{"component": "definition", "props": {"groups": [{"samples": [{"hash": "jcaDgdKzqfe", "uri": "/contracts/jcaDgdKzqfe#facility-capacity", "label": "Tolling Agreement", "score": 31.9522075653, "published": true}, {"hash": "d3tirXHOU7Z", "uri": "/contracts/d3tirXHOU7Z#facility-capacity", "label": "Tolling Agreement", "score": 29.1710414886, "published": true}, {"hash": "1r99jhBDswE", "uri": "/contracts/1r99jhBDswE#facility-capacity", "label": "Tolling Agreement", "score": 29.1710414886, "published": true}], "snippet": "means the maximum Capacity of the Facility, expressed in MW, when operated consistent with the manufacturer\u2019s recommended power factor and operating parameters, as set forth in Exhibit A.", "snippet_links": [{"key": "maximum-capacity", "type": "clause", "offset": [10, 26]}, {"key": "the-facility", "type": "clause", "offset": [30, 42]}, {"key": "the-manufacturer", "type": "definition", "offset": [91, 107]}, {"key": "power-factor", "type": "clause", "offset": [122, 134]}, {"key": "operating-parameters", "type": "definition", "offset": [139, 159]}], "size": 12, "hash": "b5e1f59b1792f818ce77ad17770064ee", "id": 1}, {"samples": [{"hash": "enlDqcLfIDY", "uri": "/contracts/enlDqcLfIDY#facility-capacity", "label": "Engineering, Procurement and Construction Agreement (Sunpower Corp)", "score": 24.5236148834, "published": true}, {"hash": "77WwdydoZBy", "uri": "/contracts/77WwdydoZBy#facility-capacity", "label": "Engineering, Procurement and Construction Agreement (Sunpower Corp)", "score": 24.5236148834, "published": true}, {"hash": "l9oEEzv9cV8", "uri": "/contracts/l9oEEzv9cV8#facility-capacity", "label": "Engineering, Procurement and Construction Agreement (Sunpower Corp)", "score": 24.151266098, "published": true}], "snippet": "means, with respect to the Facility, the sum of the Final Test Results of all of the Blocks, pursuant to the provisions of Exhibit 16A.", "snippet_links": [{"key": "to-the-facility", "type": "definition", "offset": [20, 35]}, {"key": "sum-of", "type": "clause", "offset": [41, 47]}, {"key": "final-test-results", "type": "definition", "offset": [52, 70]}, {"key": "the-provisions-of", "type": "clause", "offset": [105, 122]}], "size": 5, "hash": "8c363cb687404863009cb47cee0a0b92", "id": 2}, {"samples": [{"hash": "kfXJ1232LiO", "uri": "/contracts/kfXJ1232LiO#facility-capacity", "label": "Loan Agreement (American Retirement Corp)", "score": 18.0, "published": true}, {"hash": "2teehjGWSUu", "uri": "/contracts/2teehjGWSUu#facility-capacity", "label": "Loan Agreement (American Retirement Corp)", "score": 18.0, "published": true}], "snippet": "means the total number of independent living units and the total number of assisted living units and skilled nursing beds, if applicable, in the Projects.", "snippet_links": [{"key": "total-number-of", "type": "definition", "offset": [10, 25]}, {"key": "independent-living-units", "type": "definition", "offset": [26, 50]}, {"key": "assisted-living-units", "type": "definition", "offset": [75, 96]}, {"key": "skilled-nursing-beds", "type": "definition", "offset": [101, 121]}, {"key": "if-applicable", "type": "clause", "offset": [123, 136]}, {"key": "the-projects", "type": "clause", "offset": [141, 153]}], "size": 4, "hash": "b4287d2136c321d42ea68fcb48d5d0d3", "id": 3}, {"samples": [{"hash": "kQLCmiWXkxY", "uri": "/contracts/kQLCmiWXkxY#facility-capacity", "label": "Power Purchase Agreement (Aes Ironwood LLC)", "score": 18.0, "published": true}, {"hash": "jPfCDGkBubF", "uri": "/contracts/jPfCDGkBubF#facility-capacity", "label": "Power Purchase Agreement (Aes Ironwood LLC)", "score": 18.0, "published": true}, {"hash": "8VoFjBwS76M", "uri": "/contracts/8VoFjBwS76M#facility-capacity", "label": "Power Purchase Agreement (Aes Ironwood LLC)", "score": 18.0, "published": true}], "snippet": "the actual total net MW capability of the Facility measured at the Electric Delivery Point (excluding the incremental capacity associated with power augmentation in the event that power augmentation is implemented at the Facility pursuant to Section 3.3 of this Agreement) when operating on Natural Gas in Combined Cycle Mode at 92(degree) Fahrenheit ambient air temperature as established during Initial Start-Up Testing of the Facility and as demonstrated pursuant to Section 9.6 and as adjusted accordingly.", "snippet_links": [{"key": "electric-delivery-point", "type": "definition", "offset": [67, 90]}, {"key": "incremental-capacity", "type": "definition", "offset": [106, 126]}, {"key": "associated-with", "type": "definition", "offset": [127, 142]}, {"key": "power-augmentation", "type": "definition", "offset": [143, 161]}, {"key": "in-the-event", "type": "clause", "offset": [162, 174]}, {"key": "at-the-facility", "type": "definition", "offset": [214, 229]}, {"key": "section-33", "type": "clause", "offset": [242, 253]}, {"key": "this-agreement", "type": "clause", "offset": [257, 271]}, {"key": "natural-gas", "type": "definition", "offset": [291, 302]}, {"key": "air-temperature", "type": "definition", "offset": [359, 374]}, {"key": "testing-of-the-facility", "type": "clause", "offset": [414, 437]}, {"key": "section-96", "type": "clause", "offset": [470, 481]}, {"key": "as-adjusted", "type": "definition", "offset": [486, 497]}], "size": 3, "hash": "7aca10c35b2f209538deee8826a92393", "id": 4}, {"samples": [{"hash": "9wGhnZSCZS8", "uri": "/contracts/9wGhnZSCZS8#facility-capacity", "label": "Trust Indenture (Aes Red Oak LLC)", "score": 18.0, "published": true}, {"hash": "1r8QixZXfln", "uri": "/contracts/1r8QixZXfln#facility-capacity", "label": "Trust Indenture (Aes Ironwood LLC)", "score": 18.0, "published": true}], "snippet": "has the meaning specified in the Power Purchase Agreement.", "snippet_links": [{"key": "power-purchase-agreement", "type": "definition", "offset": [33, 57]}], "size": 3, "hash": "3ebe15c49222f44c9401fbbe2e504c7b", "id": 5}, {"samples": [{"hash": "a257045MZKl", "uri": "http://www.metrovancouver.org/boards/Bylaws1/GVRD_Bylaw_1087%20-%20Unofficial%20Consolidation.pdf", "label": "www.metrovancouver.org", "score": 4.9726214409, "published": false}, {"hash": "cAPteNfM7R0", "uri": "http://www.metrovancouver.org/boards/Bylaws1/GVRD_Bylaw_1087.pdf", "label": "www.metrovancouver.org", "score": 3.0, "published": false}], "snippet": "means the sum of the individual capacities of all boilers or process heaters operating at the same location, facility or complex burning the same fuel, or as determined by the district director;", "snippet_links": [{"key": "sum-of", "type": "clause", "offset": [10, 16]}, {"key": "individual-capacities", "type": "clause", "offset": [21, 42]}, {"key": "same-location", "type": "definition", "offset": [94, 107]}, {"key": "district-director", "type": "definition", "offset": [176, 193]}], "size": 3, "hash": "82902fd4ca1cfda9007245f4649a04b4", "id": 6}, {"samples": [{"hash": "kGS9Kh0Aqm4", "uri": "http://my.solarroadmap.com/userfiles/SMUD-FIT-Rate-Policy-and-Procedure.pdf", "label": "my.solarroadmap.com", "score": 3.7953455448, "published": false}], "snippet": "means the maximum potential amount of electricity that a Facility can produce, measured at the delivery point in kilowatts or Megawatts (AC).", "snippet_links": [{"key": "maximum-potential", "type": "definition", "offset": [10, 27]}, {"key": "a-facility", "type": "definition", "offset": [55, 65]}, {"key": "delivery-point", "type": "definition", "offset": [95, 109]}], "size": 3, "hash": "6afebaae0258062385b8f4af2c8da727", "id": 7}, {"samples": [{"hash": "dHK5LzNplib", "uri": "/contracts/dHK5LzNplib#facility-capacity", "label": "Build Transfer Agreement", "score": 31.3390369415, "published": true}, {"hash": "dZkOxTiKLAv", "uri": "/contracts/dZkOxTiKLAv#facility-capacity", "label": "Engineering, Procurement and Construction Agreement", "score": 28.9648780823, "published": true}], "snippet": "means, with respect to the Facility, the Final Test Results pursuant to the Capacity Test.", "snippet_links": [{"key": "to-the-facility", "type": "definition", "offset": [20, 35]}, {"key": "final-test-results", "type": "definition", "offset": [41, 59]}, {"key": "pursuant-to-the", "type": "definition", "offset": [60, 75]}, {"key": "capacity-test", "type": "clause", "offset": [76, 89]}], "size": 2, "hash": "f48ab1e1058c6a4a17437bbb8dbf4526", "id": 8}, {"samples": [{"hash": "7ailekVeWbZ", "uri": "/contracts/7ailekVeWbZ#facility-capacity", "label": "Purchase & Sale Agreement (USA Synthetic Fuel Corp)", "score": 21.5722103119, "published": true}, {"hash": "c3rHZy7JyiR", "uri": "/contracts/c3rHZy7JyiR#facility-capacity", "label": "Purchase & Sale Agreement (USA Synthetic Fuel Corp)", "score": 21.5530452728, "published": true}], "snippet": "means approximately 488,660 MMBtu per day of Gas.", "snippet_links": [{"key": "day-of", "type": "clause", "offset": [38, 44]}], "size": 2, "hash": "57fdf814f697ba476571f197ac494e39", "id": 9}, {"samples": [{"hash": "ezDz4L5x8qf", "uri": "/contracts/ezDz4L5x8qf#facility-capacity", "label": "Supply Agreement (Commonwealth Industries Inc/De/)", "score": 18.0, "published": true}, {"hash": "8MSd3pnLeqr", "uri": "/contracts/8MSd3pnLeqr#facility-capacity", "label": "Supply Agreement (Imco Recycling Inc)", "score": 18.0, "published": true}], "snippet": "as used herein shall include but shall not be limited to, engineers, skilled and unskilled workmen, supervision, materials, supplies, tools, equipment and facilities.", "snippet_links": [{"key": "equipment-and-facilities", "type": "definition", "offset": [141, 165]}], "size": 2, "hash": "e3aa49915d2de71a5ee45a2862af8951", "id": 10}], "next_curs": "Cl4SWGoVc35sYXdpbnNpZGVyY29udHJhY3RzcjoLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIaZmFjaWxpdHktY2FwYWNpdHkjMDAwMDAwMGEMogECZW4YACAA", "definition": {"snippet": "means the maximum Capacity of the Facility, expressed in MW, when operated consistent with the manufacturer\u2019s recommended power factor and operating parameters, as set forth in Exhibit A.", "title": "Facility Capacity", "size": 61, "id": "facility-capacity", "examples": ["Large Generating Facility shall mean a Generating Facility having a Generating <strong>Facility Capacity</strong> of more than 20 MW.", "Generating <strong>Facility Capacity</strong> shall mean the net capacity of the Generating Facility and the aggregate net capacity of the Generating Facility where it includes multiple energy production devices.", "In the event of an unscheduled outage or curtailment exceeding twenty-five (25) percent of the <strong>Facility Capacity</strong> Rating (other than curtailments due to lack of motive force), Seller immediately shall notify PacifiCorp of the necessity of such unscheduled outage or curtailment, the time when such has occurred or will occur and the anticipated duration.", "Generating <strong>Facility Capacity</strong> shall mean the net capacity of the Generating Facility and the aggregate net capacity of the Generating Facility where it includes multiple Electric Generating Units.", "The foregoing estimates by Buyer shall not be construed to permit Seller to limit the availability of the Facility such that Buyer is restricted from Dispatching Contract Capacity unless the <strong>Facility Capacity</strong> is physically unavailable due to Force Majeure, Planned Outage or Unplanned Outage, as the case may be.", "In the case of substantial upgrades, PacifiCorp may require Seller to comply with Section 3.2.8(e) (in the event that the Facility upgrade causes the <strong>Facility Capacity</strong> Rating to exceed 3,000 kW) and increase its Minimum Annual Delivery obligation in Section 4.3 (if appropriate).", "As soon as practicable, if the Forced Outage resulted in more than five percent (5%) of the <strong>Facility Capacity</strong> being unavailable, the oral report shall be confirmed in writing.", "The Facilities Study will also identify any potential control equipment for requests for Interconnection Service that are lower than the Generating <strong>Facility Capacity</strong>.", "Seller shall be responsible for ensuring that any planned increase in the <strong>Facility Capacity</strong> Rating or the maximum instantaneous capacity of the Facility complies with Seller\u2019s Generation Interconnection Agreement and any other agreements with PacifiCorp.", "If Seller\u2019s Facility has a <strong>Facility Capacity</strong> Rating of 100 kW or less, Seller\u2019s failure to satisfy the minimum delivery obligation of Section 4.3 for two (2) consecutive years; else Seller\u2019s failure to satisfy the minimum delivery obligation of Section 4.3 for one year."], "related": [["generating-facility-capacity", "Generating Facility Capacity", "Generating <strong>Facility Capacity</strong>"], ["excess-capacity", "Excess capacity", "Excess capacity"], ["nameplate-capacity", "Nameplate capacity", "Nameplate capacity"], ["idle-capacity", "Idle capacity", "Idle capacity"], ["committed-capacity", "Committed Capacity", "Committed Capacity"]], "related_snippets": [], "updated": "2025-07-24T04:27:56+00:00"}, "json": true, "cursor": ""}}