๐น๐‘š๐‘Ž๐‘ฅ definition

๐น๐‘š๐‘Ž๐‘ฅย means the maximum admissible power flow;
๐น๐‘š๐‘Ž๐‘ฅย means the maximum admissible power flow; (bb) โ€˜๐น๐‘Ÿ๐‘’๐‘“ โ€™ means the reference flow;
๐น๐‘š๐‘Ž๐‘ฅย means: Maximum Admissible Power Flow;

Examples of ๐น๐‘š๐‘Ž๐‘ฅ in a sentence

  • Units: MHz, KHz, Hz (default) Range: Fmax = 20 KHz Fmin = 0.01 Hz Rounding: The value is rounded to 4 digits.

  • Fmax= 3.83 N (Sn) 3.09 N (Ag) Fmin= 1.74 N (Sn) 2.30 N (Ag) Fave= 2.39 N (Sn) 2.57 N (Ag) Complete the Visual Examination per section 6.2.1 noting any wear of the contact surfaces.

  • Maximum frequency trip point (Fmax) shall be 52Hz SOLAR: Network Agreement Form Date revised: 10 Feb 2018 Page 7 of 8 If voltage and/or frequency fall outside the set limits, the IES must be automatically disconnected from the Network.

  • Each VM has Vi = {Fmin, Fmax} set of working frequencies and Vi = {Vmin, Vmax} voltage range.

  • For simplicity, choose then the midpoint fee F = 1 (Fmin +Fmax) to sign the contract.

  • Fmax = 1/(5 ns * Wavelength) Fmin = 1/(100 S * Wavelength) Rounding: The value is rounded to 4 digits.

  • Engage Force USCAR 2, 5.2.1.3.3 1st mate engage force USCAR-2, 5.2.1.3.4 3.07 N 2.60 N 2.88 N December 2020 December 2020 Fmax= 3.38 N Fmin=2.17 N Favg= 2.63 N PV 10 10 Data from a current tool already qaulified for comparison: A-3.

  • Fmax = carrier frequency Fmin = 10 uHz Rounding: The value is rounded to 4 digits.

  • For suitable wA and wB, Fmin < Fmax is fulfilled and therefore, an interval of fees F in [Fmin, Fmax] ex- ist for which insurance contracts are mutually beneficial for both agents.

  • Agent B will have a minimum fee, Fmin, where they will accept to take over Aโ€™s risk and agent A will have a maximum fee, Fmax, they will accept to pay.


More Definitions of ๐น๐‘š๐‘Ž๐‘ฅ

๐น๐‘š๐‘Ž๐‘ฅย or โ€˜๐น๐‘š๐‘Ž๐‘ฅโ€™ means the maximum flow on a CNEC or combined dynamic constraint;
๐น๐‘š๐‘Ž๐‘ฅย means: Maximum Admissible Power Flow; (v) โ€˜Frefโ€™ means: Reference Flow;
๐น๐‘š๐‘Ž๐‘ฅย means the Maximum Financing Amount on the relevant Transfer Date
๐น๐‘š๐‘Ž๐‘ฅย means the Maximum Financing Amount
๐น๐‘š๐‘Ž๐‘ฅย means the maximum flow on a CNEC or combined dynamic constraint;
๐น๐‘š๐‘Ž๐‘ฅย means the maximum flow on critical network element, as referred to in Articles 23(3)(a) and 29(7)(a) of the CACM Regulation and applies equally to the flow-based and coordinated NTC approaches. It also means the capacity respecting operational security limits taking into account (or after deduction of) contingencies of critical network elements as referred to in Article 16(8) of Regulation (EU) 2019/943;