Failover Readiness Testing definition

Failover Readiness Testing means testing of the procedures for transferring Your production operation from one server to another.
Failover Readiness Testing means the process of moving or testing procedures for moving production work from a production server to another server.

Examples of Failover Readiness Testing in a sentence

  • You may use Cold Disaster Recovery Licenses for Failover Readiness Testing as reasonable and necessary for up to twelve (12) days per calendar year.

Related to Failover Readiness Testing

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Cannabis testing facility means an entity registered by

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Pilot or "Payment in Lieu of Tax" shall mean any payment made to the Agency or an affected tax jurisdiction equal to all or a portion of the real property taxes or other taxes which would have been levied by or on behalf of an affected tax jurisdiction with respect to a project but for tax exemption obtained by reason of the involvement of the Agency in such project, but such term shall not include Agency fees.

  • Make-Ready Work means all work performed or to be performed to prepare AT&T-22STATE’s Conduit Systems, Poles or Anchors and related Facilities for the requested occupancy or attachment of CLEC’s Facilities. Make-Ready Work includes, but is not limited to, clearing obstructions (e.g., by rodding Ducts to ensure clear passage), the rearrangement, transfer, replacement, and removal of existing Facilities on a Pole or in a Conduit System where such work is required solely to accommodate CLEC’s Facilities and not to meet AT&T-22STATE’s business needs or convenience. Make-Ready Work may require “dig ups” of existing Facilities and may include the repair, enlargement or modification of AT&T-22STATE’s Facilities (including, but not limited to, Conduits, Ducts, Handholes and Manholes) or the performance of other work required to make a Pole, Anchor, Conduit or Duct usable for the initial placement of CLEC’s Facilities.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Double check valve assembly means an assembly composed of two single, independently acting, check valves including tightly closing shutoff valves located at each end of the assembly and suitable connections for testing the water tightness of each check valve.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • SFDR means Regulation (EU) 2019/2088 of the European Parliament and of the Council of 27 November 2019 on sustainability‐related disclosures in the financial services sector;

  • Spacecraft (9) means active and passive satellites and space probes.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Backflow Prevention Assembly means any mechanical assembly installed at a water service line or at a plumbing fixture to prevent a backflow contamination event, provided that the mechanical assembly is appropriate for the identified contaminant at the cross connection and is an in-line field-testable assembly.

  • HEPA filter means a high efficiency particulate absolute air filter capable of trapping and retaining 99.97 percent of fibers greater than 0.3 micrometers in mass median aerodynamic diameter equivalent.

  • Propeller means for a device for propelling an aircraft that has blades on a powerplant driven shaft and that, when rotated, produces by its action on the air, a thrust approximately perpendicular to its plane of rotation and it includes control components normally supplied by its manufacturer, but does not include main and auxiliary rotors or rotating airfoils of powerplants;

  • Backflow preventer means a device or means to prevent backflow.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • NOC means Network and Support Operating Centre.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Service Specification means and include detailed description, statements to technical data, performance characteristics, and standards (Indian as well as) as applicable and as specified in the Contract as well as those specifications relating to Industry standards and codes applicable to the performance of the work, work performance quality and the specifications affecting the works or any additional specification required to be produced by the DCO to meet the design criteria.