functional portion of the Project definition

functional portion of the Project means a portion of the Project for which construction has been completed and that can function independently, as determined by the U.S. Army Engineer, St. Louis District (hereinafter the “District Engineer”) in writing, although the remainder of the Project is not complete.
functional portion of the Project means a completed portion of the Project to be constructed under the Overall Work Plan as determined by the Board to be suitable to operate and maintain in advance of completion of construction of the entire Project.
functional portion of the Project means a portion of the Project for which construction has been completed and that can function independently, as determined by the U.S. Army Engineer, Walla Walla District (hereinafter the “District Engineer”) in writing, although the remainder of the Project is not complete.

Examples of functional portion of the Project in a sentence

  • The term "functional portion of the Project" shall mean a completed portion of the Project as determined by the Contracting Officer to be suitable for tender to the Local Sponsor to operate and maintain in advance of completion of construction of the entire Project.

  • Upon notification of completion of the entire Project or a functional portion of the Project, the Non-Federal Sponsor shall operate, maintain, repair, replace, and rehabilitate the entire Project or the functional portion of the Project, as provided in the agreement, at no cost to the Government.

  • When the District Engineer determines that the entire Project, or a functional portion of the Project, is complete, the District Engineer shall so notify the Non-Federal Sponsor in writing and furnish the Non-Federal Sponsor with a final Operation, Maintenance, Repair, Rehabilitation, and Replacement Manual (hereinafter the “OMRR&R Manual”) or, if the final OMRR&R Manual is not available, an interim OMRR&R Manual for the entire Project or such completed portion.

  • When the Government determines that the Project or a functional portion of the Project is complete, the Government shall turn the completed Project or functional portion over to the Local Sponsor, which shall accept the Project or functional portion and be solely responsible for operating, repairing, maintaining, replacing, and rehabilitating the Project or functional portion in accordance with Article VIII hereof.

  • Upon receipt of the notification from the District Engineer in accordance with ArticleII.D. of this Agreement and for so long as the Project remains authorized, the Non-Federal Sponsor, pursuant to Article II.E. of this Agreement, shall operate, maintain, repair, rehabilitate, and replace the entire Project or functional portion of the Project, at no cost to the Government.

  • After the Government has turned the completed Project, or functional portion of the Project, over to the Local Sponsor, the Local Sponsor shall operate, maintain, repair, replace, and rehabilitate the completed Project, or functional portion of the Project, in accordance with regulations or directions prescribed by the Government.

  • When the District Engineer determines that the entire Project, or a functional portion of the Project, is complete, the District Engineer shall so notify the Non-Federal Sponsor in writing and furnish the Non-Federal Sponsor with a copy of the final Operation, Maintenance, Repair, Rehabilitation, and Replacement Manual (hereinafter the “OMRR&R Manual”) or, if the final OMRR&R Manual is not available, an interim OMRR&R Manual for the entire Project or such completed portion.

  • The Government shall operate, maintain, repair, rehabilitate, and replace the entire Project or functional portion of the Project, at its costs and in accordance with applicable Federal and State laws as provided in Article VIII of this Agreement and specific directions prescribed by the Government in the interim or final OMRR&R Manual and any subsequent amendments thereto.

  • Upon receipt of the notification from the District Engineer in accordance with Article II.D. of this Agreement and for so long as the Project remains authorized, the Non-Federal Sponsor, pursuant to Article II.E. of this Agreement, shall operate, maintain, repair, rehabilitate, and replace the entire Project or functional portion of the Project, at no cost to the Government.

  • For all parcels comprising the Project on which there are no ongoing or potential future remediation activities conducted by the Department of the Army, as between the Government and the Non-Federal Sponsor, the Non-Federal Sponsor shall be considered the operator of the Project or a functional portion of the Project for purposes of CERCLA liability.


More Definitions of functional portion of the Project

functional portion of the Project. A completed portion of the Project to be constructed under the Overall Work Plan as determined by the Board to be suitable to operate and maintain in advance of completion of construction of the entire Project.
functional portion of the Project means a portion of the Project that is suitable for tender to the Non - Federal Sponsor to operate and maintain in advance of completion of the entire Project. For a portion of the Project to be suitable for tender, the District Engineer must notify the Non - Federal Sponsor in writing of the Government's determination that the portion of the Project is complete and can function independently and for a useful purpose, although the balance of the Project is not complete. J. The term "betterment" shall mean a change in the design and construction of an element of the Project resulting from the application of standards that the Government determines exceed those that the Government would otherwise apply for accomplishing the design and construction of that element. CED205TCA 3/12/98 7:34 AM ARTICLE II -- OBLIGATIONS OF THE GOVERNMENT AND THE NON - FEDERAL SPONSOR A. The Government, subject to the availability of funds and using those funds and funds provided by the Non - Federal Sponsor, shall expeditiously construct the Project (including alteration, lowering, raising, or replacement and attendant removal of existing railroad bridges and approaches thereto), applying those procedures usually applied to Federal projects, pursuant to Federal laws, regulations, and policies. 1. The Government shall afford the Non - Federal Sponsor the opportunity to review and comment on the solicitations for all contracts, including relevant plans and specifications, prior to the Government's issuance of such solicitations. The Government shall not issue the solicitation for the first construction contract until the Non - Federal Sponsor has confirmed in writing its willingness to proceed with the Project. To the extent possible, the Government shall afford the Non - Federal Sponsor the opportunity to review and comment on all contract modifications, including change orders, prior to the issuance to the contractor of a Notice to Proceed. In any instance where providing the Non - Federal Sponsor with notification of a contract modification or change order is not possible prior to issuance of the Notice to Proceed, the Government shall provide such notification in writing at the earliest date possible. To the extent possible, the Government also shall afford the Non - Federal Sponsor the opportunity to review and comment on all contract claims prior to resolution thereof. The Government shall consider in good faith the comments of the Non - Federal Sponsor, but the contents of s...
functional portion of the Project means a portion of the Project for which construction has been completed and that can function independently, as determined by the Program Management Consultant in writing, although the remainder of the Project is not complete.

Related to functional portion of the Project

  • Cost of the Project means and embraces the cost of construction; the cost of all

  • Constructional Plant means all equipments, materials, appliances or things of whatsoever nature required for execution, completion or maintenance of the works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Production Facilities (7 9) means "production equipment" and specially designed software therefor integrated into installations for "development" or for one or more phases of "production".

  • Project Facilities means the facilities, equipment and vehicles provided under the Project;

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Project Facility means facility being one or more of the following facilities as specified in the Special Conditions of Contract, being developed in accordance with the Project and the Detailed Project Implementation Report and includes all its buildings, equipment, facilities, software and systems and includes without limitation, where the circumstances so require, any expansion thereof from time to time and may include any new location to be separately mentioned in the Special Conditions of Contract.

  • Office of the Interconnection Control Center means the equipment, facilities and personnel used by the Office of the Interconnection to coordinate and direct the operation of the PJM Region and to administer the PJM Interchange Energy Market, including facilities and equipment used to communicate and coordinate with the Market Participants in connection with transactions in the PJM Interchange Energy Market or the operation of the PJM Region. On-Site Generators:

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • The Project means supply, installation, testing and commissioning, integration of computer hardware and services with support under Warranty and annual maintenance contract, if required for the contract period.

  • Customer Interconnection Facilities means all facilities and equipment owned and/or controlled, operated and maintained by Interconnection Customer on Interconnection Customer’s side of the Point of Interconnection identified in the appropriate appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions, or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Production facility means a facility in California at which gasoline or CARBOB is produced. Upon request of a producer, the executive officer may designate, as part of the producer's production facility, a physically separate bulk storage facility which (A) is owned or leased by the producer, and (B) is operated by or at the direction of the producer, and (C) is not used to store or distribute gasoline or CARBOB that is not supplied from the production facility.

  • Related facilities means any ancillary facilities owned by the Company which are —

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Cannabis cultivation facility means a person that:

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Scope of the Project shall have the meaning set forth in Clause 2.1;

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this article, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Ongoing Project means a multi-year project undertaken by a Company in fulfilment of its CSR obligation having timelines not exceeding three years excluding the financial year in which it was commenced, and shall include such project that was initially not approved as a multi-year project but whose duration has been extended beyond one year by the board based on reasonable justification;

  • Common Facilities means the facilities under D.G.sets/D.G.rooms, water storage tanks its pumping and supply system, sewerage & drainage systems, electric sub-station/ transformers/electric panels/distribution network, maintenance service rooms, lawns including lighting & services etc., roads, pathways & driveways including street lighting & services etc., guard posts, fire hydrants & fire fighting system etc. and all such facilities and areas for common use and excluded from the computation of Super Area of the Said Premises;

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • generation facility means a facility for generating electricity or providing ancillary services, other than ancillary services provided by a transmitter or distributor through the operation of a transmission or distribution system, and includes any structures, equipment or other things used for that purpose;

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.