HRU definition
Examples of HRU in a sentence
Revisions to this Section 3, subsection A, if required as a result of inclusion of HRU Work scope, will be agreed to by Owner and Contractor, both acting reasonably and in good faith, prior to or at the time the final test procedures for the conduct of the Performance Tests are established in accordance with Section 11.2 of the Agreement.
Revisions to Sections 2.4 subsection 5, 2.5 subsection 6(d) and 3.7 of this Attachment S, if required as a result of inclusion of HRU Work scope, will be agreed to by Owner and Contractor, both acting reasonably and in good faith, prior to or at the time the final test procedures for the conduct of the Performance Tests are established in accordance with Section 11.2 of the Agreement.
Revisions to this Section 2, subsection A, if required as a result of inclusion of HRU Work scope, will be agreed to by Owner and Contractor, both acting reasonably and in good faith, prior to or at the time the final test procedures for the conduct of the Performance Tests are established in accordance with Section 11.2 of the Agreement.
Contractor shall obtain and incorporate into the engineering design for the HRU Unit necessary engineering information from [***].
For the avoidance of doubt the Seller confirms that any costs arising from any refit instruction given by the Seller in relation to the HRU units (as more particularly described in Disclosure 40 in the Disclosure Letter) shall be its liability (or that of another company in its group) and not the Buyer’s.
Early design development placed the Heat Recovery Unit (HRU) substations in the southeast corner of the Train 1 ISBL and the Train 2 ISBL.
Contractor shall enter into and administer (i) process licenses and (ii) technical services Subcontracts with process licensors APCI, BASF and [***] for the LNG liquefaction, carbon dioxide removal, and HRU, respectively.
Early design development placed the Heat Recovery Unit (HRU) substation in the southeast corner of the Train 1 ISBL and the Train 2 ISBL under the Trains 1 and 2 EPC Agreement.
Quantify pollutant load export reductions associated with various land-based watershed management optimization scenarios using calibrated hydrologic response unit (HRU) SWMM water quality models and the R1 Opti- Tool.
This project shall be completed for the base bid sum of $1,572,475.00 for HRU Units 1,2,3,5.