HWDP definition
Examples of HWDP in a sentence
Contractor’s furnished drill pipe, HWDP, drill pipe pup joints, subs, inside BOPs, lower ▇▇▇▇▇ valves, drill collars, subs and similar items shall be in accordance with API ▇▇▇▇ ▇, ▇▇▇ ▇▇▇▇ ▇ ▇▇▇ ▇▇▇ ▇▇▇▇.
After drilling the well/▇▇▇▇▇ 10 (ten) percent of the drill pipe, HWDP and drill collars will be inspected by third party if operations are beyond standard drilling parameters (e.g. over torque, overpull, jarring) or the visual inspection of the drill pipe, HWDP and drill collars shows a damage.
During the term of the Agreement all drill pipe, HWDP and drill collars will be inspected according to the Contractor`s maintenance program and all drill string components are inspected to the standard of API RP7G.
Prior to the Term Commencement Date, Contractor, at its expense, shall provide manufacturer and Third Party inspection certificates for Contractor’s furnished drill pipe, HWDP, drill pipe pup joints, inside BOPs, lower ▇▇▇▇▇ valves, drill collars, subs, and similar items in used condition, delivered in accordance with T.
Prior to the Term Commencement Date, Contractor, at its expense, shall provide third party inspection certificates for Contractor’s furnished drill pipe, HWDP, drill pipe pup joints, subs, inside BOPs, lower ▇▇▇▇▇ valves, drill collars, subs, etc., to T.
Contractor shall initially supply a new or used string of internally coated drill pipe, HWDP, drill collars and subs (“Drill String”) and handling equipment in accordance with the requirements of Attachment A1 to Exhibit A – Scope of Work.
Drill string components shall be inspected by a third party inspection company at the beginning of this contract and then no less frequently than the intervals below: Drill pipe and tool joints 1500 rotating hours Drill collars, HWDP, stabilizers, hole openers, underreamers, drilling jars, roller reamers, floor safety valves, and IBOP’s 300 rotating hours (Excluding back reaming time.) CONTRACTOR shall furnish COMPANY with a copy of the inspection reports.