Initiate Construction definition

Initiate Construction means -
Initiate Construction means the following: for building development - completion of construction of all foundations, framing, siding and roofs.

Examples of Initiate Construction in a sentence

  • U.S., Tajik Officials Initiate Construction of Military Training Center,” RFE/RL, July 7, 2011; U.S. Embassy, Dushanbe, Solicitation Notice: National Training Center at Karatog, Tajikistan, May 11, 2012, at http://dushanbe.usembassy.gov/ct_05112012.html; Tajikistan National Training Center, AHNTech, at http://ahntech.com/past-projects/tajikistan-construction; U.S. Embassy, Dushanbe, U.S. Embassy Donates Practical Exercise Training Area Facility to Tajikistan’s Customs Service, January 21, 2014.

  • Initiate Construction: The completion of a portion of the improvements which represents no less than thirty (30) percent of the costs of the proposed improvements within an approved project.

  • U.S., Tajik Officials Initiate Construction of Military Training Center,” RFE/RL, July 7, 2011; U.S. Embassy, Dushanbe, Solicitation Notice: National Training Center at Karatog, Tajikistan, May 11, 2012, at http://dushanbe.usembassy.gov/ct_05112012.html.

  • Other corrections by NALLINO into recomputed values (E, or any easy correction of it, dif- fers by 2″ or more (in three cases by only 1″) from values recomputed by SCHIAPARELLI): 9 3;35,15: A; 55″ E, 17″ N, 18″ r.

  • The Buyer may terminate this Agreement during the Study Period in accordance with Section 6.8 of this Agreement, and neither Party shall have any further obligations thereafter, except as provided in Section 7.3.6.6 Initiate Construction.

  • Complete Construction of Supplemental Carbon Process: Initiate Construction of Anaerobic Zone in One Aeration Battery w/ Carbon Addition 50 months from effective date of this Permit9.

  • Complete Construction of Anaerobic Zone in One Aeration Battery; Initiate Construction of Anaerobic Zone in All Batteries w/ Carbon Addition; Initiate Design of Sidestream Phosphorus Recovery Process 60 months from effective date of this Permit11.

  • If the HCP does not wish to consent to the disclosure of his personal data, disclosure is made on an aggregate basis, without naming the HCP.

  • Initiate Construction of Additional Aeration Tank in Battery D; Initiate Pilot Test of Active Solids Recovery on One Final Tank (Final Tank Enhancements); Initiate Evaluation of Phosphorus Loading from Egan WRP; Investigate Phosphorus Source Control via the Industrial Pretreatment Program and the Use of Algae to Recover Phosphorus from the Liquid Stream6 months from effective date of permit 2.

  • Complete Design and Initiate Construction of Centrate Treatment System at Egan WRP; Pending Results of Bio-P Feasibility Study Initiate Installation of Anaerobic Zone in One Battery; Progress Report on Final Tank Enhancements, Tests for Supplemental Carbon Process, Investigation of Phosphorus Source Control, and the Use of Algae to Recover Phosphorus 36 months from effective date of permit 7.

Related to Initiate Construction

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Original construction ’ shall mean the first or initial construction

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.

  • the Constitution means the Constitution of the Republic of South Africa, Act 108 of 1996

  • Construction means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction and demolition debris means and includes:

  • Foreign construction material means a construction material other than a domestic construction material.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Construction activity means any clearing, grading or excavation associated with large construction activity or associated with small construction activity.