Fully-Burdened Production Process Development Cost definition

Fully-Burdened Production Process Development Cost means, with respect to each Collaboration Antibody, One Hundred Percent (100%) of the consolidated fully burdened cost of Production Process Development of such Collaboration Antibody, which shall include (a) direct labor and material costs, (b) substrate and product quality assurance/control costs, (c) costs of any stability studies, (d) costs of losses or wastage in process development, to the extent not the result of negligence or the use of non-standard operating procedures, (e) facility and equipment depreciation costs, (f) facility and equipment validation and control costs, (g) costs associated with evaluation of safety profile, activity and quality of material in in vitro and in vivo uses, (g) costs required for manufacturing material for in vitro and in vivouses, (h) costs associated with submission and maintenance of regulatory documentation, (i) shipping costs, (j) costs related to subcontracted work, (k) expenses with respect to each of the foregoing, and (l) applicable allocable overhead, as determined in accordance with GAAP as applied by Medarex; (m) [*] percent ([*]%) of the sum of the components (a) through (l); (n) all of the manufacturer's allocable intellectual property and technology acquisition and license costs and expenses (including royalties, license fees, milestone payments and other payment obligations) paid to Third Parties with respect to Production Process Development of a Collaboration Antibody.

Examples of Fully-Burdened Production Process Development Cost in a sentence

  • Provide one part time inspector, three (3) hour work days for 5 shifts.

Related to Fully-Burdened Production Process Development Cost

  • Fully Burdened Manufacturing Cost means, with respect to any Licensed Product supplied by or on behalf of NVCR to Zai hereunder if such Licensed Product (or any precursor or intermediate thereof) is manufactured by a Third Party manufacturer [***].

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • Nuclear fuel cycle-related research and development activities means those activities which are specifically related to any process or system development aspect of any of the following: - conversion of nuclear material, - enrichment of nuclear material, - nuclear fuel fabrication, - reactors, - critical facilities, - reprocessing of nuclear fuel, - processing (not including repackaging or conditioning not involving the separation of elements, for storage or disposal) of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233, but do not include activities related to theoretical or basic scientific research or to research and development on industrial radioisotope applications, medical, hydrological and agricultural applications, health and environmental effects and improved maintenance.

  • Development Costs means costs incurred to obtain access to reserves and to provide facilities for extracting, treating, gathering and storing the oil and gas from reserves. More specifically, development costs, including applicable operating costs of support equipment and facilities and other costs of development activities, are costs incurred to:

  • Total Development Cost means the total of all costs incurred in the completion of a Development, all of which shall be subject to the review and approval by the Credit Underwriter and the Corporation pursuant to this rule chapter, and as further described in Rule 67-48.0075, F.A.C.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Manufacturing Cost means ***

  • Research and development facility means an establishment engaged in laboratory, scientific, or experimental testing and development related to new products, new uses for existing products, or improving existing products. The term does not include an establishment engaged in efficiency surveys, management studies, consumer surveys, economic surveys, advertising, promotion, banking, or research in connection with literary, historical, or similar projects.

  • Commercial Production means the operation of the Property or any portion thereof as a producing mine and the production of mineral products therefrom (excluding bulk sampling, pilot plant or test operations);

  • FTE Cost means, for any period, the FTE Rate multiplied by the number of FTEs in such period.

  • Development Phase means the period before a vehicle type is type approved.

  • Manufacturing operation means a process in which materials are changed, converted, or transformed into a different state or form from which they previously existed and includes refining materials, assembling parts, and preparing raw materials and parts by mixing, measuring, blending, or otherwise committing such materials or parts to the manufacturing process. "Manufacturing operation" does not include packaging.

  • Milk product or "dairy product" means cottage cheese, dry curd cottage cheese, reduced fat cottage cheese, lowfat cottage cheese, cream, light cream, light whipping cream, heavy cream, heavy whipping cream, whipped cream, whipped light cream, sour cream, acidified sour cream, cultured sour cream, half-and-half, sour half-and-half, acidified sour half-and-half, cultured sour half-and-half, reconstituted or recombined milk and milk products, concentrated milk, concentrated milk products, skim milk, lowfat milk, frozen milk concentrate, flavored milk, eggnog, buttermilk, cultured milk, cultured lowfat milk, cultured skim milk, yogurt, lowfat yogurt, nonfat yogurt, acidified milk, acidified lowfat milk, acidified skim milk, low-sodium milk, low-sodium lowfat milk, low-sodium skim milk, lactose-reduced milk, lactose-reduced lowfat milk, lactose-reduced skim milk, aseptically processed and packaged milk, milk products with added safe and suitable microbial organisms, and any other milk product made by the addition or subtraction of milkfat or addition of safe and suitable optional ingredients for protein, vitamin, or mineral fortification. Unless a product is considered a milk product under this subdivision, milk product does not include dietary products, infant formula, ice cream or other desserts, cheese, or butter. Milk products include the following:

  • Massive Multiauthor Collaboration Site (or “MMC Site”) means any World Wide Web server that publishes copyrightable works and also provides prominent facilities for anybody to edit those works. A public wiki that anybody can edit is an example of such a server. A “Massive Multiauthor Collaboration” (or “MMC”) contained in the site means any set of copyrightable works thus published on the MMC site.

  • Development Expenses means, with respect to SAIL Developments as well as HOME Developments when the HOME Development is also at least partially financed with a MMRB Loan (as defined in rule Chapter 67-21, F.A.C.), usual and customary operating and financial costs, such as the compliance monitoring fee, the financial monitoring fee, replacement reserves, the servicing fee and the debt service reserves. As it relates to SAIL Developments as well as HOME Developments when the HOME Development is also at least partially financed with a MMRB Loan (as defined in rule Chapter 67-21, F.A.C.) and to the application of Development Cash Flow described in subsections 67-48.010(5) and (6), F.A.C., as it relates to SAIL Developments or in paragraph 67-48.020(3)(b), F.A.C., as it relates to HOME Developments, the term includes only those expenses disclosed in the operating pro forma on an annual basis included in the final credit underwriting report, as approved by the Board, and maximum of 20 percent Developer Fee per year.

  • Commencement of Commercial Production means the first occurrence of Commercial Production in an Area.

  • Commercialization Costs means the out-of-pocket costs and expenses incurred by Adapt or its Affiliates directly attributable to, or reasonably allocable to, the Commercialization of a Product. Commercialization Costs for a Product shall include, preparation of promotional, advertising, communication, medical, and educational materials relating to the Product and other Product literature and selling materials, activities directed to marketing of the Product, including purchase of market data, development and conduct of market research, advertising, public relations, public affairs and other communications with Third Parties regarding the Product; development and conduct of sales force training (including materials, programs and travel to and attendance at training programs) for medical representatives responsible for promoting the Product; and development and maintenance of sales bulletins, call reporting and other monitoring/tracking, sales force targeting, validation and alignment programs and documentation.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Manufacturing Costs means the costs of Processing that generate Manufacturing Proceeds received by Grantor.

  • Development Project means a project for the development of land within a

  • Development Works means the external development works and internal development works on immovable property;

  • experimental development means acquiring, combining, shaping and using existing scientific, technological, business and other relevant knowledge and skills with the aim of developing new or improved products, processes or services. This may also include, for example, activities aiming at the conceptual definition, planning and documentation of new products, processes or services;

  • Economic development project means land and existing or planned improvements suitable for use by an industrial or commercial enterprise, or housing development, or the protection of the environment, including, but not limited to, groundwater or surface water. Economic development project includes necessary buildings, improvements, or structures suitable for and intended for or incidental to use as an industrial or commercial enterprise or housing development; and includes industrial park or industrial site improvements and port improvements or housing development incidental to an industrial or commercial enterprise; and includes the machinery, furnishings, and equipment necessary, suitable, intended for, or incidental to a commercial, industrial, or residential use in connection with the buildings or structures.

  • medium term expenditure framework ’ means a budgeting framework applied by the National Treasury which—