Lead Time means the quoted timeframe calculated between the date of receipt of the PO by Supplier and the Delivery Date.
Service Component means certain enabling Software, hardware peripherals and associated documentation which may be separately provided by Symantec as an incidental part of a Service.
Direction-indicator lamp means the lamp used to indicate to other road-users that the driver intends to change direction to the right or to the left;
MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;
Product Category means the applicable category which best describes the product as listed in this Section 94508.
Runtime Product means the version specific files and application program interfaces (APIs) specified in the RUNTIME.TXT file provided with SAP Crystal Reports 2008, SAP Crystal Reports for Eclipse 2.0, and SAP Crystal Reports for Visual Studio 2010.
Cost of work , in table above, shall mean the agreement amount of the work.
Manufacturing Cost means ***
product type means any of the following:
Batch number means a unique numeric or alphanumeric identifier assigned prior to any testing to allow for inventory tracking and traceability.
Drug sample means a unit of a prescription drug that is not intended to be sold and is intended to promote the sale of the drug.
Recall campaign means the period of time beginning on the
Contract Quantity means the quantity of Delivered Energy expected to be delivered by Seller during each Contract Year as set forth in Section 3.1(e).
Structural component means a component that supports non-variable forces or weights (dead loads) and variable forces or weights (live loads).
API means the American Petroleum Institute.
Product Group or “the Group” means a group of lotteries that has joined together to offer a product pursuant to the terms of the Multi-State Lottery Agreement and the Product Group’s own rules.
Manufacturing site means the facilities where a Compound is Manufactured by or on behalf of a Party, as such Manufacturing Site may change from time to time in accordance with Section 8.7.
Corrective Measure The contractor shall repair and deficiencies which do not meet the performance guideline.
Tare Weight means the weight of an empty shipping container, excluding all materials used for wrapping, cushioning, banding, waterproofing, packaging, blocking and bracing articles within the exterior container.
Cost of Goods Sold means [***].
Tobacco product manufacturer means an entity that after the date of enactment of this Act directly (and not exclusively through any affiliate):
Process weight means the total weight of all materials introduced into any source operation. Solid fuels charged will be considered as part of the process weight, but liquid and gaseous fuels and combustion air will not.
Type of Work means (insert the type of work you expect to supply the Agency Worker into);
Aerosol coating product means a pressurized coating product containing pigments or resins that dispenses product ingredients by means of a propellant, and is packaged in a disposable can for hand-held application, or for use in specialized equipment for ground traffic/marking applications.
SKU means stock-keeping unit.
Finished Services means complete end-to-end services offered by Qwest to wholesale customers or retail End User Customers. Finished Services do not include Unbundled Network Elements or combinations of Unbundled Network Elements. Finished Services include Access Services, private lines, retail services, and resold services.