Fort Nelson Mainline definition

Fort Nelson Mainline means the residue gas transmission pipelines owned by Westcoast and extending from the outlet of the Fort Nelson Processing Plant to Compressor Station No. 2, and includes any residue gas laterals owned by Westcoast and connected to those pipelines.

Examples of Fort Nelson Mainline in a sentence

  • The South loop (KP 0 to 29.8) parallels the Fort Nelson Mainline system up to KP 16, then branches off and traverses undisturbed habitat and cut blocks for 13.8 km before connecting back to the Fort Nelson Mainline at the Willow Flats Compressor Station (CS2).

  • Subsequently, the contractor shall review the working arrangement from time to time.

  • The proposed Project would allow Westcoast to provide incremental firm transportation service from receipt points along the Fort Nelson Mainline, Aitken Creek Pipeline, and Fort St. John Mainline.

  • The City shall not cause damage to the Athletic Facilities and shall cause all trash generated by such use to be cleaned up promptly after any City-sponsored event.

  • Ultimately, a challenge competition could be used to identify more effective ways to fill any skills gaps identified by the assessment.• Improve supply linkages between mining companies and local producers and service providers.

  • The FNML includes approximately 24 km of 914 mm (36-inch) OD pipeline, following the existing Fort Nelson Mainline Pipeline, between compressor stations N4 and N5.

  • The northern component of the Project will provide incremental capacity on Westcoast‟s existing Fort Nelson Mainline to Compressor Station 2 (CS2).

  • Westcoast further states that the proposed North segment and a portion of the south segment will be routed contiguous to the existing Fort Nelson Mainline (T- north System) and specifically the existing N4 and N5 pipelines.In references ii) and iii) Westcoast indicates that the South Loop has approximately 14 km of non-contiguous routing of the total 29.8 km pipeline loop (49%) and will require 79.74 ha of both private and Crown land for permanent new right-of-way.

  • In particular, the N5 Loop will be routed on both Crown land and private lands contiguous to Westcoast’s existing Fort Nelson Mainline for approximately 95% of its length, as shown on the maps included in Appendix 1 to this application.

  • The planned in service date for the proposed facilities is December 1, 2012.Brief Description of Work:The primary component of the Project is a proposed 1067 mm (NPS 42) OD loop of Westcoast’s Fort Nelson Mainline commencing at CS-N5 located at c-67-I/94-B-01 and extending approximately 24 kilometres south to an endpoint north of Dinosaur Lake, BC at d-07-I/94-B-01 (“N5 Loop”).