Green Line definition
Examples of Green Line in a sentence
As the extension of the Green Line and MBTA Station are expected to act as a catalyst for the revitalization of Union Square and the adjacent Boynton Yards area, the SRA and the City sought to facilitate private redevelopment to accomplish this anticipated revitalization.
Section 22.0908(k) requires that the Sale Transaction shall facilitate the daily and efficient use of the existing Metropolitan Transit System’s Green Line transit station on the Real Property, shall accommodate a planned Purple Line transit station on or about the Real Property, and shall enhance a pedestrian connection to the existing light rail transit center on the Real Property.
Subsequently, the Massachusetts Bay Transportation Authority (“MBTA”) obtained funding to extend the Green Line and construct a new Green Line station at Union Square (the “MBTA Station”), currently anticipated to be ready for operation in June, 2021.
The Buyer may raise this alert through their point of contact or through the Green Line: ▇▇▇▇▇://▇▇▇▇▇▇.▇▇▇▇▇▇▇▇▇▇▇.▇▇/domain/media/en/gui/104677/index.html .
Those concepts set forth in the Master Plan, the ▇▇▇▇▇▇▇▇ Avenue Area Station Plan and Greening the Green Line plan.
Within twelve months of 90% occupancy of ▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇, FWRT or CRTMA will complete a study on the feasibility of providing service connecting the Buildings to the B, C, and D Green Line branches.
The Buyer may raise this alert through their point of contact or through the Green Line: ▇▇▇▇▇://▇▇▇▇▇▇.▇▇▇▇▇▇▇▇▇▇▇.▇▇/domain/media/en/gui/104677/index.html.
In addition, delivery of support outside of the applicable HPE coverage areas (as an example, outside of the Green Line) may be subject to travel charges, longer response times, reduced restoration or repair commitments, and reduced coverage hours.
With construction of the first line (E Street Corridor, now known as the Green Line) substantially completed, the 15.7-mile corridor spans between northern San Bernardino and Loma ▇▇▇▇▇.
The previous design included a complete demolition and reconstruction of the bridge since the current clearance below the existing bridge does not provide sufficient space for the two Green Line tracks and the two commuter rail tracks.