Henry Mountains Tony M–Southwest Technical Report definition

Henry Mountains Tony M–Southwest Technical Report means the technical report entitled “Technical Report on the Tony M-Southwest Deposit, Henry Mountains Complex Uranium Project, Utah, USA” dated March 19, 2009 prepared for Denison by Douglas H. Underhill, Ph.D., C.P.G. and William E. Roscoe, Ph.D., P.Eng. of Scott Wilson RPA, filed by Denison on SEDAR on April 6, 2009;

Related to Henry Mountains Tony M–Southwest Technical Report

  • Geotechnical report or "geotechnical analysis" means a scientific study or evaluation conducted by a qualified expert that includes a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties. Geotechnical reports shall conform to accepted technical standards and must be prepared by qualified professional engineers or geologists who have professional expertise about the regional and local shoreline geology and processes.

  • Technical Report means a report prepared and filed in accordance with this Instrument and Form 43-101F1 Technical Report that includes, in summary form, all material scientific and technical information in respect of the subject property as of the effective date of the technical report; and

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • TELRIC means Total Element Long-Run Incremental Cost.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and other such sources as approved by the MNRE;

  • Critical Energy Infrastructure Information means all information, whether furnished before or after the mutual execution of this Agreement, whether oral, written or recorded/electronic, and regardless of the manner in which it is furnished, that is marked “CEII” or “Critical Energy Infrastructure Information” or which under all of the circumstances should be treated as such in accordance with the definition of CEII in 18 C.F.R. § 388.13(c)(1). The Receiving Party shall maintain all CEII in a secure place. The Receiving Party shall treat CEII received under this agreement in accordance with its own procedures for protecting CEII and shall not disclose CEII to anyone except its Authorized Representatives.

  • IOSCO means the International Organisation of Securities Commissions.

  • South Caucasus/Central and South Asian (SC/CASA) state means Armenia, Azerbaijan, Georgia, Kazakhstan, Kyrgyzstan, Pakistan, Tajikistan, Turkmenistan, or Uzbekistan.

  • CDBG means community development block grant.

  • Asset Management Plan means a plan created by the department and approved by the state transportation commission or a plan created by a local road agency and approved by the local road agency's governing body that includes provisions for asset inventory, performance goals, risk of failure analysis, anticipated revenues and expenses, performance outcomes, and coordination with other infrastructure owners.

  • Opium poppy means the plant of the species Papaver somniferum L., except its seeds.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Information technology services means services designed to do any of the following:

  • Systems Engineering means preparing specifications, identifying and resolving interface problems, developing test requirements, evaluating test data, and supervising design.

  • Radiopharmaceutical quality assurance means, but is not limited to, the performance of appropriate chemical, biological, and physical tests on potential radiopharmaceuticals and the interpretation of the resulting data to determine their suitability for use in humans and animals, including internal test assessment, authentication of product history, and the keeping of proper records.

  • Renewable Energy Source means an energy source that is not fossil carbon-based, non- renewable or radioactive, and may include solar, wind, biomass, geothermal, landfill gas, or wave, tidal and thermal ocean technologies, and includes a Certified Renewable Energy Source.

  • COVID-19 means SARS-CoV-2 or COVID-19, and any evolutions thereof or related or associated epidemics, pandemic or disease outbreaks.

  • SITC means the Standard International Trade Classification, Revision 3 (SITC, Rev. 3), published by the United Nations in Statistical Papers, Series M, No. 34/Rev. 3 (1986);

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Information Technology Resources means agency budgetary resources, personnel, equipment, facilities, or services that are primarily used in the management, operation, acquisition, disposition, and transformation, or other activity related to the lifecycle of information technology; acquisitions or interagency agreements that include information technology and the services or equipment provided by such acquisitions or interagency agreements; but does not include grants to third parties which establish or support information technology not operated directly by the Federal Government. (0MB M-15-14)

  • National Ambient Air Quality Standards or “NAAQS” means national ambient air quality standards that are promulgated pursuant to Section 109 of the Act, 42 U.S.C. § 7409.

  • Technology startup company means a for profit business that