{"component": "definition", "props": {"groups": [{"snippet": "means the steam and gas turbine electric generators listed on Schedule 1.01(a).", "samples": [{"hash": "h86koApXtVZ", "uri": "/contracts/h86koApXtVZ#generating-units", "label": "Interconnection Agreement", "score": 28.2218129139, "published": true}, {"hash": "iSAy2nhu3Af", "uri": "/contracts/iSAy2nhu3Af#generating-units", "label": "Interconnection Agreement", "score": 28.0713717587, "published": true}, {"hash": "dnFnxgoKJDj", "uri": "/contracts/dnFnxgoKJDj#generating-units", "label": "Interconnection Agreement", "score": 27.5944086707, "published": true}], "size": 8, "snippet_links": [{"key": "electric-generators", "type": "clause", "offset": [32, 51]}, {"key": "on-schedule", "type": "definition", "offset": [59, 70]}], "hash": "e641f8b3ffeb5f56a6794e9ee023ac68", "id": 1}, {"snippet": "means the generating unit or units specified in Appendix 1.03.", "samples": [{"hash": "2jEb3nmofu5", "uri": "/contracts/2jEb3nmofu5#generating-units", "label": "Resource Adequacy Purchase Agreement", "score": 23.5882329203, "published": true}, {"hash": "1qd7DOArCmc", "uri": "/contracts/1qd7DOArCmc#generating-units", "label": "Resource Adequacy Purchase Agreement", "score": 23.5718072655, "published": true}, {"hash": "34VWOXjrB92", "uri": "/contracts/34VWOXjrB92#generating-units", "label": "Resource Adequacy Purchase Agreement", "score": 22.9585828179, "published": true}], "size": 3, "snippet_links": [{"key": "unit-or-units", "type": "definition", "offset": [21, 34]}], "hash": "0e589d27847b0552201b0b5b5e37cce7", "id": 2}, {"snippet": "means the gas-fired combined cycle combustion turbines to be procured, installed and constructed in accordance with the EPC Contracts and located at the Site.", "samples": [{"hash": "9dxJjZ8ngsj", "uri": "/contracts/9dxJjZ8ngsj#generating-units", "label": "Credit Agreement (NRG Yield, Inc.)", "score": 26.5879534565, "published": true}, {"hash": "2nNKLd75d3x", "uri": "/contracts/2nNKLd75d3x#generating-units", "label": "Credit Agreement (NRG Yield, Inc.)", "score": 25.5968514716, "published": true}, {"hash": "e5B5LQzFjmo", "uri": "/contracts/e5B5LQzFjmo#generating-units", "label": "Credit Agreement (NRG Yieldco, Inc.)", "score": 24.1184120465, "published": true}], "size": 3, "snippet_links": [{"key": "in-accordance-with", "type": "definition", "offset": [97, 115]}, {"key": "epc-contracts", "type": "definition", "offset": [120, 133]}, {"key": "the-site", "type": "clause", "offset": [149, 157]}], "hash": "e278b2fa2f97277c8d042a93fc9783b9", "id": 3}, {"snippet": "means the generating unit(s) specified in Recital B and more specifically described Section 1.2.2 and Appendix 1.1.", "samples": [{"hash": "8LkiYfSuzs7", "uri": "/contracts/8LkiYfSuzs7#generating-units", "label": "Power Purchase Tolling Agreement", "score": 33.3036020378, "published": true}, {"hash": "dx7xIHJnZhD", "uri": "/contracts/dx7xIHJnZhD#generating-units", "label": "Power Purchase Tolling Agreement", "score": 25.1295068667, "published": true}, {"hash": "Ng2ZGd0wkr", "uri": "/contracts/Ng2ZGd0wkr#generating-units", "label": "Power Purchase Tolling Agreement", "score": 24.4379175419, "published": true}], "size": 3, "snippet_links": [{"key": "recital-b", "type": "clause", "offset": [42, 51]}, {"key": "more-specifically", "type": "clause", "offset": [56, 73]}], "hash": "9e3d3e468250717cceafb29b22c6a287", "id": 4}, {"snippet": "means the generating units described in Schedule 2;", "samples": [{"hash": "eVQEH00vZ6R", "uri": "/contracts/eVQEH00vZ6R#generating-units", "label": "Rocof Agreement", "score": 26.152321283, "published": true}, {"hash": "7ENr00RcWbR", "uri": "/contracts/7ENr00RcWbR#generating-units", "label": "Rocof Agreement", "score": 25.8768741622, "published": true}], "size": 2, "snippet_links": [{"key": "schedule-2", "type": "definition", "offset": [40, 50]}], "hash": "483a2d41d90c1fb875dfb05ba65c13fb", "id": 5}, {"snippet": "means select turbine units as described further in the Contract Agreement 1.", "samples": [{"hash": "8pa8MVEm2yR", "uri": "https://documents1.worldbank.org/curated/en/099121924085030364/pdf/P1810291ac9fb70ed1ac70117f4ac4a77c6.pdf", "label": "Financing Agreement", "score": 23.7048382995, "published": false}], "size": 1, "snippet_links": [{"key": "contract-agreement", "type": "definition", "offset": [55, 73]}], "hash": "a0316cb1c88a45784d81796dd6b29ae2", "id": 6}, {"snippet": "means Owner\u2019s electricity and steam generation units, as applicable, including but not limited to combustion turbines and steam turbines, boilers, hydroelectric turbines or wind turbines installed as part of a project.", "samples": [{"hash": "cozK0ZJ3kXK", "uri": "/contracts/cozK0ZJ3kXK#generating-units", "label": "Operations, Maintenance and Ancillary Services Agreement (Stronghold Digital Mining, Inc.)", "score": 32.8521560575, "published": true}], "size": 1, "snippet_links": [{"key": "not-limited", "type": "clause", "offset": [83, 94]}, {"key": "wind-turbines", "type": "definition", "offset": [173, 186]}], "hash": "3966cbd48e3cb2d8595340ce2583c75e", "id": 7}, {"snippet": "The Geothermal Combined Cycle Unit (GCCU) consisting of one back pressure steam turbine and two (2) Ormat Energy Converters (OECs) driven by steam and one (1) Ormat Energy Converter (OEC) unit driven by brine.", "samples": [{"hash": "6lXTW0QKj5i", "uri": "/contracts/6lXTW0QKj5i#generating-units", "label": "Engineering, Procurement and Construction Contract (Ormat Technologies, Inc.)", "score": 19.0, "published": true}], "size": 1, "snippet_links": [{"key": "back-pressure", "type": "definition", "offset": [60, 73]}, {"key": "steam-turbine", "type": "definition", "offset": [74, 87]}, {"key": "energy-converter", "type": "definition", "offset": [165, 181]}], "hash": "c6c2329f0380779159d6bbd18610aab5", "id": 8}, {"snippet": "\u201cIntermediary\u201d and \u201cAEMO\u201d have the meanings given to those terms in the National Electricity Rules.", "samples": [{"hash": "5bkPWjJqrzX", "uri": "/contracts/5bkPWjJqrzX#generating-units", "label": "Interconnection Agreement", "score": 35.9262506849, "published": true}], "size": 1, "snippet_links": [{"key": "the-meanings", "type": "definition", "offset": [31, 43]}, {"key": "those-terms", "type": "clause", "offset": [53, 64]}, {"key": "national-electricity-rules", "type": "definition", "offset": [72, 98]}], "hash": "bdd91dae7a50e78b3839986ea4a7cf00", "id": 9}, {"snippet": "has the meaning given Connection Agreement; to that expression in the \u201cGenerator\u2019s Connection Plant and Apparatus\u201d has the meaning given Connection Agreement; to that expression in the", "samples": [{"hash": "d2b9LEvRBzh", "uri": "/contracts/d2b9LEvRBzh#generating-units", "label": "Transmission Use of System Agreement", "score": 29.3483213145, "published": true}], "size": 1, "snippet_links": [{"key": "connection-agreement", "type": "definition", "offset": [22, 42]}], "hash": "3b7821ab963591aebb993754d37a84de", "id": 10}], "next_curs": "Cl0SV2oVc35sYXdpbnNpZGVyY29udHJhY3RzcjkLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIZZ2VuZXJhdGluZy11bml0cyMwMDAwMDAwYQyiAQJlbhgAIAA=", "definition": {"title": "Generating Units", "snippet": "means the steam and gas turbine electric generators listed on Schedule 1.01(a).", "size": 27, "id": "generating-units", "examples": ["The Interconnection Customer shall conduct tests on the Electric Generating Unit as required by Good Utility Practice such as an open circuit \u201cstep voltage\u201d test on the Electric Generating Unit to verify proper operation of the Electric Generating Unit&#x27;s automatic voltage regulator.", "The Participating Generator shall be responsible for all its costs incurred in connection with operating and maintaining the <strong>Generating Units</strong> identified in Schedule 1 for the purpose of meeting its obligations under this Agreement.", "The Participating Generator represents that all necessary leases, approvals, permits, licenses, easements, rights of way or access to install, own and/or operate its <strong>Generating Units</strong> have been or will be obtained by the Participating Generator prior to the effective date of this Agreement.", "Whenever the Electric Generating Unit(s) is operated in parallel with the CAISO Controlled Grid, Interconnection Customer shall operate the Electric Generating Unit(s) with its governor or equivalent controls in service and responsive to frequency.", "Interconnection Customer shall ensure the primary frequency response capability of its Electric Generating Unit(s) by installing, maintaining, and operating a functioning governor or equivalent controls.", "The Participating Generator has provided to the CAISO in Schedule 1 the required information regarding the capacity and operating characteristics of each of the <strong>Generating Units</strong> listed in that schedule.", "The Participating Generator has identified the <strong>Generating Units</strong> that it owns, operates or has a contractual entitlement to in Schedule 1, as required by Section 4.6.4 of the CAISO Tariff.", "In the event that the Participating Generator no longer wishes to submit Bids and transmit Energy over the CAISO Controlled Grid, it may terminate this Agreement, on giving the CAISO not less than ninety (90) days written notice, provided, however, that in accordance with Section 4.1.3, the Participating Generator may modify Schedule 1 to eliminate <strong>Generating Units</strong> which it no longer owns or no longer has contractual entitlement to and such modification shall be effective upon receipt by the CAISO.", "If the Electric Generating Unit\u2019s voltage regulators are not capable of such automatic operation, the Interconnection Customer shall immediately notify the CAISO and the Participating TO and ensure that the Electric Generating Unit operates as specified in Article 9.6.2 through manual operation and that such Electric Generating Unit\u2019s reactive power production or absorption (measured in MVARs) are within the design capability of the Electric Generating Unit(s) and steady state stability limits.", "The droop characteristic shall be: (1) based on the nameplate capacity of the Electric Generating Unit(s), and shall be linear in the range of frequencies between 59 to 61 Hz that are outside of the deadband parameter; or (2) based on Applicable Reliability Standards providing for an equivalent or more stringent parameter."], "related": [["generating-unit", "Generating Unit", "Generating Unit"], ["electric-generating-unit", "Electric generating unit", "Electric generating unit"], ["operating-unit", "Operating Unit", "Operating Unit"], ["coating-unit", "Coating unit", "Coating unit"], ["electric-utility-steam-generating-unit", "Electric utility steam generating unit", "Electric utility steam generating unit"]], "related_snippets": [], "updated": "2025-07-06T21:58:36+00:00"}, "json": true, "cursor": ""}}