Final Performance Test Report definition

Final Performance Test Report shall have the meaning given to such term in Section 17.6(b).
Final Performance Test Report shall have the meaning set forth in Section 17.7(b) (“Timing”).

Examples of Final Performance Test Report in a sentence

  • If Buyer disputes the accuracy of the Performance Tests results in the Final Performance Test Report, then Seller shall re-perform the applicable Performance Tests (or part thereof) in accordance with the procedures set forth in Appendix H.

  • If PacifiCorp disputes the results of the Performance Tests in the Final Performance Test Report, then Developer shall re-perform the applicable Performance Tests (or part thereof) in accordance with the procedures set forth in Appendix AA.

  • All amounts payable as liquidated damages under this article 24 shall be made by Developer to PacifiCorp as follows: (i) in the case of Delay Liquidated Damages, thirty (30) days after the final day of each month during which liquidated damages became payable pursuant to Section 24.3; and (ii) in the case of Performance Liquidated Damages, if applicable, thirty (30) days after PacifiCorp’s receipt of the Final Performance Test Report or as otherwise provided in Appendix AA.

  • Until the necessary corrections have been made, the conditions of the contract shall not be considered fulfilled.Fuel, water and electric power required for "Performance Tests" shall be provided by the Contractor.Seven (7) copies of the Final Performance Test Report shall be submitted to the Engineer not later than one (1) month after completion of the performance tests.

  • Clean Water Limited must submit a Final Performance Test Report to EPA and Ohio EPA containing the results of TOC and HAP performance testing, including as an addendum to the completed Final Performance Test Report information regarding partial, incomplete, or cancelled test runs, no later than sixty (60) Days after completing the performance testing.

  • The Final Performance Test Report shall reflect the Parties’ consultation with one another with respect to the Preliminary Performance Test Report.

  • After the Repair Period as detailed above the Purchaser shall perform Final Performance Test, and shall issue within one (1) additional month a Final Performance Test Report.

  • Final Performance Test Report: Narrative of the sampling activities, a copy of the original sampling log, photographs showing locations of velocity and pressure measurements, tabular summary of velocity, airflow rates, pressure, H2S removal data, general odor removal data, calculated results, and conclusions of these results.

  • Performance Liquidated Damages shall be due and payable upon the earlier of (a) thirty (30) days following delivery of the Final Performance Test Report, or (b) the Final Completion Date.

Related to Final Performance Test Report

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Annual performance report means a written appraisal of the teaching staff member's performance prepared by the teaching staff member’s designated supervisor based on the evaluation rubric for his or her position.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.

  • Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.

  • Test Report means a written report issued by The Sequoia Project that documents the outcomes of the Testing Process; that is, the Applicant’s compliance with the Specifications and Test Materials.

  • Performance Report has the meaning set out in clause 8.2;

  • Performance Review means a summative evaluation of a teacher other than a beginning teacher and used to determine whether the teacher’s practice meets school district expectations and the Iowa teaching standards, and to determine whether the teacher’s practice meets school district expectations for career advancement in accordance with Iowa Code section 284.7.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Performance Milestone means an act or event specified in section 5.1 and described in section 9 of the EPLA.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Energy savings performance contract means a contract under which the rate of payments is based upon energy and operational cost savings and a stipulated maximum energy consumption level over the life of the contract.

  • Root Cause Analysis Report means a report addressing a problem or non-conformance, in order to get to the ‘root cause’ of the problem, which thereby assists in correcting or eliminating the cause, and prevent the problem from recurring.

  • performance requirement means a requirement that:

  • Quantitative fit test or "QNFT" means an assessment of the adequacy of respirator fit by numerically measuring the amount of leakage into the respirator.

  • Subprojects means more than one such Subproject.

  • Energy Performance Score means the numeric rating generated by Portfolio Manager that compares the Energy usage of the building to that of similar buildings.

  • Test Plan means a plan: for the Testing of the Deliverables; and setting out other agreed criteria related to the achievement of Milestones, as described further in paragraph 4 of Call of Schedule 5 (Testing);

  • Project Milestones means the project milestones set forth in Schedule-G;

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • Internal test assessment means, but is not limited to, conducting those tests of quality assurance necessary to ensure the integrity of the test.

  • Performance Level means a reference to one of Performance Level I, Performance Level II, Performance Level III, Performance Level IV or Performance Level V.

  • Extreme performance coating means coatings designed for harsh exposure or extreme environmental conditions.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Performance Requirements The ordering entity reserves the right to inspect and verify that all deliveries are in accordance with specifications, both at the point of delivery and at the point of use. For orders that specify an “authorized party” to receive and inspect deliveries and/or installations, acceptance and inspection procedures must be performed by the” authorized party” to be considered and accepted by the ordering entity. Products inspected at the time of use are subject to refusal and return requirements for issues of quality such as defects in manufacturing and/or workmanship. Products will not be considered accepted by the ordering entity until the installation is complete for the applicable products.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are: