inspection fees and <strong>Make Ready Costs</strong>."], "related": [["delivery-costs", "Delivery Costs", "Delivery Costs"], ["direct-costs", "Direct Costs", "Direct Costs"], ["reimbursable-costs", "Reimbursable Costs", "Reimbursable Costs"], ["start-up-costs", "Start-Up Costs", "Start-Up Costs"], ["overhead-costs", "Overhead costs", "Overhead costs"]], "related_snippets": [], "updated": "2025-07-06T21:58:36+00:00"}, "json": true, "cursor": ""}}