Final Outage Plan definition

Final Outage Plan has the meaning given such expression in Section 5.1(d);

Examples of Final Outage Plan in a sentence

  • Any changes to the Final Outage Plan requested by the SO14 allow the STOs to recover reasonably incurred costs from the SO at cost reflective rates.

  • Potential changes that could enhance the effectiveness of the outage change process could therefore be to: • extend the current duration of the Final Outage Plan through changes to the STC, for example move to 2 years; and • allow outage change costs to be remunerated over an extended window through changes to NGET’s Licence.

  • A City representative will inspect the buildings of the clients used as references.

  • The outage durations will be taken from the Final Outage Plan in the Transmission Outage and Generation Availability (TOGA) system as agreed at the end of the calendar year prior to scheme start, adjusted to reflect changes up to either the start of the incentive scheme or an agreed point beforehand.

  • At the year ahead stage, a significant amount of effort is spent by both National Grid and the STOs to optimise the outage plan before it becomes the Final Outage Plan.

  • The scope for cost recovery is currently limited to changes requested by the SO once the Final Outage Plan has been agreed i.e. changes to the plan developed in week 49.

  • As highlighted earlier, the scope for STO cost recovery for changes to the outage plan is currently limited to changes requested by the SO once the Final Outage Plan has been agreed i.e. changes to the plan developed in week 49.

  • The outage durations will be taken from the Final Outage Plan in the TOGA (Transmission Outage and Generation Availability) system as agreed at the end of the calendar year prior to scheme start, adjusted to reflect changes up to either the start of the scheme or an agreed point beforehand.

  • The current ‘within year’ timescale for the SO requesting changes to the Final Outage Plan does not always allow all outage changes requested by the SO to be agreed and implemented by the STOs because there is insufficient time from the request to allow optimal re-scheduling of the outages within the plan year.

  • For the networks in Scotland, there are arrangements in place through the STC to allow the SO to request changes to the agreed Final Outage Plan as system circumstances change to ensure continued delivery of quality and security of supply standards and where changes may help to reduce constraint costs.

Related to Final Outage Plan

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Outage has the meaning set forth in the CAISO Tariff.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Service Outage means an instance when the Customer is unable to route traffic to one or more Customer Sites via the Network, which results in Service Downtime;

  • Unscheduled Outage means an outage that is not a result of a Scheduled Outage;

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Project or unavailability of the Project in whole or in part from a Unit in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of a Unit for operation, in whole or in part, for maintenance or repair that is not a Planned Outage and not the result of Force Majeure.

  • Scheduled Outage has the meaning given to it in the Grid Code;

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Minimum Generation Emergency means an Emergency declared by the Office of the Interconnection in which the Office of the Interconnection anticipates requesting one or more generating resources to operate at or below Normal Minimum Generation, in order to manage, alleviate, or end the Emergency.

  • System Impact Study means an assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights. System Protection Facilities: “System Protection Facilities” shall refer to the equipment required to protect (i) the Transmission System, other delivery systems and/or other generating systems connected to the Transmission System from faults or other electrical disturbance occurring at or on the Customer Facility, and (ii) the Customer Facility from faults or other electrical system disturbance occurring on the Transmission System or on other delivery systems and/or other generating systems to which the Transmission System is directly or indirectly connected. System Protection Facilities shall include such protective and regulating devices as are identified in the Applicable Technical Requirements and Standards or that are required by Applicable Laws and Regulations or other Applicable Standards, or as are otherwise necessary to protect personnel and equipment and to minimize deleterious effects to the Transmission System arising from the Customer Facility. Transmission Facilities:

  • PJM Region Peak Load Forecast means the peak load forecast used by the Office of the Interconnection in determining the PJM Region Reliability Requirement, and shall be determined on both a preliminary and final basis as set forth in Tariff, Attachment DD, section 5.

  • Phase III Trial means a Clinical Trial of an investigational product in subjects that incorporates accepted endpoints for confirmation of statistical significance of efficacy and safety with the aim to generate data and results that can be submitted to obtain Regulatory Approval as described in 21 C.F.R. 312.21(c), or a comparable Clinical Trial prescribed by the relevant Regulatory Authority in a country other than the United States.

  • Phase II Trial means a clinical trial of a Licensed Product on patients, including possibly pharmacokinetic and dose ranging studies, the principal purposes of which are to make a preliminary determination that such Licensed Product is safe for its intended use and to obtain sufficient information about such Licensed Product’s efficacy to permit the design of further clinical trials, and generally consistent with 21 CFR §312.21(b), or its successor regulation, or the equivalent in any foreign country.

  • Planned Downtime means any period of time during which the Service is unavailable due to Conga’s planned maintenance and support of the Service or Conga System. Planned Downtime shall not exceed 5 hours per month. Conga will endeavor to give at least 24 hours’ notice before Planned Downtime except for urgent circumstances (e.g., a system failure or security threat). Planned Downtime occurs from 10:00 p.m. Friday through 1:00 p.m. Sunday, Mountain Time.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Maximum Generation Emergency means an Emergency declared by the Office of the Interconnection to address either a generation or transmission emergency in which the Office of the Interconnection anticipates requesting one or more Generation Capacity Resources, or Non- Retail Behind The Meter Generation resources to operate at its maximum net or gross electrical power output, subject to the equipment stress limits for such Generation Capacity Resource or Non-Retail Behind The Meter resource in order to manage, alleviate, or end the Emergency.

  • Excused Downtime means the number of minutes in the Charging Period, rounded to the nearest minute that the link state of Customer’s Port is ‘down’ due to:

  • Unscheduled Downtime means any time when any or all of the applications and Services provided by the Supplier to the Customer shall be unavailable to the Customer due to unexpected system failures other than Scheduled Downtime or the downtime is attributable to events not under the control of the Supplier.

  • Capacity Export Transmission Customer means a customer taking point to point transmission service under Tariff, Part II to export capacity from a generation resource located in the PJM Region that has qualified for an exception to the RPM must-offer requirement as described in Tariff, Attachment DD, section 6.6(g).

  • Phase III Study means a human clinical trial that is prospectively designed to demonstrate statistically whether a product is safe and effective for use in humans in a manner sufficient to obtain regulatory approval to market such product in patients having the disease or condition being studied as described in 21 C.F.R. § 312.21(c) (FDCA), as amended from time to time, and the foreign equivalent thereof.

  • Cannabis testing facility means an entity registered by

  • Subproject means a specific water and/or sanitation Subproject financed or to be financed by a Subproject Grant (as hereinafter defined) provided from the proceeds of the Credit under Part C.1 of the Project;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.