Final Commissioning definition

Final Commissioning means, as the context requires, the final commissioning of (i) the Secondary Distribution Network (ii) the Customer Meters and CIUs, or (iii) the HIUs, in accordance with the Technical Specifications, including demonstrating the operation of the control and monitoring systems of the Secondary Distribution Network, Customer Meters, CIUs and the HIUs.
Final Commissioning means, as the context requires, the final commissioning of [(i) the Energy Plant and Equipment, (ii) the Primary Distribution Network, and (iii) the Secondary Distribution Network], in accordance with the Technical Specification, including demonstrating the operation of the control and monitoring systems of the [Energy Plant and Equipment, the Primary Distribution Network and the Secondary Distribution Network], and including a system proving period of at least [2 weeks] after completion of all testing and commissioning.
Final Commissioning means the earlier of (a) the date on which electricity is exported to the grid on a commercial basis from the last of the wind turbines forming part of the Development erected in accordance with this consent; or (b) the date falling 18 months from the date of First Commissioning unless a longer period is agreed in writing in advance with the Planning Authority.

Examples of Final Commissioning in a sentence

  • The Developer shall give ESCo not less than [fourteen (14)] calendar days’ notice of completion of the Final Commissioning activities.

  • On completion of the Final Commissioning, ESCo shall, undertake the Final Inspection of the Primary Distribution Network, to assess whether the Primary Distribution Network has been designed and installed in accordance with the Technical Specification and is free from any Non-Conformities.

  • Not later than [seven (7)] days after the Final Commissioning of the Primary Distribution Network, ESCo shall provide a final Schedule of Non-Conformities to the Developer, clearly scheduling which elements of the Primary Distribution Network have Non-Conformities.

  • Not later than [seven (7)] days after the Final Commissioning of the Secondary Distribution Network, ESCo shall provide a final Schedule of Non-Conformities to the Developer, clearly scheduling which elements of the Secondary Distribution Network have Non-Conformities.

  • Not later than [fourteen (14)] days before the commencement of the Final Commissioning of the Secondary Distribution Network the Developer shall provide ESCo with the following information: updated installation drawings in pdf and AutoCAD format to reflect the status of the installation at that time; testing and commissioning records; and method statements for the proposed testing and commissioning for review.


More Definitions of Final Commissioning

Final Commissioning means the completion of the commissioning of the [facility] [systems and equipment] under the specified conditions once available, and providing a completed installation that meets the operational requirements specified in the Contract Documents. Completion of Final Commissioning is a prerequisite to Total Performance of the Work.
Final Commissioning means the earlier of (a) the date on which electricity is exported to the grid on a commercial basis from the last of the wind turbines forming part of the development erected in accordance with this consent; or (b) the date 18
Final Commissioning means the earlier of (i) the date on which electricity is exported to the grid on a commercial basis from the last of the wind turbines forming part of the Development erected in accordance with the section 36 consent and the planning permission deemed to be granted upon varying that section 36 consent or (ii) the date falling 24 months from the date of First Commissioning;
Final Commissioning means the date on which the last wind turbine forming part of the Development is commissioned and exporting electricity;
Final Commissioning means, as the context requires, the final commissioning of Internal Secondary Distribution Network, Metering Systems or HIUs, in accordance with the Specification and the provisions of this Schedule 8 (Take Over Process in respect of Pre-Installed Managed Equipment).
Final Commissioning means the commissioning of the BP Meter Facilities into service consistent with generally accepted pipeline industry standards.
Final Commissioning means the time when VAA signs off indicating the acceptance of equipment, software and that all deficiencies have been corrected.