ISO-NE Regional System Plan means the annual planning report of ISO-NE concerning New England's bulk electric power system in effect on December 15, 2008.

Examples of ISO-NE Regional System Plan in a sentence

  • All studies must assume the project will interconnect using the Capacity Capability Interconnection Standard, must use the current ISO-NE interconnection process (including network impact scenarios from multiple projects interconnecting), and must also detail any assumptions with respect to projects that are ahead of the proposed project in the ISO-NE interconnection queue and any assumptions as to changes to the transmission system that differ from the current ISO-NE Regional System Plan.

  • The interface limits used in the simulations reflect the existing system, ongoing transmission upgrades including those discussed in the ISO-NE Regional System Plan, and the reference Market Analytics database.

  • We modeled the Study Area of PJM, NYISO as eleven zones (using NYISO zones A-K), and ISO-NE as thirteen zones (using ISO-NE Regional System Plan subareas).

  • All studies must assume the project will interconnect using the Capacity Capability Interconnection Standard, must use the current ISO-NE interconnection process (including network impact scenarios from multiple projects interconnecting), and must also detail any assumptions with respect to projects that are ahead ofthe proposed project in the ISO-NE interconnection queue and any assumptions as to changes to the transmission system that differ from the current ISO-NE Regional System Plan.

  • All studies must assume the project will interconnect using the Capacity Capability Interconnection Standard, must use the current ISO-NE interconnection process (including network impact scenarios from multiple projects interconnecting), and must also detail any assumptions with respect to projects ahead of the proposed project in the ISO-NE interconnection queue and any assumptions as to changes to the transmission system that differ from the current ISO-NE Regional System Plan.

  • The impacts and timing of both projects are very similar; we assumed that Northern Pass Transmission would be constructed in 2019.• 2015-2016 NYSRC Installed Capacity Requirement Report, December 15, 2015• 2015 ISO-NE Regional System Plan Report, November 5, 201570We used the latest load forecasts from PJM, NYISO, and ISO-NE, extrapolated through 2042, the last year of the Study Period.

  • It is understood that permitted bargaining may result in agreement terms that require modification, or rescinding of existing rules and regulations.

  • The 2017 ISO-NE Regional System Plan identifies the following power plants as retired or slated to retire in the near future.

  • The Commission shall decide on the request for recusal according to sentences 3 and 4 prior to any further deliberation or decision and prior to any further participation of the member concerned in the proceedings.

  • The list includes an identifier to allow interested parties to reference the project to the ISO-NE Regional System Plan or asset condition list.

Related to ISO-NE Regional System Plan

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Merit system plan means those regulations adopted by the Board in the development and operation

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Public water supply system means a system for the provision to the public of piped water for human consumption, if the system has at least fifteen service connections or regularly serves at least twenty-five individuals. The term includes any source of water and any collection, treatment, storage, and distribution facilities under control of the operator of the system and used primarily in connection with the system, and any collection or pretreatment storage facilities not under such control which are used primarily in connection with the system.

  • multi-system operator or “MSO” means a cable operator who has been granted registration under rule 11 of the Cable Television Networks Rules, 1994 and who receives a programming service from a broadcaster and re-transmits the same or transmits his own programming service for simultaneous reception either by multiple subscribers directly or through one or more local cable operators;

  • Unfit-for-use tank system means a tank system that has been determined through an integrity assessment or other inspection to be no longer capable of storing or treating hazardous waste without posing a threat of release of hazardous waste to the environment.

  • Independent System Operator means a person that may receive or has received, by transfer pursuant

  • distribution system operator means a natural or legal person responsible for operating, ensuring the maintenance of and, if necessary, developing the distribution system in a given area and, where applicable, its interconnections with other systems and for ensuring the long-term ability of the system to meet reasonable demands for the distribution of electricity;

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • Multiregional Modeling Working Group or “MMWG” shall mean the NERC working group that is charged with multi-regional modeling.

  • Accessibility Standards means accessibility standards and specifications for Texas agency and institution of higher education websites and EIR set forth in 1 TAC Chapter 206 and/or Chapter 213.

  • Quality Standards means the quality standards published by BSI British Standards, the National Standards Body of the United Kingdom, the International Organisation for Standardisation or other reputable or equivalent body, (and their successor bodies) that a skilled and experienced operator in the same type of industry or business sector as the Contractor would reasonably and ordinarily be expected to comply with, and as may be further detailed in the Specification.

  • Ambient air quality standard means an established concentration, exposure time, and frequency of occurrence of air contaminant(s) in the ambient air which shall not be exceeded.

  • NERC Reliability Standards means the most recent version of those reliability standards applicable to the Generating Facility, or to the Generator Owner or the Generator Operator with respect to the Generating Facility, that are adopted by the NERC and approved by the applicable regulatory authorities, which are available at xxxx://xxx.xxxx.xxx/files/Reliability_Standards_Complete_Set.pdf, or any successor thereto.

  • Cabinet x-ray system means an x-ray system with the x-ray tube installed in an enclosure independent of existing architectural structures except the floor on which it may be placed. The cabinet x-ray system is intended to contain at least that portion of a material being irradiated, provide radiation attenuation, and exclude personnel from its interior during generation of radiation. Included are all x-ray systems designed primarily for the inspection of carry-on baggage at airline, railroad, and bus terminals, and in similar facilities. An x-ray tube used within a shielded part of a building, or x-ray equipment that may temporarily or occasionally incorporate portable shielding, is not considered a cabinet x-ray system.

  • Reliability Standards means the criteria, standards, rules and requirements relating to reliability established by a Standards Authority.

  • Analytical x-ray system means a group of components utilizing x-rays to determine the elemental composition or to examine the microstructure of materials.

  • Applicable water quality standards means all water quality standards to which a discharge is subject under the federal Clean Water Act and which has been (a) approved or permitted to remain in effect by the Administrator following submission to the Administrator pursuant to Section 303(a) of the Act, or (b) promulgated by the Director pursuant to Section 303(b) or 303(c) of the Act, and standards promulgated under (APCEC) Regulation No. 2, as amended.

  • Electronic Subcontracting Reporting System (eSRS) means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.

  • total system means the transmission system and the distribution system of the Board taken together;

  • Common promotional plan means a plan, undertaken by a person

  • Quality system means documented organizational procedures and policies: internal audits of those policies and procedures: management review and recommendation for quality improvement.”

  • PJM Region Reliability Requirement means, for purposes of the Base Residual Auction, the Forecast Pool Requirement multiplied by the Preliminary PJM Region Peak Load Forecast, less the sum of all Preliminary Unforced Capacity Obligations of FRR Entities in the PJM Region; and, for purposes of the Incremental Auctions, the Forecast Pool Requirement multiplied by the updated PJM Region Peak Load Forecast, less the sum of all updated Unforced Capacity Obligations of FRR Entities in the PJM Region.

  • System Operator means the person who is the system operator under the Act;

  • Centralized Message Distribution System (CMDS) means the industry-wide data collection system, which handles the daily exchange of message details between CMDS participating telephone companies (also known as CMDS Direct Participants). AT&T-21STATE is a CMDS Direct Participant.