{"component": "definition", "props": {"groups": [{"size": 2, "snippet_links": [{"key": "the-building", "type": "definition", "offset": [0, 12]}, {"key": "building-shell-construction", "type": "clause", "offset": [52, 79]}, {"key": "preparation-and", "type": "clause", "offset": [128, 143]}, {"key": "tenant-improvement-work", "type": "clause", "offset": [182, 205]}, {"key": "exterior-walls", "type": "clause", "offset": [323, 337]}, {"key": "of-tenant", "type": "clause", "offset": [401, 410]}, {"key": "window-coverings", "type": "definition", "offset": [429, 445]}, {"key": "if-required", "type": "definition", "offset": [465, 476]}, {"key": "sanitary-sewer", "type": "definition", "offset": [541, 555]}, {"key": "length-of-the", "type": "clause", "offset": [617, 630]}, {"key": "shell-work", "type": "clause", "offset": [656, 666]}, {"key": "water-line", "type": "definition", "offset": [724, 734]}, {"key": "roof-structure", "type": "definition", "offset": [756, 770]}, {"key": "construction-of", "type": "clause", "offset": [810, 825]}, {"key": "toilet-facilities", "type": "clause", "offset": [838, 855]}, {"key": "plumbing-work", "type": "clause", "offset": [867, 880]}, {"key": "installation-of", "type": "clause", "offset": [941, 956]}, {"key": "plumbing-fixtures", "type": "definition", "offset": [957, 974]}, {"key": "gas-piping", "type": "definition", "offset": [1041, 1051]}, {"key": "process-piping", "type": "clause", "offset": [1053, 1067]}, {"key": "sole-discretion", "type": "definition", "offset": [1158, 1173]}, {"key": "remote-reader", "type": "definition", "offset": [1278, 1291]}, {"key": "building-common-area", "type": "definition", "offset": [1317, 1337]}, {"key": "electrical-room", "type": "clause", "offset": [1338, 1353]}, {"key": "air-conditioning", "type": "definition", "offset": [1381, 1397]}, {"key": "necessary-improvements", "type": "clause", "offset": [1423, 1445]}, {"key": "natural-gas", "type": "clause", "offset": [1455, 1466]}, {"key": "building-wall", "type": "definition", "offset": [1522, 1535]}, {"key": "tenant-space", "type": "clause", "offset": [1605, 1617]}, {"key": "work-includes", "type": "clause", "offset": [1634, 1647]}, {"key": "hvac-systems", "type": "definition", "offset": [1657, 1669]}, {"key": "piping-systems", "type": "clause", "offset": [1734, 1748]}], "snippet": "The Building Shell floor shall be exposed concrete. Building Shell construction includes flooring within the Common Area. Floor preparation and finishes within the demised space are tenant improvement work. PAINTING: Building Shell construction includes painting within the Common Area and painting of the exterior side of exterior walls. The interior side of exterior walls shall be finished as part of tenant improvement work. WINDOW COVERINGS: Window coverings, if required, are tenant improvement work. PLUMBING: One minimum 4\u201d diameter sanitary sewer waste line shall be installed under floor running the entire length of the Building Shell. Building Shell work also includes one minimum 1!4\u201d insulated overhead copper water line, installed below the roof structure directly above the sanitary sewer, and construction of Common Area toilet facilities. All other plumbing work, including water, waste, and vent piping and furnishing and installation of plumbing fixtures within the demised space, is tenant improvement work. Air piping, gas piping, process piping, and other special piping if required, are part of tenant improvement work. At Landlord\u2019s sole discretion, tenant improvement work shall include furnishing and installation of a private water sub- meter with a remote reader to be located within the building Common Area electrical room. HEATING, VENTILATION, AND AIR CONDITIONING: Building Shell includes necessary improvements to bring natural gas to a manifold location within two feet of the exterior building wall, with gas piping stubbed into the building and run overhead into the tenant space. Building Shell work includes complete HVAC systems and gas piping for the Common Area only. All other HVAC and gas piping systems are part of tenant improvement work.", "samples": [{"hash": "2QAbImEtUM7", "uri": "/contracts/2QAbImEtUM7#flooring", "label": "Lease (AbSci Corp)", "score": 30.4934976044, "published": true}, {"hash": "3lE86uw3smx", "uri": "/contracts/3lE86uw3smx#flooring", "label": "Lease (AbSci Corp)", "score": 30.4551676934, "published": true}], "hash": "7ffc47ed90fdd1641b0dbfff0c3ff8d0", "id": 1}, {"size": 1, "snippet_links": [{"key": "office-areas", "type": "definition", "offset": [17, 29]}, {"key": "exercise-room", "type": "clause", "offset": [58, 71]}, {"key": "meeting-rooms", "type": "clause", "offset": [77, 90]}, {"key": "special-areas", "type": "clause", "offset": [170, 183]}, {"key": "by-palomar", "type": "clause", "offset": [286, 296]}, {"key": "break-room", "type": "clause", "offset": [314, 324]}, {"key": "machine-shop", "type": "definition", "offset": [365, 377]}, {"key": "clean-room", "type": "definition", "offset": [420, 430]}, {"key": "loading-docks", "type": "definition", "offset": [741, 754]}, {"key": "the-product", "type": "clause", "offset": [895, 906]}, {"key": "ceramic-tile", "type": "clause", "offset": [945, 957]}, {"key": "core-toilets", "type": "clause", "offset": [1005, 1017]}, {"key": "reception-area", "type": "clause", "offset": [1057, 1071]}, {"key": "installation-of", "type": "clause", "offset": [1090, 1105]}, {"key": "higher-grade", "type": "clause", "offset": [1106, 1118]}, {"key": "cost-of", "type": "definition", "offset": [1217, 1224]}, {"key": "cove-base", "type": "definition", "offset": [1297, 1306]}], "snippet": "Flooring for all office areas, paneled workstation areas, Exercise Room, all meeting rooms, Sales/Marketing Demo room and related corridors (except as noted below under \"SPECIAL AREAS\") shall be 32 oz. carpet of usual commercial cut loop type with manufacturer and style to be approved by Palomar. Flooring in the Break Room, all enclosed R&D areas (except the R&D machine shop), all enclosed Engineering areas, the R&D Clean Room, Optics Assembly Room, TBD Lab, Training, all Test Bays, Depot Repair, Mfg. Mech./Elect. Lab, Documentation, IS Mgr., Tel room and related corridors shall be vinyl tile with the style to be approved by Palomar. Flooring in all remaining areas including the R&D Machine Shop, all caged/chain link fenced areas, loading docks, chassis and sub assembly areas, mechanical/electrical/sprinkler rooms to be painted with a polyurethane paint including walkway paths with the product and colors to be approved by Palomar. Ceramic tile will be on all floors and the wet areas of the core toilets, showers and the janitor's closet. The Reception Area shall require the installation of higher grade flooring (to be approved by Palomar). (Should any higher grade flooring be installed, the premium cost of that flooring over higher grade carpet to be at Palomar expense.) Vinyl cove base shall be installed in all areas.", "samples": [{"hash": "hH0RR1VQtS9", "uri": "/contracts/hH0RR1VQtS9#flooring", "label": "Commercial Lease (Palomar Medical Technologies Inc)", "score": 18.0, "published": true}], "hash": "68863c32af9639cd9a2022ddf94cf90e", "id": 2}, {"size": 1, "snippet_links": [{"key": "by-the-purchaser", "type": "clause", "offset": [71, 87]}], "snippet": "or \u201cFloors\u201d means any QUALITY FLOORING\u2019s SPC Hybrid flooring purchased by the purchaser.", "samples": [{"hash": "fm9LcE8QnsU", "uri": "https://www.qualityflooring.com.au/wp-content/uploads/2022/01/QF-Warranty-SPC-Hybrid-Flooring-1.pdf", "label": "www.qualityflooring.com.au", "score": 9.0369609856, "published": false}], "hash": "3526ca53627222169b62e43d0c91d294", "id": 3}, {"size": 1, "snippet_links": [{"key": "to-receive", "type": "definition", "offset": [65, 75]}, {"key": "main-service", "type": "definition", "offset": [117, 129]}, {"key": "three-phase", "type": "definition", "offset": [155, 166]}, {"key": "hvac-system", "type": "clause", "offset": [232, 243]}, {"key": "located-in", "type": "definition", "offset": [314, 324]}, {"key": "emergency-light", "type": "definition", "offset": [367, 382]}, {"key": "for-the-common-areas", "type": "clause", "offset": [442, 462]}], "snippet": "The existing, unfinished floors in Tenant spaces will be leveled to receive new flooring. Electrical: 13.8kv primary main service and 480/277 and 110/208, three phase, secondary. Distribution panels and feeders are provided for the HVAC system, lighting and utility power. Tenant spaces are serviced by sub-panels located in common electrical rooms on each floor. An emergency light and exit sign system is provided to meet code requirements for the common areas and unfinished tenant spaces.", "samples": [{"hash": "bKFcwiHaLpg", "uri": "/contracts/bKFcwiHaLpg#flooring", "label": "Lease (Software Com Inc)", "score": 18.0, "published": true}], "hash": "5155355690626a2c5aa07fb6882c8ade", "id": 4}, {"size": 1, "snippet_links": [{"key": "the-term", "type": "definition", "offset": [51, 59]}, {"key": "limited-warranty", "type": "definition", "offset": [61, 77]}, {"key": "coverages-provided", "type": "clause", "offset": [119, 137]}], "snippet": "\u201cproduct\u201d, \u201cproducts\u201d or some combination thereof. The term \u201cLimited Warranty\u201d is singular but encompasses any and all coverages provided for herein.", "samples": [{"hash": "knpJav05hVU", "uri": "/contracts/knpJav05hVU#flooring", "label": "Limited Warranty", "score": 31.6472870086, "published": true}], "hash": "b16a8ba63689996300ce4f429cbb6937", "id": 5}, {"size": 1, "snippet_links": [{"key": "building-standard", "type": "clause", "offset": [4, 21]}, {"key": "high-quality", "type": "clause", "offset": [78, 90]}, {"key": "resilient-floor-covering", "type": "definition", "offset": [244, 268]}, {"key": "in-lieu-of", "type": "clause", "offset": [283, 293]}, {"key": "tenant-may", "type": "definition", "offset": [330, 340]}, {"key": "commercially-reasonable", "type": "definition", "offset": [365, 388]}, {"key": "provided-tenant", "type": "definition", "offset": [410, 425]}, {"key": "construction-site", "type": "clause", "offset": [461, 478]}, {"key": "in-a-timely-manner", "type": "definition", "offset": [506, 524]}, {"key": "at-tenant", "type": "definition", "offset": [525, 534]}, {"key": "cost-and-expense", "type": "clause", "offset": [542, 558]}, {"key": "tenant-shall", "type": "clause", "offset": [574, 586]}, {"key": "a-credit", "type": "definition", "offset": [595, 603]}, {"key": "rentable-square-foot", "type": "definition", "offset": [663, 683]}, {"key": "the-premises", "type": "clause", "offset": [687, 699]}, {"key": "completion-of-the", "type": "clause", "offset": [734, 751]}, {"key": "initial-alterations", "type": "definition", "offset": [752, 771]}, {"key": "caused-by", "type": "clause", "offset": [772, 781]}, {"key": "tenant-delay", "type": "definition", "offset": [828, 840]}], "snippet": "The Building Standard carpet is a Blueridge Prodigy P371, broadloom, 28 ounce high quality cut and loop, direct glue down carpet offered in a choice of colors. Building Standard 1/8\" x 12\" x 12\" vinyl composition floor may be substituted where resilient floor covering is required. (In lieu of the above Building Standard carpet, Tenant may substitute its own new, commercially reasonable carpeting selection, provided Tenant purchases and delivers same to the construction site in sufficient quantity and in a timely manner at Tenant's sole cost and expense, in which case Tenant shall receive a credit for the unused Building Standard carpet equaling $1.25 per rentable square foot of the Premises. Any delay to the construction or completion of the Initial Alterations caused by such carpeting substitution shall be deemed a Tenant Delay.)", "samples": [{"hash": "dlJ1QL7UClK", "uri": "/contracts/dlJ1QL7UClK#flooring", "label": "Lease Agreement (National Patent Development Corp)", "score": 23.970568104, "published": true}], "hash": "b9e4d2580227ec42ae5ef0c84c162ca9", "id": 6}, {"size": 1, "snippet_links": [{"key": "lumber-liquidators", "type": "definition", "offset": [50, 68]}, {"key": "at-any-time", "type": "clause", "offset": [69, 80]}, {"key": "class-period", "type": "clause", "offset": [92, 104]}, {"key": "not-limited", "type": "clause", "offset": [119, 130]}, {"key": "product-names", "type": "definition", "offset": [146, 159]}], "snippet": "means Morning Star Strand Bamboo flooring sold by Lumber Liquidators at any time during the Class Period including but not limited to the list of product names and SKU numbers attached as Exhibit D.", "samples": [{"hash": "gjBQkzMB3Jk", "uri": "/contracts/gjBQkzMB3Jk#flooring", "label": "Settlement Agreement (Lumber Liquidators Holdings, Inc.)", "score": 30.8453114305, "published": true}], "hash": "3a9b2c669bd3bc696c735b31a464f9ad", "id": 7}, {"size": 1, "snippet_links": [{"key": "sanitary-ware", "type": "definition", "offset": [109, 122]}, {"key": "or-equivalent", "type": "definition", "offset": [163, 176]}, {"key": "master-bedroom", "type": "clause", "offset": [402, 416]}], "snippet": "Anti Skid Ceramic Tiles \u2022 WALL : Ceramic Tiles upto Door height \u2022 CEILING : POP Finish \u2022 DOOR : Flush Door \u2022 SANITARY WARE : Sanitary ware of Hindware / Parryware or equivalent brand \u2022 CP FITTINGS : Sleek C P Fittings from Jaquar or equivalent make \u2022 ELECTRICAL :Concealed Wiring with Modular Switches of reputed make, Provision for light, geyser and exhaust points \u2022 OTHERS : Granite basin counter in master bedroom only \u2b9a LIFTS : Automatic High Speed elevators of reputed make \u2b9a LOBBY : Lobbies with Elegant lift fa\u00e7ade \u2b9a OUTDOOR FINISH : Partly Claded Stone looks and balance in Paint", "samples": [{"hash": "fBZxKGtATBU", "uri": "/contracts/fBZxKGtATBU#flooring", "label": "Buyers Agreement", "score": 28.1919481089, "published": true}], "hash": "88138c4870a2a8db3158f9146d8918cd", "id": 8}, {"size": 1, "snippet_links": [{"key": "line-of-credit", "type": "clause", "offset": [47, 61]}, {"key": "by-ms", "type": "clause", "offset": [88, 93]}, {"key": "financial-institution", "type": "definition", "offset": [108, 129]}, {"key": "minimum-amount", "type": "clause", "offset": [187, 201]}, {"key": "from-time-to-time", "type": "clause", "offset": [226, 243]}, {"key": "in-order-to", "type": "clause", "offset": [245, 256]}, {"key": "vehicle-inventory", "type": "definition", "offset": [319, 336]}], "snippet": "means the unrestricted and exclusive wholesale line of credit required to be maintained by MS Dealer with a financial institution recognized and deemed acceptable by McLaren MS, and in a minimum amount specified by McLaren MS from time to time, in order to purchase and maintain MS \u2587\u2587\u2587\u2587\u2587\u2587\u2019s required McLaren Motorsport Vehicle inventory;", "samples": [{"hash": "hw47U37D6xf", "uri": "/contracts/hw47U37D6xf#flooring", "label": "McLaren Motorsport Dealer Agreement", "score": 31.0018727576, "published": true}], "hash": "e67d9128f7ad37efc453edf6659bd21a", "id": 9}, {"size": 1, "snippet_links": [{"key": "by-the-purchaser", "type": "clause", "offset": [62, 78]}], "snippet": "or \u201cFloors\u201d means any Made by Block timber flooring purchased by the purchaser.", "samples": [{"hash": "1hZzDeakQQi", "uri": "https://mosaicproperty.com.au/wp-content/uploads/2024/03/Made-by-Block-Timber-Flooring-Product-Warranty.pdf", "label": "mosaicproperty.com.au", "score": 10.5576190122, "published": false}], "hash": "bb76c28e10b5432aa9cdb83dd93d2e89", "id": 10}], "next_curs": "ClUST2oVc35sYXdpbnNpZGVyY29udHJhY3RzcjELEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIRZmxvb3JpbmcjMDAwMDAwMGEMogECZW4YACAA", "definition": {"title": "Flooring", "size": 19, "snippet": "The Building Shell floor shall be exposed concrete. Building Shell construction includes flooring within the Common Area. Floor preparation and finishes within the demised space are tenant improvement work. PAINTING: Building Shell construction includes painting within the Common Area and painting of the exterior side of exterior walls. The interior side of exterior walls shall be finished as part of tenant improvement work. WINDOW COVERINGS: Window coverings, if required, are tenant improvement work. PLUMBING: One minimum 4\u201d diameter sanitary sewer waste line shall be installed under floor running the entire length of the Building Shell. Building Shell work also includes one minimum 1!4\u201d insulated overhead copper water line, installed below the roof structure directly above the sanitary sewer, and construction of Common Area toilet facilities. All other plumbing work, including water, waste, and vent piping and furnishing and installation of plumbing fixtures within the demised space, is tenant improvement work. Air piping, gas piping, process piping, and other special piping if required, are part of tenant improvement work. At Landlord\u2019s sole discretion, tenant improvement work shall include furnishing and installation of a private water sub- meter with a remote reader to be located within the building Common Area electrical room. HEATING, VENTILATION, AND AIR CONDITIONING: Building Shell includes necessary improvements to bring natural gas to a manifold location within two feet of the exterior building wall, with gas piping stubbed into the building and run overhead into the tenant space. Building Shell work includes complete HVAC systems and gas piping for the Common Area only. All other HVAC and gas piping systems are part of tenant improvement work.", "id": "flooring", "examples": ["To be covered under this Cali Bamboo limited warranty, the Warranty Holder must provide documentation of sales order and proof that the <strong>Flooring</strong> was properly installed in accordance with the Installation Guide (defined below).", "This limited warranty only applies when the <strong>Flooring</strong> is used under normal traffic and other usage conditions.", "For specific instructions on how to obtain warranty service for defective <strong>Flooring</strong>, visit the Cali Bamboo website \u2587\u2587\u2587\u2587\u2587://\u2587\u2587\u2587.\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587.\u2587\u2587\u2587/<strong>flooring</strong>-warranty/.", "The limited warranty for Manufacturing Defects does not apply after the Warranty Holder has installed the <strong>Flooring</strong>, and product variation or error that does not exceed the 5% industry standard is not considered a Manufacturing Defect for purposes of this limited warranty.", "Labor costs, including any expenses associated with installation and removal of defective <strong>Flooring</strong>, are not covered by this limited warranty.", "You should ask the owner whether Magnesite <strong>Flooring</strong> is present and/or seek advice from a Structural Engineer.", "Offshore Stock Option Plan and the Interface <strong>Flooring</strong> Systems, Inc.", "The Warranty Holder must inspect the <strong>Flooring</strong> for Manufacturing Defects caused by improper milling, grading, staining and coating, and report any such defects to Cali Bamboo, prior to installation of the <strong>Flooring</strong>.", "No inspection for Magnesite <strong>Flooring</strong> was carried out at the property and no report on the presence or absence of Magnesite <strong>Flooring</strong> is provided.", "This limited warranty is not transferable by the Warranty Holder to any other party, including but not limited to a subsequent purchaser of the Residential Building in which the <strong>Flooring</strong> is installed."], "related": [["glass", "Glass", "Glass"], ["paint", "Paint", "Paint"], ["plumbing", "Plumbing", "Plumbing"], ["mooring", "Mooring", "Mooring"], ["roof", "Roof", "Roof"]], "related_snippets": [], "updated": "2025-07-06T21:56:50+00:00"}, "json": true, "cursor": ""}}